HomeMy WebLinkAbout20160177 Ver 2_Riparian Buffer Authorization_20160809SEPI E N G IN E E R ING & C O N S T R U C T I O N LETTER OF TRANSMITTAL 1025 WADE AVE RALEIGH, NC 27605 TEL 919.789.9977 FAX 919.789.9591 Date: August 9, 2016 Sent via: Hand delivery To: NC Division of Water Resources Attn: Ms. Karen Higgins 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 SEPI Project: SC15.010.00 Phase/ 900/001 Task #: Subject: Bldg 110 NZE North Warehouse and Distribution Center PJD CC: Note: AUG 092016 Received by: Date: Celebrating 15 Years SEPI ENGINEERING IL C O N S T R U C T I O N August 9, 2016 NC Division of Water Resources Attn: Ms. Karen Higgins 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 Re: Bldg 110 NZE North Warehouse and Distribution Center; Buffer Authorization Permit Modification SEPI Project: SC15.10.00 Dear Ms. Higgins, On behalf of the US Department of Health and Human Services (DHHS) National Institute of Environmental Health Sciences (NIEHS) National Institutes of Health (NIH), SEPI Engineering (SEPI) submits this Buffer Authorization permit modification and supplemental information requesting written concurrence from the NC Division of Water Resources (DWR) that the activities proposed below may proceed under the Riparian Buffer Rules for Jordan Lake. Provided below is a brief discussion of the project intended to supplement the attached Riparian Buffer Authorization Form. Project Summary and Purpose DHHS intends to construct a warehouse and distribution Center at 111 T.W. Alexander Drive in Research Triangle Park, NC. The warehouse will be located at in the northern section of the property which is bordered by TW Alexander to the west, The Triangle Expressway to the east, and the abandoned Durham Freeway to the north. The subject property is located in Research Triangle Park, North Carolina. The proposed project also includes a loading dock area, an access control point with a guardhouse, associated parking, stormwater control devices, and a utility corridor. The project site was previously used by NIH and contained several temporary structures (trailers) which are no longer on the site. The trailers were accessed by a paved driveway and a concrete parking area which are still in place. The proposed facility will be placed on and adjacent to the existing impervious footprint. Proiect History A 401 & Buffer Compliance permit was issued on March 7, 2016 (DWR #16-0177) for 90 linear feet (LF) of temporary stream impact, 5,390 square feet (sf) of permanent zone 1 buffer impacts ,and 1,202 sf of permanent zone 2 buffer impacts for a utility crossing. Mitigation was not required as impacts were either temporary in nature or exempt or allowable according to the table of uses. A 404 permit for 90 LF of temporary stream impacts was submitted to the US Army Corps of Engineers (USACE) on February 24, 2016. As of the date of this letter, no approved permit has been received. 1025 Wade Avenue I Raleigh, NC 127605 1 Phone: 919.789.9977 1 Fax: 919.789.9591 sepiengineering.com I @SEPlengineers SEPI A design change was requested in the location of the proposed utility corridor. Instead of connecting to an existing corridor along T.W. Alexander Dr., the proposed utility corridor will follow an existing sewerline corridor south of the main parcel. Previously permitted impacts were not constructed and are no longer proposed in this new utility corridor alignment. Project Impacts and Mitigation The project construction requires temporary impacts to state regulated riparian buffers (Zone 2 only). The proposed utility corridor will contain multiple utilities and will be placed within and immediately adjacent to an existing utility corridor in an effort to minimize impacts to the buffers. No stream impacts are proposed in the new utility corridor, and the previously permitted stream impacts are no longer being proposed. No riparian buffer mitigation is proposed since all buffer impacts are considered "allowable" within the table of uses and the impacts will occur in an existing sewerline easement with maintained herbaceous cover. PROJECT SUMMARY Project Name Bldg 110 NZE North Warehouse and Distribution Center Project Type Industrial Owner / Applicant National Institutes of Health County Durham Nearest Town Research Triangle Park Waterbody Name Burdens Creek & UT to Burdens Creek Index Number 16-41-1-17-1-(0.3) Class WS -V; NSW USGS Cataloging Unit 03030002 IMPACT SUMMARY Total Stream Impact linear feet): 0 Stream Impact (acres): 0 Wetland Impact (acres): 0 Oen Water Impact (acres): 0 Total Impact to Waters of the U.S. acres 0 Riparian Buffer Zone 1 Impacts 0 Riparian Buffer Zone 2 Impacts 1,292 square feet (temporary) Avoidance and Minimization Multiple utilities are being placed within the proposed corridor along an existing sanitary sewer corridor to reduce impacts to riparian buffers and stream crossings. Trenchless installation will be implemented to eliminate impacts to streams and reduce impacts to riparian buffers. The utility corridor will be 10 feet wide or less throughout the project. The previously permitted corridor temporarily impacted 90 LF of stream. Wetland areas on the property are being completely avoided with impacts. No permanent impacts to streams or wetlands are proposed. 