Loading...
HomeMy WebLinkAbout20140762 Ver 1_14_0762v2_Mult Sites Inspection_20160819Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915C) County: Watauga Location: NCDOT- US 221 (R-2915C) Latitude: +35° 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 8�8�2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 2 Status: Received Project Type: Road/Highway Widening Region: Central Title: ❑ Not Compliant Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 All sites visited were in compliance. Bore and jack installation at several sites will be needed to maintain traffic. A permit modification will be required. A list of sites is forthcoming. Section D will be reviewed at a later date. page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 8/8/2016 Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: We reviewed several sites alonq this proiect within the A and B Sections as part of the ioint requlatorv compliance review. Sites 2, 3, 10, 11, and 20 on the A Section and 1A, !B, and 10 of Section B were reviewed. It was too wet to review Section D. It was scheduled for later in the fall. One noteable issue was that DOT needed to use the bore and iack method of culvert construction at several sites. Site 10 was one under active installation. DOT will provide a list of sites where bore and iack will be necessarv so that a formal permit modification can be submitted. Recent storm events flooded manv work areas, and sediment was in the process of beinq removed from several locations and EC measures were under repair. page: 2