Loading...
HomeMy WebLinkAbout20051175 Ver 1_USACE Permit_2005080211 7S U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT +? ? Ck Action ID. 200511674 County: Hyde USGS Quad: Ocracoke O 'Z 3*V GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Delores Fearing Address: 533 West Ocean Acres Drive Kill Devil Hills, North Carolina 27948 Telephone No.: 252-449-2896 Size and location of property (water body, road name/number, town, etc.): Lot 6 contains 10,000 square feet (0.23 acres) located on the north side of Sound Shore Drive within Jackson's Dunes subdivision in Ocracoke Hyde County, North Carolina. Description of projects area and activity: Fill 0.10 acres of section 404 wetlands for a driveway crossing. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ? Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 14 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N. C. Division of Coastal Management in Washington, NC, at (252) 946-6481. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact William Wescott at 252-975-1616 extension 25. Corps Regulatory Official VV.I^ ?•? ' Date: 07/29/2005 r Expiration Date of Verification: 03/18/2007 ? UG'9 1005 Page 1 of 2 Determination of Jurisdiction: ? reli;mit rya information, there appear to be waters of the US including wetlands within the above described project area. F] BasccT•ou.p oThispreUmiaxy determination is not an appealable action under the Regulatory Program Administrative Appeal Process _ •. Referel a 33 CFR Part 331). ? There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ? There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued 6/01/2005. Action ID 200511067 Basis of Jurisdictional Determination: Area meets the three parameters specified in the 1987 USACE Wetland Delineation Corps Regulatory Official: Date 07/29/2005 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: NC Division of Water Quality NC Ecosystem Enhancement Program Page 2 of 2 July 29, 2005 Regulatory Division Action ID No. 200511674 Delores Fearing 533 West Ocean Acres Drive Kill Devil Hills, North Carolina 27948 Permit Special Conditions Your work is authorized by Nationwide Permit 14 provided it is accomplished in strict accordance with the attached General Conditions and the following Special Conditions: a. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. b. The Permittee shall mitigate for 0.10 acre of wetlands associated with this project by payment to the North Carolina Ecosystem Enhancement Program (NCEEP) in an amount determined by the NCEEP sufficient to perform 0.20 acre of nonriparian wetland restoration in the Tar-Pamlico River basin (HUC 03020105). Discharge into wetlands on the permitted project shall begin only after the Permittee has made full payment to the NCEEP, and the NCEEP has made written confirmation to the District Engineer, that it has received payment and agrees to accept responsibility for the mitigation work required, pursuant to Paragraph IV.D. of the Memorandum of Understanding between the North Carolina Department of Environment and Natural Resources and the U.S. Army Corps of Engineers, Wilmington District, dated November 4, 1998. If you have not already done so, you should contact Ms. Cyndi Karoly, North Carolina Division of Water Quality, telephone (919) 733-1786, regarding Section 401 Water Quality Certification. This nationwide permit does not relieve you of the responsibility to obtain other required State or local approval. This verification will be valid for two years from the date of this letter unless the nationwide authorization is modified, reissued or revoked. Thank you for your time and cooperation. Questions or comments may be addressed to Mr. Wescott, Washington Regulatory Field Office, telephone (252) 975-1616, extension 25. Action ID Number:200511674 County:Hvde Permittee: Delores FearinE Date Permit Issued: 7/29/2005 Project Manager: William Wescott Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT WASHINGTONREGULATORY FIELD OFFICE Post Office Box 1000 Washington, North Carolina 27889 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date • w CESAW-RG-W DATE: 07/29/2005 MEMORANDUM FOR RECORD SUBJECT: Consideration of Compensatory Mitigation and Potential Impacts to Endangered Species, Cultural Resources and Essential Fish Habitat. 1. Action ID. 200511674 2. Project Name and Location: Delores Fearine--Ocracoke 3. Mitigation [Section 404(b)(1) Guidelines]. a. Has applicant avoided and minimized impacts to the maximum practicable extent? YES If NO, Explain: b. Is compensatory mitigation necessary? YES Explain: in-lieu payment to NCEEP at a 2:1 restoration ratio 4. Endangered Species (Section 7 of the ESA). a. Will any threatened or endangered species or their critical habitats be affected by this project? NO If YES, describe steps taken to address concerns: 5. Cultural Resources (Section 106 of the NHPA). a. Will any Cultural Resources be impacted by this project? NO b. If YES, describe steps taken to address concerns: 6. Essential Fish Habitat (50 CFR Part 600, Magnuson-Stevens Act). a. Is this a project that "may adversely affect essential fish habitat"? NO b. If YES, describe steps taken to address concerns: Corps Regulatory Official: ?+ ?alp \ 7 4 y ' 't # T RA l7IyS.'AD' of' l D I?IOlt' t?F 71VI; PI AL / . Applicant: Delores Fearing File Number: 2005 1 1 674 Date: 7/29/2005 At tached is:Nationwide Permit See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A permission) PROFFERED PERMIT Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - TFe following identifies your rights and options regarding an administrative appeal of the above .v or decision. Additional informationmay be found at http`/hVWW.usace.army.mil/inet/functions/ew/ceeNvo/rc , Corps re ug latio s at 33 CFR Part 3 ;1. V A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, includnzg its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR'APPLAL or OBJECTIONS TO AN INITIAL PROFFERED PF,RMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. ,POIrfiT OF CONTACT :FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: US Army Corps of Engineers Mr. Michael F. Bell, Administrative Appeal Review Officer Attn: William Wescott CESAD-ET-CO-R Post Office Box 1000 U.S. Army Corps of Engineers, South Atlantic Division Washington, North Carolina 27889 60 Forsyth Street, Room 9M15 252-975-1616 Atlanta, Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. DIVISION ENGINEER: Commander U.S. Army Engineer Division, South Atlantic 60 Forsyth Street, Room 9M15 Atlanta, Georgia 30303-3490