2 SEPI If you have any questions, please call me at (919) 747-5834. Sincerely, SEPI Engineering & Construction ��orn2G� Kim Hamlin Environmental Project Scientist Attachments: Riparian Buffer Authorization Form Agent Authorization Form USGS Topographic Quad Map Durham County Soil Survey Map Overall Impact Map/Impact Map Details Buffer Determination Letter (JBRRO #16-241) Section 401 and Riparian Buffer Approval (DWR # 16-0177) Durham County Stormwater Plan Approval (#SW -1601) State of North Carolina PRN��r� Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form I A. Applicant Information (du 1. Project Information 1a. Name of project: Bldg 110 NZE North Warehouse and Distribution 1 b. County: Durham 1c. Nearest municipality: Research Triangle Park 1d. Subdivision name: N/A 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. El Yes No ® 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: US Government - Army Corps of Engineers 2b. Deed Book and Page No. DB: 336 DP: 300 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): PB: 57 PP 92 2d. Responsible Party (for Corporations): James Victor Stancil III, P.E. c/o US Government - Department of Health and Human Services 2e. Street address: 111 T.W. Alexander Drive 2f. City, state, zip: Research Triangle Park, NC 27709 2g. Telephone no.: 919-541-2597 2h. Fax no.: 2i. Email address: james.stancil@nih.gov 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address 4. Agent/Consultant Information (if applicable) D -WAT 4a. Name: Kim Hamlin FFER PER ITTtNG SEPI Engineering & Construction 4b. Business name (if applicable): 4c. Street address: 1025 Wade Ave 4d. City, state, zip: Raleigh, NC 27605 4e. Telephone no.: 919-747-5834 4f. Fax no.: 919-789-9591 4g. Email address: khamlin@sepiengineering.com FORM: BA 10-2013 Page 1 of 6 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID). 178490 1 b. Site coordinates (in decimal degrees): Latitude: 35.8929 Longitude: - 78.6184 1c. Property size: 40.7 acres 2. Surface'Waters 2a. Name of nearest body of water to proposed project: Burden's Creek 2b. Water Quality Classification of nearest receiving water: WS -V; NSW 2c. River basin: Cape Fear River Basin (HUC 0303002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is partially forested, vacant land with the exception of an approximate 4 acre cleared area in the center which in the past contained research trailers and associated parking but is now vacant. The general topography of the site is mildly steep, with elevations ranging from approximately 300' to 260' above mean sea level. Burdens Creek borders the southern property boundary of the main parcel and flows from east to west. An unnamed tributary to Burdens Creek flows south to north adjacent to an existing sewerline corridor. There are several wetlands in the floodplain on the north side of Burden's Creek in the main parcel. Land use in the vicinity of the project consists of industrial and commercial development. 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1.050 linear feet 3e. Explain the purpose of the proposed project: The purpose of the project is to construct a redevelopment net zero energy warehouse and distribution center. 3f. Describe the overall project in detail, including the type of equipment to be used: The Construction of the warehouse facility and associated utilities will require the use of heavy machinery typically used for grading and site construction. Trenchless installation of utility conduit will be used to eliminate or reduce impacts to streams and riparian buffers. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: A delineation was completed by project (including all prior phases) in the past? Mulkey Engineering and approved by the - - - - USACE; however, a copy of the JD map or �, ' , r' ` , '`'•' ; i i,i�, , Action ID # was not provided to SEPI. SEPI i+ delineated/submitted PJD request of main parcel in February 2016. SEPI delineated the '? z •• ja 1' , new proposed utility corridor in June 2016. 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: Name (if know): =;' -^+;. +r' Other: 4c. If yes, list=the'•dates'of:iRi -Corps jurisdictional determinations or State determinations and attach documentation. Section 401 permit/buffer authorization was issued March 7, 2016 (DWR # 16-0177) for previously proposed impacts to streams and riparian buffers. FORM: BA 10-2013 Page 2 of 6 B. Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for this ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. Section 401 permit/buffer authorization was issued March 7, 2016 (DWR # 16-0177) for previously proposed - impacts. A section 404 permit application was submitted on February 24, 2016. These impacts were never completed and are no longer proposed. A Durham County Stormwater Plan was approved on March 10, 2016 (Durham Co. Stormwater Project #SW -1601). 