Loading...
HomeMy WebLinkAbout20140704 Ver 2_Credit Release Task 3_20160809 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Water Resources S. JAY ZIMMERMAN ENVIRONMENTAL QUALITY Director August 9, 2016 DWQ Project#: 2014-0704v2 Johnston County Daniel Ingram EBX Neuse 1, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 Re: EBX Neuse Riparian Buffer Umbrella Mitigation Bank Instrument (UMBI) Buffalo Branch Buffer&Nutrient Offset Bank Parcel Credit Release—Task 3 Dear Mr. Ingram: On May 31, 2016,the Division of Water Resources (DWR) received an As-Built Report from EBX Neuse I, LLC (EBX), an affiliate of Resource Environmental Solutions, LLC (RES), for the subject site. On June 9, 2016, Katie Merritt with DWR,requested clarifications to the report. On June 9 2016, Brian Hockett w/EBX provided a satisfactory response to the clarification request. According to the As-Built survey submitted with the As-Built Report, there are slight adjustments in the total amounts of Buffer Mitigation credits and Nitrogen Nutrient Offset credits as compared to the Bank Parcel Development Package. The subject site has generated 14.2 acres (618,552 ft2) of buffer restoration credits, 0.68 acres (29,621 ft2) of buffer preservation credits (unchanged) and 6.97 acres (15,843 lbs-N) of Nitrogen nutrient offset credits. The credits being released have been modified to reflect any changes to the creditable acreage as proposed in the BPDP. On April 13, 2015, DWR received a performance bond (#RLB0015986) to cover performance obligations for the construction of the subject site. This bond expired on March 18, 2016. By copy of this letter, the performance obligations to construct the subject site have been met and DWR is releasing EBX from its financial assurance obligations with regards to the performance bond (#RLB0015986)with RLI Surety, a division of RLI Insurance Company. On August 9, 2016, DWR received a performance bond (#RLB0016536) issued to EBX to cover monitoring and maintenance at the subject site. The term of this bond applies from July 19, 2016 to July 19, 2017. Therefore, EBX is required to renew the performance bond prior to July 19, 2017 and is required to renew the bond annually for at least 4 more years. Future credit releases will be dependent on both the renewal of this performance bond and the annual monitoring reports. State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center Raleigh,North Carolina 27699-1617 919 807 6300 Buffalo Branch (EBX) August 9, 2016 Page 2 of 2 According to the UMBI signed on November 10, 2008, the following Project Milestones have been met, and the corresponding credits shall be released: Task/Milestones Credit 3) Approval of As-Built Report 10% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above-referenced tract and 10% of your Neuse riparian buffer credits (0.10 x 618,552 ft2 =61,855.2 ft2) excluding Preservation minus 266.4 ft2 yields 61,588.8 ft2 are now available for sale. Additionally, 10% of your Neuse riparian buffer Preservation credits (0.10 x 29,621 ft2=- 2,962.1 2,962.1 ft2) are now available for sale. Lastly, 10% of your nitrogen nutrient offset credits (0.10 x 15,843 lb-N= 1,584.3 lb-N)plus 21.6 lb-N yields 1,605.9 lbs-N are now available for sale. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Watershed. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295,which became effective on November 1,2015. Additionally, buffer Preservation credits cannot be converted into nutrient offset credits. Please feel free to call Katie Merritt at (919) 807-6371 if you have any questions regarding this correspondence. Sincerely, Karen Higgins, Supervisor 401 and Buffer Permitting Branch KAH/kym cc: File Copy(Katie Merritt) Cara Conder—EBX (via electronic mail)