HomeMy WebLinkAbout20072022 Ver 2_Staff Comments_2008031307-2022 Sierra
AML comments
March 13, 2008
Please provide a BMP Supplement Sheet for each proposed best management _
practice that will be used on the site (including both worksheets, Design Summary
and Required Items Checklist), as well as all of the required items. The BMP
Supplement Forms are available on the DWQ web site at:
http://h2o.enr.state.nc.us/su/bmp forms.htm.
07-2022 Sierra
Subject: 07-2022 Sierra
From: Annette Lucas <Annette.Lucas@NCMail.net>
Date: Thu, 13 Mar 2008 14:16:09 -0400
To: Ian McMillan <Ian.McMillan@ncmail.net>, Annette Lucas <Annette.Lucas@NCMail.net>
Ian,
Please send them another on hold letter with this bullet so we can have the clock
ticking on the SMP as well.
Thanks,
Annette
1 of 1 3/13/2008 2:16 PM
Re: 07-2022 Sierra Residential SD in Durham
Subject: Re: 07-2022 Sierra Residential SD in Durham
From: Annette Lucas <Annette.Lucas@NCMail.net>
Date: Thu, 13 Mar 2008 14:20:49 -0400
To: john.schrum@horvathassociates.com
CC: Ian McMillan <Ian.McMillan@ncmail.net>, Annette Lucas <Annette.Lucas@NCMail.net>
John,
Tomorrow Ian is going to send out a second on hold letter for this project that will
request all the information for the Stormwater Management Plan. This will give you
30 more days to provide us with the BMP Supplement Forms and Required Items for this
project.
Annette
John Schrum, PE - Horvath Associates, PA wrote:
Annette,
How about January 17th at 11 am?
I'll go ahead and put it on my calendar and just let me know if that works
for you.
Thanks,
John
-----Original Message-----
From: Annette Lucas [mailto:Annette.Lucas@NCMail.net] Sent: Monday, January 07,
2008 10:20 AM
To: john.schrum@horvathassociates.com
Cc: Ian McMillan
Subject: Re: 07-2022 Sierra Residential SD in Durham
John,
Ian and I are available on the 16th and 17th from 9:00 until 2:00. Let us know
which date/time works for you.
Annette
John Schrum, PE - Horvath Associates, PA wrote:
Annette,
Thanks for the email.
I have discussed our conversation with the Project Manager and we plan to
proceed as you and I discussed today. I will continue working on the
design
of each discharge point to ensure it satisfies your requirements.
Can we go ahead and set up a meeting for the week after next? I am
available any time except for Tuesday morning.
Talk to you soon.
John
-----Original Message-----
From: Annette Lucas [mailto:Annette.Lucas@NCMail.net] Sent: Friday, January 04,
2008 2:34 PM
1 of 2 3/13/2008 2:21 PM
Re: 07-2022 Sierra Residential SD in Durham
To: John Schrum, PE - Horvath Associates, PA
Cc: Lia Myott; Joseph Gyamfi; Cyndi Karoly; Ian McMillan; Amy Chapman
Subject: 07-2022 Sierra Residential SD in Durham
John,
As we discussed on the phone earlier, a number of staff members from the DWQ
401 Unit met today to determine the best course of action for Sierra
Subdivision. Due to the complicated nature of this project, we as a staff
decided that it is not an appropriate candidate for the Express Review
Program. We are transferring the project to the regular program - however, we
are going to try our best to provide prompt service.
Ian and I will be generating a Request for More Information letter next week
for the project. One item we will include in the letter is a request to see
designs for all of the diffuse flow measures for the entire project. One of
the main reasons for this is that we saw many areas in which the riparian
buffers appeared too steep for level spreaders. If appropriate level spreader
sites are not available on the site, then a BMP that removes 30 percent of
total nitrogen will need to be provided in its place. We want to be certain
that enough space has been allocated on the site in order to allow for this
when needed.
Have a good weekend and we'll be in touch.
Annette
2 of 2 3/13/2008 2:21 PM