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: SSGP3080 8-13 Page 3 of 6 C. Proposed Impacts Inventory 1. Buffer Impacts 1a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ® Jordan ❑ Goose Creek 1b. Individually list all buffer impacts below. If any impacts require mitigation, then you MIUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number— impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ mitigation) required? (sq ft) (sq ft) or Temporary T B1 ❑ P ® T Utility Allowable UT to Burden's ❑ Yes ® No 0 1,292 Creek (Stream 2) B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes [:]No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P [-IT ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 0 1,292 1c. Comments: 1,292 square feet of temporary parallel zone 2 buffer impacts to install conduit for utilities. Construction area will be 10 feet wide or less and occurs within existing maintained sewerline easement with herbaceous cover. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Multiple utilities are being placed within the proposed corridor along an existing sanitary sewer corridor that is regularly maintained to reduce impacts to riparian buffers and streams. Trenchless installation will be implemented to eliminate impacts to streams and reduce impacts to riparian buffers where possible. The utility corridor will be 10 feet wide or less throughout the project. The previously permitted corridor temporarily impacted 90 LF of stream, 5,390 square feet (so of zone 1 buffer, and 1,202 sf of zone 2 buffer. These impacts are no longer proposed. No permanent impacts to streams or riparian buffers are proposed 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment and erosion control measures will be utilized near streams and wetlands to prevent sediment from entering. Installation can occur without requiring the crossing of heavy machinery over the jurisdictional streams. FORM: BA 10-2013 Page 4 of 6 C. Impact Justification and Mitigation, continued 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet s uare feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: Buffer mitigation is not proposed because the parallel zone 2 impacts will occur in the existing sewedine easement which is regularly maintained as herbaceous cover. FORM: SSGP3080 8-13 Page 5 of 6 E. Diffuse Flow Plan All buffer impacts and high ground Impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. maintained. 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. ❑ Yes ® No F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of ® Yes ❑ No public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Kim Hamlin 07/21/2016 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided ) Send this completed form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service. NC DWR, Transportation Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 - 1650 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 - 1650 For government transportation projects sent by delivery service (UPS, FedEx, etc): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 6 of 6 Celebrating 15 Years SEPI ENGINEERING 6 co N S T RU C T I O N AGENT AUTHORIZATION FORM All Blanks to Be Filled in By the Current Landowner or Municipal Official Name: US Government — Department of Health and Human Services Address: USACE - 11405 Falls of the Neuse Rd., Wake Forest, NC 27587 NIH - l 11 T.W. Alexander Drive, Research Triangle Park, NC 27709 Phone: 919-541-2597 Project Name/Description: Bldg 110 NZE North Warehouse and Distribution Cntr SEPI Project # SC15.010.00 Date: NC Department of Environmental Quality NC Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Attn: Karen Higgins Re: Riparian Buffer Related Consulting and Permitting To Whom It May Concern: I, the current landowner or municipal official, hereby designate and authorize SEPI Engineering & Construction, Inc. to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc. from this day forward. This notification supersedes any previous correspondence concerning the agent for this project. Notice: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by SEPI staff. You should call SEPI to arrange a prior to visiting the site. BY: U''r S u BY: Print Name of Landowner or Sign re of Landowner or Municipal Municipal Official's Name Official 1025 Wade Avenue I Raleigh, NC 127605 1 Phone: 919. 789.9977 1 Fax: 919. 789.9591 sepiengineering.com I @SEPlengineers U E IN 54 1 ,� o�g �0 147 o D OR, � f / A4 _ V rIHROW LHS o� Burd -e -f" C) Burd � r^ Drainage 1 of z Drainage 2 z 300 a 147 t\J "1 40 oO Legend t` z Q Proposed Utility Corridor Study Area �+ Previously Delineated Study Area Map Location USGS Map Figure 1 Building 110 Net Zero Energy North Warehouse and Distribution Center N ORANGE DURHAM Durham County, NC SEPI Project # SC15.010.00 40 USGS Topography, 2013 Southeast and Southwest Durham NC Quads P I CHATHAM WAKE July 14, 2016 E N G I N E E R I N G & 0 1,000 2,000 CONSTRUCTION off— i Feet I Map Created by: KMH ✓— a 1 S �� J �7 j] ' "� LLJ UJ ILL C C" , 4- f 00 Pf E t A 'Vs E 'WscPf Gu Ch 1I 1 j' tl Drainage 1 `�� Wsc Drainage 3 r Drainage 2 wti .1 F' Drainage 5 � S� "`�' - `•,1 WS E3 C Legend Proposed Utility Corridor Study Area Drainage 4 Previously Delineated Study Area a" - Map Location Soil Map Figure 2 Building 110 Net Zero Energy North Warehouse and Distribution Center N ORANGE DURHAM Durham County, NC SEPI Project # SC15.010.00 ® Durham County Soil Survey Soil Sheet #35 & #36 E N G I N E E R I N G & CHATHAM WAKE July 14, 2016 C 0 N S T R U C T 1 0 N 0 500 1,000 Feet I Map Created by: KMH N n m p v-0 G7 G7 m m N z C? rn r Z 0 0 � m z = o cn 0 z X C M C D OX X �p m C m K R , 0 O D w C uN m 0 cn m N Cl O 0 0 fig111ij I �n�l'I" Q Z z� O D mIM n Qo co �sz cn Z fill / C) m cn IM M m �CY %/, /ii/'�� = � ,,\ � �` /� \ L1! l i /� Ole• �\lJ„ %.� *�~ \ \1 \ cn IX z cn \.. Z _ \ r >�- Z � A� 1 1(i I,, J \ m Dcn 1 �A � 1 I �' l✓ .7// /\. II-lLOJllli. J - v\VAVV�•�� olll�•lil Co n mO v m� z� z� m 22 N cii a, O z U) 1 0 z C Z <M C)_ o to o M C/)0 D_ m C D U) Km 1 ^ �a `! .I —.-a. D w 0 N Water Resources ENVIRONMENTAL QUALITY July 29, 2016 US Department of Health and Human Services Attn: James Victor Stancil 111 T.W. Alexander Dr. Research Triangle Park, NC 27709 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director Subject: Buffer Determination Letter JBRRO #16-241 Durham County Determination Type: Buffer Intermittent/Perennial ❑ Neuse (15A NCAC 26 .0233) Start@ E] Tar -Pamlico (15A NCAC 213.0259) ®IntermittenUPerennial Determination (where local buffer USGS ordinances apply) ® Jordan (15A NCAC 2B.0267) (governmental and/or intedurisdictional projects) Surve Project Name: Address/Location: Stream(s): NIEHS Warehouse 109 T.W. Alexander Dr.; Morrisville Burden's Creek Determination Date: July 28, 2016 Staff: Cherri Smith Stream E/I/P* Not Subject Subject Start@ Stop@ Soil USGS Surve To o I P X— throughout X X project area 2 P X— throughout X X project area 3 E X — within X project area 4 X — not X resent 5 X — not X resent 6 X — not on maps •E11/P = EphemeraUlntermittent/Perennia! Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://ponal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 7914200 Location: 3800 Barrett Drive, Raleigh. NC 27609 Fax: (919) 788-7159 NIEHS Warehouse Durham County July 29, 2016 Page 2 of 2 Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire rive (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit; 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury Street, Raleigh, NC 27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this dete ation, please feel free to contact Cherri Smith at (919) 7914251. S' cerel , Danny Smith Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Kim Hamlin; SEPI Engineering; 1025 Wade Ave.; Raleigh, NC 27605 S3t-i2c� -�--I(�-;q wSQ r r,�. ` p k VS. n f wsc Y� Gu Ch CJ r � `wSc tI� Drainage 1 /- � Y s L r Y%0. 7$ WO' Drainage 3 % Drainage 2 hfl� S Drainage 5 " WS Sc Legend W Proposed Utility Corridor Study Area r Drainage 4 not Previously Delineated Study Area ' IkMap Location Soil Map Figure 2 Building 110 Net Zero Energy North Warehouse and Distribution Center N ORANGE DURHAM Durham County, NC SEPI Project # SC15.010.00 Durham County Soil Survey Soil Sheet #35 & #36 i E N G I N E E R I N G & CHATHAM WAKE July 14, 2016 C O N S T R U C T I O N 0 500 1,000 Feet Map Created by: KMH --3-13 mo #:- 1('0 ,J _ i 1 % � 300 1 Q I 54 147 n -I ff#M Burde' Burd Drainage "ova L#-, Drainage 2 :> �e J, ct 4�1 01 147 CQ Legend Proposed Utility Corridor Study Area Previously Delineated Study Area -300, -,Map Location USGS Map Figure 1 Building 110 Net Zero Energy North Warehouse and Distribution Center N ORANGE DURHAM Durham County, NC SEPI Project # SC 15.010.00 0 USGS Topography, 2013 Southeast and Southwest Durham NC Quads ENGINEERING & CHATHAM WAKE July 14, 2016 CONSTRUCTION 0 1,000 2,000 = Feet Ma Created by: KMH 11WO • • Engineering and I� • Environmental Services March 10, 2016 United States of America Attn: USACE 11405 Falls of the Neuse Rd Wake Forest, NC 27587 Re: Stormwater Collection Systems Plan Approval Building 110 Net Zero Energy North Warehouse and Distribution Center Durham County Stormwater Project #SW -1601 Dear Sir: On February 8, 2016, we received a stormwater construction drawing package submittal package for the Building 110 Net Zero Energy North Warehouse and Distribution Center project located at 105 T.W. Alexander Drive, Durham, NC. This construction drawing set was approved by this office on March 8, 2016. Enclosed is a copy of the plans and calculations, stamped approved by this office. The approved stormwater collection system consists of: 1. Installation of a bioretention facility with a design treatment volume of 954 ft3. 2. Installation of a stormwater wetland with a design storm surface area of 14,931 ft3. 3. Approximately 979 LF of PVC and RCP pipe Our office will issue a Stormwater Operation and Maintenance Permit for the stormwater control measures after the following are completed: 1. The stormwater system is constructed and final construction inspected by a registered professional engineer, a registered land surveyor, or a registered landscape architect. A signed and sealed copy of the inspection report must be submitted to this office. 2. The final As -Built Plans sealed and signed by a registered professional engineer, a registered land surveyor, or a registered landscape architect must be submitted. 3. An operation and maintenance plan sealed and signed by a registered professional engineer, a registered land surveyor, or a registered landscape architect must be submitted. 4. An operation and maintenance agreement signed and notarized by the property owner. This will be drafted near the end of the project. 5. An improvement security must be provided to our office in accordance with Ordinance Section 14-155(e). Our calculations indicate a performance bond in the amount of $11,359.95 is necessary to ensure construction, and continuing operation, maintenance and inspection of the facilities. Performance bond forms and information can be found on the Durham County Engineering / S&E Webpage. If you believe this bond amount is incorrect please contact me. See Attached. 120 East Parrish Street, Law Building, 1° Floor, Durham, Nortti Carolina 27701 (919) 560.0735 1 Fax (919) 560-0740 1 dconc gov Equal Employment/Affirmative Action Employer Please feel free to contact me if you have any questions pertaining to this approval at (919) 560-7992. Sincerely, VnD. ves Stormwater Manager cc: Justin Beard, PE SEPI Engineering 120 East Parrish Street, Law Budding, to Floor, Durham, North Carolina 27701 (919) 560-0735 1 Fax (919) 560-0740 1 dconc gov Equal Employment/Affirmative Action Employer 120 East Parrish Street, Law Budding, 1" Floor, Durham, North Carolina 27701 (919) 560-0735 1 Fax(919)560-0740 1 dconc gov Equal Employment/Affirmative Action Employer BMP Performance Bond Calculations BMP: Wet Detention Pond Performance Bond Calculations Project Name: The Lab Building 1 Facility Name Bio -Retention 1 Wetland 1 Facility Drainage Area (AC) 1.73 Facility Drainage Area (AC) Facility Volume (CF) 954 Capital Costs' ($) $ 2,253.49 $ - $ - O&M Costs 2 ($) $ 90.14 $ - $ - Inspection Costs 3 ($) $ 500.00 $ - Is - Total ($) $ 2,843 63 $ - Is Total Bond Date Notes- 1) Capital Costs = 18 5Volumeo 70 $ 2,843.63 2) O&M Costs = 4% Capital Costs 311112016 9:34 3) Inspection Costs = By Durham County Source: NCDENR Stormwater BMP Manual - $ - Is - $ - 120 East Parrish Street, Law Budding, 1" Floor, Durham, North Carolina 27701 (919) 560-0735 1 Fax(919)560-0740 1 dconc gov Equal Employment/Affirmative Action Employer BMP Performance Bond Calculations BMP: Wetland Pond Performance Bond Calculations Project Name: Facility Name Wetland 1 Facility Drainage Area (AC) 4 Facility Volume (CF) 34,161 Capital Costs' ($) $ 7,634.59 $ $ $ - $ - $ - 08M Costs 2 ($) $ 381.73 $ $ - $ - $ - $ - Inspection Costs 3 ($) $ 500.00 $ - $ - Is - $ - $ - Total ($) $ 8,516321$ is I $ - Is Is Total Bond Date $ 8,516.32 311112016 9:34 Notes: 1) Capital Costs = 3,852' Watershed Area0484 2) O&M Costs = 5% Capital Costs 3) Inspection Costs = By Durham County Source: NCDENR Stormwater BMP Manual 120 East Parrish Street, Law Budding, 1" Floor, Durham, North Carolina 27701 (919) 560-0735 1 Fax(919)560-0740 1 dconc gov Equal Employment/Affirmative Action Employer N A W W N O S O N O O I= ry1N NM rTOO7OO mT T<nzz m 00 A M A Dp,ym� (OA fO/-1 y Rl Z D0 0 i p z D z 11 D 00 m O' A Z 2 O m m MM p�ovm0 00 imi C1 �— -Tis G�iG�i M-012 IMM 2'0 � g IR N Z 00 _ Z 9 0 I r DD 0 m in ?? �, _ Z0 DD Nm =Z== _____ __ _ 0000 00000 00 0 ____=zzzz zz z 0000 00000 00 0 CE C Ccc CCC C 0000 00000 00 O TmTT TTTTT mm m 000v ovvov vv o z z z z z z z z z z z z V) (A N V) N V! N (A N fA F. 0 mNm mNm to mV) N N N cn q(A(A N V) z (Jl � B 777 T mb o 0 : 4 ] 3 A } : 7 ! p $p d7b .�°�9b� �tRli.bb gg77 T s yo\ouuwulllulya °Oc ¢� Az o �e •. ca. CD 0x a COVER SHEET 7 � - _ e M MM z 9 v oo Ln m {} t cz 4 (e 0 r0 1 7 �/llllllllnil„\\\\\\gip m i• v 4 z 0'Z �n Irn'Z �0 Z M CA ca m� + VI I`/ '0 ir=m I=i D Fn �cn,5 (Jl � B 777 T mb o BUILDING 110 NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER : 4 ] 3 A } : 7 ! p $p d7b .�°�9b� �tRli.bb gg77 yi„`-a s yo\ouuwulllulya °Oc ¢� Az o �e •. ca. CD a COVER SHEET 7 � - _ e 3yry 9 v oo m N O I ] 7 �/llllllllnil„\\\\\\gip m i• v 4 O Z m OCO CO d 3YYB948Y'�Y4 $g Sri Y 111,H �� Y&= a�ill 1 LL O aso IIa3c siSaa aE 3§g� 1111,ill dy�•� YE88y�uo e LL H IrII I �� �" C7 I I I I I botz•g99®jt9*0 O •:�a gils4a9'_--? cc € 5 y 99 $$ g Z JI I I I 3i�Ns I I 15'X1 iAq¢F 64 iV 2 �g g$ �� 4,4 1 Q Q aHw n s_$$yy j Nk ow All e 17 OP r \ `\ m \ C-) o ARP if ee \\ `, '`` •"�` 99 e - ` - - ly 'ham ,1 \ _ o / 1 \ / �S O i a _ __ ♦ 9 \ "V P 8 a S� O \Op Ng � 1• � � � ' - __ - - � rag ��3 /` .� ` 1 - 1` } X �1�11I1 1 _ -•,/ F9 ^ \fS p �vl-_ = \ •€ l ! i '@ v i '1. \ , `l11`�' \ II 3a1 1\`/ \ 1'1`;'X,1 lr \ GJi�' / \♦ - - % �__ _V+ /fir' ' '1'14. •� 11 - - � ` � - J \ _.� /, ' ., - - ", - - _- � �o_ - -. _�- II 1 I il' r,,i 1 \ .. " ` w � •�,Q � I i � _ _-'�z`si -- � S.0 ��Q I �.�' Sa� � � . 1 ,A Ilv11,111'1 '�I' � � ,I � � �� /� /-Y= {per' - — — — - — �a3e _ s���„ • � ;n°"-�.A �� N \ ZRI 4 \ � •\ x ._s.`'__=�,_ •'- - Ott - _� _-=�-' �"ice-�+f�� _._-__. -_�-r �\��r�-`-�ri W � �-T1 t 111 fllll� 1}II� I q}1,'\11 I' t �_—_ _ __�= IR_ —IA-' "� �4 - _ _ - _ - - __ -- M -M -_.` �`_hc„� --"►'• _ �.o _ --4 III 111 �rI�•�141 '1 4 1 � q-- mar__ —__ --_"'_ _ � — _- _ ___ -_ - --"a— - M M�\� M _y _'_"� -♦�,_ ; 11 l�\ ' `t+ ♦� -- ---_=--_-= ---_ � _-_ _- � __-- -- =- --- --� �'"--- � -- = � _ - _ �9ses-,=1_ - li o �o� _ �_ � �~��� 3AIa0a30NYX37YM1 -3-a' �//ice \\ \ \ \\\.\♦�`♦\ _ -__--ill\�1 ' ^sf I N,La e �:. �\\\\IIIIrrIlllrlN =`R . �r „ „,11111\11111\\\•,,, S t t �� 1: . � , � E Y; Q �1 Q SoN, o B I e r o a r M t S ITp m3m30NOI1n81H1S1C1 3SnOH3aVM HIHON A'AMN3 OH3Z 13N ou �N1a11ne I q is F W 8 r O Z m OCO CO d 3YYB948Y'�Y4 $g Sri Y 111,H �� Y&= a�ill 1 LL O aso IIa3c siSaa aE 3§g� 1111,ill dy�•� YE88y�uo e LL H IrII I �� �" C7 I I I I I botz•g99®jt9*0 O •:�a gils4a9'_--? cc € 5 y 99 $$ g Z JI I I I 3i�Ns I I 15'X1 iAq¢F 64 iV 2 �g g$ �� 4,4 1 Q Q aHw n s_$$yy j Nk ow All e 17 OP r \ `\ m \ C-) o ARP if ee \\ `, '`` •"�` 99 e - ` - - ly 'ham ,1 \ _ o / 1 \ / �S O i a _ __ ♦ 9 \ "V P 8 a S� O \Op Ng � 1• � � � ' - __ - - � rag ��3 /` .� ` 1 - 1` } X �1�11I1 1 _ -•,/ F9 ^ \fS p �vl-_ = \ •€ l ! i '@ v i '1. \ , `l11`�' \ II 3a1 1\`/ \ 1'1`;'X,1 lr \ GJi�' / \♦ - - % �__ _V+ /fir' ' '1'14. •� 11 - - � ` � - J \ _.� /, ' ., - - ", - - _- � �o_ - -. _�- II 1 I il' r,,i 1 \ .. " ` w � •�,Q � I i � _ _-'�z`si -- � S.0 ��Q I �.�' Sa� � � . 1 ,A Ilv11,111'1 '�I' � � ,I � � �� /� /-Y= {per' - — — — - — �a3e _ s���„ • � ;n°"-�.A �� N \ ZRI 4 \ � •\ x ._s.`'__=�,_ •'- - Ott - _� _-=�-' �"ice-�+f�� _._-__. -_�-r �\��r�-`-�ri W � �-T1 t 111 fllll� 1}II� I q}1,'\11 I' t �_—_ _ __�= IR_ —IA-' "� �4 - _ _ - _ - - __ -- M -M -_.` �`_hc„� --"►'• _ �.o _ --4 III 111 �rI�•�141 '1 4 1 � q-- mar__ —__ --_"'_ _ � — _- _ ___ -_ - --"a— - M M�\� M _y _'_"� -♦�,_ ; 11 l�\ ' `t+ ♦� -- ---_=--_-= ---_ � _-_ _- � __-- -- =- --- --� �'"--- � -- = � _ - _ �9ses-,=1_ - li o �o� _ �_ � �~��� 3AIa0a30NYX37YM1 -3-a' �//ice \\ \ \ \\\.\♦�`♦\ _ -__--ill\�1 ' ^sf I _ — �"- , TW bLEXANDER DRIVE 28 Fr yr=w ' 1 '= fs — 1 1 �, • I I r Y—— =� _—_ 1- s S— S�� —1' I I s q 1� L i fi K � La 4 bi v Isis mg wt ` / Hyl �� � �' \ � (/�^ � �•,` `fi � I, �_ � � �� � ` _��__t�'—c�.�"��� —1 _ i5 9< \ t W — \ \� \ ra az mm O F=50 ym 010 m F, N z m O mz A r 2 m ,a A z n npn, m A m jox m m m co 1� _ BUILDING 110 "`n" i I NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER g �' S 11000 �, r - �O m i " nne l EROSION CONTROL PLAN • PMSE I " ' '4•, moi+'` " Q o� t D y A D h�nuwwm,no"a icy a• n m 0� z OT ;u.Z1 0 o M J _)0 XO s C � -< z � az mm O F=50 ym 010 m F, N z m O mz A r 2 m ,a A z n npn, m A m jox m m m co o -a CJl 1 Qc • ° �r o BUILDING 110 "`n" i I NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER g �' S 11000 �, - m i " nne l EROSION CONTROL PLAN • PMSE I " ' '4•, moi+'` " Q o� h�nuwwm,no"a icy a• lie I'6 J isI€Itbi a � _ tR na lR�a1 g g g a 55 ea ang 556 a a 5 g 5 m L� o -a CJl 1 Qc • ° �r o BUILDING 110 "`n" i I NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER g �' S 11000 �, - m i " nne l EROSION CONTROL PLAN • PMSE I " ' '4•, moi+'` " Q o� h�nuwwm,no"a icy a• F W a R art 4 c� yd �' ! $� vW,g6�` Z 3StlFld • M/1d lOL1N09 NOISOH3 Iq 2 9 �f f CD N j Uul A ZJ31N33NOLLnGUI-SI0ONV G 7� qp • 3snOH3HVM HILTON AMON: 0a3Z 13N Oft ONI011f16 F y# ill � $ II � 7��l� � F W a R gad 4 c� yd �' ! $� vW,g6�` O 1111111 K ^ i7 ��u 33555 g C N5 e Uul A F W a R a � yRyet — — P�Y l\ _ a \ \ /%01� I � r y a \ I • z LU W L U Z 0 Z LU I.- co ul W o Q W co LLI U N Z M O d O F. � W W O IX Z OZ a LLJ 0 2 ce �a V �� �� � �I � � - __ �- - _ � - - Imo.- � _ .-• — r_ �_ � - h � � ��. � � ,� , r - ` n 1 l Ill I' =-^�= -� _: =oa--. - - �.co--- A" L+ -Or: •1 � �- - ••� _.� 4 \`h\\S ,µ���l_*I r)�,"1� _-1 1,1 � 11 \ __.•71ll1 �_ - - _-f>;a� — ._ ._ -- - - -� _ _ � _. _ _ M/Y' �-:r_p!• r?,�c T 11 I Z 0 Z 0w wZ � U R 0 O 0 Z ° gad 1111111 1 � q A G 7� qp � � $ ill � II � 7��l� � y C 91 ��11 yypp. N RRy $ y pF a � yRyet — — P�Y l\ _ a \ \ /%01� I � r y a \ I • z LU W L U Z 0 Z LU I.- co ul W o Q W co LLI U N Z M O d O F. � W W O IX Z OZ a LLJ 0 2 ce �a V �� �� � �I � � - __ �- - _ � - - Imo.- � _ .-• — r_ �_ � - h � � ��. � � ,� , r - ` n 1 l Ill I' =-^�= -� _: =oa--. - - �.co--- A" L+ -Or: •1 � �- - ••� _.� 4 \`h\\S ,µ���l_*I r)�,"1� _-1 1,1 � 11 \ __.•71ll1 �_ - - _-f>;a� — ._ ._ -- - - -� _ _ � _. _ _ M/Y' �-:r_p!• r?,�c T 11 I Z 0 Z 0w wZ � U R 0 O 0 Z ° RA — s— L ---- T'�^^ DER DRIVE 1�I ° 7��1• �i ' _ ' � =— —�'C3,'Jd7xli�r� tf�— — \ — — —� ~� ._ 11 aT `7147 t/ FT -- ✓B `•yt L_ W — —_N,� l4. — — — — — — — — --- - — _ _—tea — —A �—� — — •— — � � ux J' 1 ^ ,Y \ ' ' f \ ` ~-� \ ,9� \ i` / �-»'� — — _ _' � , � I III i11 \ I 1 1 \ 11 o :1111111111111 jjj�;� 1 c? Ok `TP;� \ 1 \ 55 PE p g n^TnS O 000000000000 n E I ZZ P G 8 eP pp p @ �+ Jp I r s t 7: € " £ G Q E£i $f, 4F_ e A R U, F ; ^' I r`a i J £ red+ 3 -3 oe 4y""kis ^�i S�`¢ a t� 3 m 4r R �m�- a iY! O V Iia' m R gx� c a r� A s x� a x e a l �d r v 7� ` r e: a = n l � s am r S a �x o� u as a s 8 gpp �� mCc.g' < R"^ � � �i ' NM n'ax: � s § � 2ma� g�.,ZaaaZ4aaaaafi€��R7 O fi m 8 a2 p �•On� �� 8�� A� g�� ,. �� '"ar s_ .�� � ��g WIr A In xOgg N' 9 z ® n O a Fr 7s r m g + �= A � � 2g $g � G 4 $ }p gm- n -¢ s Eg arc at Qg 1.19#11 3 i `a (-n 4 p 6 p r a BUILDING 110 ""` I NET ZERO ENERGY NORTH WAREHOUSEAo AND DISTRIBUTION CENTER"4 EaE P i g` I =: w _ S R •: -- ; •' fl b Q x Q x+....1 mx7 OEMOUTION PIAN - 6 e. �r fpx,nunuio„a°R ig m 11 wo • w 0 0l� g�gt, 3 cl WO i Ia rn d a 4 Y6@�� 'Oil � YO a I L $ Cf a 6 w LLP 0 lit W ilm f33 � a J Y G H._oi_ 9 z 99QQ c� �}y' d �� yp�dL S $ lip ?� r I I I sY� Ott } �� 9l t� 5 F Sl $ 8�5 ;�„yq� teaz Bp�t��g a g4 rm gs q1 �Qaa H", H�7 RY W .79}G� EYPQ�a ul f Id O" t y " u SH w� 8 - wLLq R 0 3YY1310A SSYdD 033WANN eOo I I a, I o I.l h0f 3AII10 N3ZN z 0 0 I F- W Z LU jxO 0LL O LL O z wa� • ■ @ . WE•�gsas �M1I11nnI1Nl/b a� b i t 6 I� yy�f 9 C 'iEEg" 8P NYId 3LS TIdtl3A0 N o is i aa . i 99 yP P kY § p Q a 99111'1 g G 9 M31N30NOUMIMSI00Ml 3Sf10H321VM HILTON A'Jtl3N3 OM3Z 13N OIL ONI0108 S i j � ! o 0l� g�gt, 3 cl WO i Ia rn d a 4 Y6@�� 'Oil � YO a I L $ Cf a 6 w LLP 0 lit W ilm f33 � a J Y G H._oi_ 9 z 99QQ c� �}y' d �� yp�dL S $ lip ?� r I I I sY� Ott } �� 9l t� 5 F Sl $ 8�5 ;�„yq� teaz Bp�t��g a g4 rm gs q1 �Qaa H", H�7 RY W .79}G� EYPQ�a ul f Id O" t y " u SH w� 8 - wLLq R 0 3YY1310A SSYdD 033WANN eOo I I a, I o I.l h0f 3AII10 N3ZN z 0 0 I F- W Z LU jxO 0LL O LL O z a n�- ALEXANDER DRIVE ate_ - F-- (1Z FrV \ \`, ` NEM.FCnCFD GR�54 PGE lA.E lei I' F7- ........... ___J lci 2 z O om M;a �� z 1-< G (� A +� BUILDING 110 nne NET ZERO ENERGY NORTH WAREHOUSE AND OISTRIBUTIONCENTER g g A is § �: f l 9 gg gg y,B SER;fi 3bD "� >:�a •INA 3:a S a a=� '} s%E Sri _ g Q - oo oY^��eF�4�'a �'�: �$i,6• s^ �g3 2 i C) 1 i i m ^n 1 GRADING& DRAINAGE PLAN num�oa� /4ee 0 z W W J rw ������yg6�gy6��$$gp�g�gp$ag�66gp�g Ig kg 111,1111 111 plo �.¢ u o �� �„ "o„annuuuny„ /•*s F�iGf ae y Nd Id 9NWYli9039atl IN3 I m o } r r Y Ip iia a31N33 NOLLfle�alsla aNV q� u • , ' Q z M.rnu,nnnoA3` a! 3SnOH3UVMKRIONA°Ja3N30a3z13N lio'io.. OLL'JNIalIf1H t �% r ;glee -d k i /4ee 0 z W W J rw ������yg6�gy6��$$gp�g�gp$ag�66gp�g Ig kg 111,1111 111 plo LOZ' NZ 'cF 68Z ' n 2 g fffa� i fffa���i Z O Ocr H W Z 0 L) cr jr cr OLL LL F- 0 Z a �s b uQ t7� og' SM �LLa� oggo a ' 0 Nc ae 'c O Ip iia 81a�fa 81��v Q z ;glee -d k i 4 s � IMP, m�s� LOZ' NZ 'cF 68Z ' n 2 g fffa� i fffa���i Z O Ocr H W Z 0 L) cr jr cr OLL LL F- 0 Z a �s b uQ t7� og' SM �LLa� oggo a ' 0 0 Z O 0m o< MO Z 5E 0 b� 6 Pii C, m m M 1 1011 z 0 0 0 �O 0 0 3�D Om gya 0 co m z m P 91 M � PO —2175 1 � � Ul (A " q e q m y �P of"c"I Com° @� ,ry,m @y BUILDING 110 NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER f I .•.a•' 4 " ! a�¢Adn�����"y>� lag' ■ y 4Q ..oww,nuiiiii 037° � 4 D B ■ AA R� C ? �C qqq ji ' f •►�;� 61Y1 'ao 4 �a 6y y� CAr /hof `�00 m N w= z b z m P 91 M � PO —2175 1 � � Ul (A " q e q m y �P of"c"I Com° @� ,ry,m @y BUILDING 110 NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER f I .•.a•' 4 " ! a�¢Adn�����"y>� lag' ■ y 4Q ..oww,nuiiiii 037° � 4 D B ■ Cil 0 iiii STORMWATER PLAN -WETLAND ' 9%'P •►�;� V oo y� 1OW IZ�Z) -'Y C' K w 1 LU W_.C`Lu g I zR wz LBz� w Sez—� ,l� K�� r'- = MH1 +emnn'mnnyrr 96 5 NO LLN313tl01R•NV1dtl31tlMWW1S °3y�e�1 �V9qF4yy`�� IL-�L b66 �iC'�tl l II�IIP II -11 I_L=11= o 2131N33NOI1f161LI1SIOQM/ F 'osg�`'S" :. 3 o"' a s sLO t' 9 Q y� v p Q g � '� p 9 a n p, B g 3Sf10H321VM HlaON A'J2i3N3 0a3213N Ol l �JNIO�If1B F` # ) g i q vVill w 3i wIrg 1i�'� SII N 1OW IZ�Z) -'Y C' K w 1 LU W_.C`Lu g I zR wz LBz� w Sez—� ,l� K�� r'- p qf� I�II:41:lt 96 5 °3y�e�1 �V9qF4yy`�� IL-�L b66 �iC'�tl l II�IIP II -11 I_L=11= o LU F � r ' " =11 U N O wIrg 1i�'� SII N W s a p qf� I u W Op aV w0 ¢w z y o0 Z i Lu M U O m 0 t - U w U) U) ccU w Q � Z o O WG W cr O 00 z 0 0x w w0 0 0 0 z 8 a� I�II:41:lt IL-�L II�IIP II -11 I_L=11= ' " =11 Ni,,� II 1i�'� SII �� 11 SII 1• 1.1'= 1..11 x.11 SII: I u W Op aV w0 ¢w z y o0 Z i Lu M U O m 0 t - U w U) U) ccU w Q � Z o O WG W cr O 00 z 0 0x w w0 0 0 0 z 8 a� z O ..1 T O .Z1 X 0 m O< � M 4 XO nr, I-< O z NIS" ND1Y0 GNY0NYIS IID 36R UOi NAYINVIN m ,AMINO WON GNY '831YBD 'MMU NDI1Ywyaal WVU D "AON I T m ENOLISH STANDARD OWING FOR STAIE GF p; FRAME, GRATES, AND NIDD Do'T+' OF HTRAMEP0RCAROLINA 7ATI0N ... FOR USE DN S7ANDARO GTCN BABIN f.1. DF NIm■.YS m g o NIM ND1YJ OUVOWl6 NO 3611 HO GOON GNV 'B31YND '3M'4 S N 'HDI31 6AYNIFJIH i0 NDI6IN0 NIl,wii N°aPN1d3a m • Bod DNINYNO OWGNYIS HSTION3 i0 31Y1i g 2 .. s" ' z1E f ! e 4 coo+x+� (� mm i m Da+a l STORM DRAINAGE DETAILS (I OF 2) Y 9 _ p dIlk , pa �d r3 f LIC owl r xa R I� �r o+Nn+YNm..... m f: 1. •' r o 611 E.OLISN STAAmARD 0RAT11NO FOR FRANE, GRATES, AND HOODRDRTM FOR USE ON STANDARD CATCH BASIN STATE OF CAROLINA DER OF TRANSPORTATION SRALEION OF HN■■AYS 3dld ,.F9 NWL ..Sl HIM NO1VO 3130311100 3Ad J9 rDDu it 130 NIM HOLY* )I9IBR e �+ ENGLISH STANDARD DRAWING FOR STATE OF S ^ CONCRETE CATCH BASIN NORTH CAROLINA ,. 13' THRU Sd• PIPE PTY OF TRANSPORTATION o BRICK CATCH BASIN NINTH CAMLINA IEPT IF TRANSPORTATION .� 17 THRU SL'PIPE 0fY161■16 MI—. 3dId JYnnHLz1 Ilpj �Yl�diMiNl io''!d NIm HOlvo NO INS wnDlln HINaN ONISNIN owmis Hi1l0N3—P;iD 31Y1i t Z -Vi E § � a a ee e 9p � h i � \ ISEI BRICK CATCH BASIN I NDR1N CAROLINA ry 17TW3U01'PIPEI IR �TRAIW^PORmT�47M[DN ? Cl1 4 7 9 04 >; m c BUILDING 110 c, rme NET ZERO ENERGY NORTH WAREHOUSE AND DISTRIBUTION CENTER $ i a A 3 A aN p E a R a i t 6 n Rap A G a a • g'y d g 2 .. s" ' ,aonuu+uuaoi p a �b, c,� p ::� "9y G '° Jot E eV 6 ggg -gE =o f� h�>o� 4 coo+x+� (� mm i m Da+a l STORM DRAINAGE DETAILS (I OF 2) Y 9 _ p dIlk , pa �d r3 3 o+Nn+YNm..... m f: 1. •' 0 •A1VLWA d0 NOI8IAI0 3dld .OH 11011 .91 Nm'I IM�wNE1110c AmIll dONO 313I11111 NORTH CAROLuu BRICK CROP INLET A DER OFrTMNSP(�TA1 SON 12' TNRU 30" PIPE s 'U'N 'H013WH 9A11NIIOIM i0 NOISIAIO NOunMDdsrnMl i0 ld3a YNI Wtl19 NLMM •■ P O O""Pxnuuu,yw e oi � - VGA ONIM110 OtlrONr1B N6117N3 y ,f[ 9 6 C Q 1(. /� .10 l) SIIVL3a 39M'IIY!!0 NlIO1S s 1y l 011, $ s s d= 2 tf•n�;�q• l a3A3allounelalsmalro IS o Sicq -5! o r '.e g'�a pp`� q �3 « All" a s t 1 I - I r e I ! 1 t1. B ➢ p� 7 4 ➢ o a ➢ a ➢ 3snOH3MVMH1a0NA'JM3N3oa3Z13N I"„o., 011 Miming oLL 6 �% r� .a��ll'• STATE OF - ENOLISX STANDARD OWING FOR __ NORTH GIROLINA TRAFFIC BEARING GRATED DROP INLET Nvi DEPT OF 1RAKSPoRTA7IM DIVISION OF XI(3M33 ! i w 0 •A1VLWA d0 NOI8IAI0 3dld .OH 11011 .91 Nm'I IM�wNE1110c AmIll dONO 313I11111 NORTH CAROLuu BRICK CROP INLET A DER OFrTMNSP(�TA1 SON 12' TNRU 30" PIPE s 'U'N 'H013WH 9A11NIIOIM i0 NOISIAIO NOunMDdsrnMl i0 ld3a YNI Wtl19 NLMM ' 831YMO OIIx 3WVtl• 118000 NOMI 161/U UO• allli dOBO 03LVVD BRIMS 319"" UDi MIMVUO OUIONYIB x9I10013 37d .OD nMU .LL _ 13TNI dOVO 3031100 3 i0 31Y1S �=t s - VGA ONIM110 OtlrONr1B N6117N3 a ' ! $ s t F -j tf•n�;�q• . •! o ° Sicq -5! o r 4 � pp • iD1� 1 I - I r e I ! 1 t1. I I i e 'll r9 :11•C�aA, AEiY�li r� .a��ll'• STATE OF - ENOLISX STANDARD OWING FOR __ NORTH GIROLINA TRAFFIC BEARING GRATED DROP INLET Nvi DEPT OF 1RAKSPoRTA7IM DIVISION OF XI(3M33 ! i w 66 � E t ° ' I i 0 p STATE OF NORTH CAWINA MNS DEPT. M TPOIITAnM OmetM OF NIOiLTB RALEIGH, N C ENGLISH STANDARD MIND CONCRETE OR INLET 12- THMJ 30• FIPE F01 M '1DI31Y• HAY/IOIN i0 MO181AI0 MDtivl.lDd°TNMI i0 W30 rNIl0A7 WARM i0 31x18 ' 831YMO OIIx 3WVtl• 118000 NOMI 161/U UO• allli dOBO 03LVVD BRIMS 319"" UDi MIMVUO OUIONYIB x9I10013 3 i s s pi $ s F -j I o ° rr e r 4 � I I 1 1 iD1� 1 I - I r e I ! I I i e F� r� is STATE OF - ENOLISX STANDARD OWING FOR NORTH GIROLINA TRAFFIC BEARING GRATED DROP INLET Nvi DEPT OF 1RAKSPoRTA7IM DIVISION OF XI(3M33 FOR CAST IRON DOUBLE FRAME AND ORATES _ RALE[ N O w 0 N '10131W 9A 61. d010[SUIO S1 0.0..1 0.8 C ONO On Ht IM 3E0 .I1r1tlOdSNx01 i0 ld3O 03LYED ONY 311111Ytld LITNI dONG rN11GK0 WUM m v� i0 31Y38 l0i MINMD 06xONr18 N-EyI1ON3 •� I W +, L I Ws = i •L LL cc I J, LL __ LL Z IL LL ; LL Z3 5 f0 _ w Lu .j a •� I (� L L. _ �W cc I r W = W •n61 _ - SS. 0-A 6 = o W � H �JL " STATE OP ENGLISH STANDARD DRAWING FDR RTH GWOLINA DROP INLET FRAME AND ORATES DEPTNOOF TSAMSPMTATION FOR USE WITH STD. 011110 S 810 14 AND 040.15 DIV ISIM OF HIGHWAYS RALEIGH. N C — N 7 N '10131x0 • SA,ml. 10 NOIHIAIa 83LM aNV 3RYMi 310800 NOW NSVD MOi P NOEIV1NOdSRx01 i0 1d30 y CN "JO N1O N LITNI dO0 03LYHO ONIVV31 3IddYtll O !0 31x18 1110,1894110m aHyGNVlS HSIISN3 ii 8 Si � eg 8 yy 0 TEP 6 n C� a E� ac i -3¢IasiaYd a 5 e9 L � y �3 p sanggg �ggr.�g�ggig�tggi 3� �l11i��Je��aBl�-.G8C6c�i� >f, 0 _ 0 ER � �! Cid �. x 4 C!� x _ 6 ! o � I TRAFFIC awaLINA I BEARING GRATED DROP INLET ^_.IaRnLINA I BEARING ORATED DROP INLET ^I DEPT a< TMNBPMTAnM FOR LAST IRON WALE FRAME AND ORATES 43331 Dme1M M xII2Rura aALEIGH, N C .m 0 ' 0 'a ' � s $ s iD1� F� r� is Nvi 11 w 7 N '10131x0 • SA,ml. 10 NOIHIAIa 83LM aNV 3RYMi 310800 NOW NSVD MOi P NOEIV1NOdSRx01 i0 1d30 y CN "JO N1O N LITNI dO0 03LYHO ONIVV31 3IddYtll O !0 31x18 1110,1894110m aHyGNVlS HSIISN3 ii 8 Si � eg 8 yy 0 TEP 6 n C� a E� ac i -3¢IasiaYd a 5 e9 L � y �3 p sanggg �ggr.�g�ggig�tggi 3� �l11i��Je��aBl�-.G8C6c�i� >f, 0 _ 0 ER � �! Cid �. x 4 C!� x _ 6 ! o � I TRAFFIC awaLINA I BEARING GRATED DROP INLET ^_.IaRnLINA I BEARING ORATED DROP INLET ^I DEPT a< TMNBPMTAnM FOR LAST IRON WALE FRAME AND ORATES 43331 Dme1M M xII2Rura aALEIGH, N C .m 0 ' 0 'a A¢exvran oax e R � N m ym n � !+ _ 0 r✓' u!a n!a � t ris O m ' 0 a x A¢exvran oax e R cn o •awm� m 49— c o Big fR • -� OOH• , I II S: 0 � N m ym n � BL ING UID110 I NET ZERO ENERGY NORTH WAREHOUSE��o� AND DISTRIBUTION CENTER auwwl LANDSCAPE PLAN— u v �Y t ris l m ' 0 3 O53 x yr �s 1 D i ! ! A 4 9 < }�y lmri oMr.� N 10 cn o •awm� m 49— c o Big fR • -� OOH• , I II S: 0 m o; a � R 7 m ym n � BL ING UID110 I NET ZERO ENERGY NORTH WAREHOUSE��o� AND DISTRIBUTION CENTER auwwl LANDSCAPE PLAN— u S 5l s~ �Y n .o .a og11 M 0� ��� A l m ' � gnumilnuo�"o 4 0 9 y m � 0 a H m o; a � R 7 m ym n � BL ING UID110 I NET ZERO ENERGY NORTH WAREHOUSE��o� AND DISTRIBUTION CENTER auwwl LANDSCAPE PLAN— $ g gg C i :�� S 5l s~ maomunnurro m t Z n .o .a og11 M 0� ��� A l m ' � gnumilnuo�"o Z O �V OOf Z WU Mjr QLL O LL �— O Z O O O I��naIlmj1ol OOO0. 211.1 u°�lId�� Ha O V O O N rr;!��~�, Q OO O O O O osO Ou Hp CL 101 ' O °°O°U Spl 1'MImbin"aO v a II II II ;;� I Iz 0. go slz��5�5 0 w w r i = ,_ 6,o� a tlt 1f'` rl .. .. i A/'^' n Ro qq gg �Tvl SlIV1303dVoS4NY1xM Hiprus _ ` gage I � � � I �a oY I � o 0 � � 11, -u a a $� �� ��Q a° C . a _ ! Y Y 5 T Y p 5 r p 3 g= q E `c 113. N30 NOUnSINUSIO ON' .3N 3Sf10H32MM NlLION A°J213N3 Oa3Z A111, Ott `JNIOl1t19 F ;, Liz R i C e 1 t� 8 T N N Z O �V OOf Z WU Mjr QLL O LL �— O Z O O O I��naIlmj1ol OOO0. 211.1 u°�lId�� Ha O V O O N rr;!��~�, Q OO O O O O osO Ou Hp CL 101 ' O °°O°U Spl 1'MImbin"aO v a II II II ;;� I Iz 0. go slz��5�5 0 w w r i = ,_ 6,o� a tlt 1f'` rl .. .. i A/'^' n Ro qq gg