HomeMy WebLinkAbout20160788 Ver 1_RE Bridge 73 on SR 1324 (Ollie Harkey Rd) in Davie_20160812
Carpenter,Kristi
From:Wanucha, Dave
Sent:Friday, August 12, 2016 11:44 AM
To:Carpenter,Kristi
Subject:RE: Bridge 73 on SR 1324 (Ollie Harkey Rd) in Davie
Follow Up Flag:Follow up
Flag Status:Completed
NW3 for the record only.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Carpenter,Kristi
Sent: Monday, August 08, 2016 5:03 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: RE: Bridge 73 on SR 1324 (Ollie Harkey Rd) in Davie
Dave,
Can you let me know if this project is indeed a NW 3 that is for the record only?
They state it could be a NW3 or NW14 and I did not see the total stream impacts, making it a tough call for me to make.
Thanks,
klc
From: Euliss, Amy
Sent: Friday, August 05, 2016 2:26 PM
1
To: Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil) <John.T.Thomas.JR@usace.army.mil>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Chambers,
Marla J <marla.chambers@ncwildlife.org>; andrew_henderson@fws.gov; Swicegood, Dale L <dswicegood@ncdot.gov>;
Evans, Rachel C <rcevans@ncdot.gov>; Bailey, Kevin (Kevin.Bailey@stvinc.com) <Kevin.Bailey@stvinc.com>; Vance,
Edward (Edward.Vance@stvinc.com) <Edward.Vance@stvinc.com>
Subject: Bridge 73 on SR 1324 (Ollie Harkey Rd) in Davie
John,
This is the bridge replacement project we discussed on the phone yesterday. We’re replacing Bridge No. 73 (SR 1324)
on Ollie Harkey Road (SR 1324) in Davie County with a new bridge. We believe this project can be authorized under a
NW 3. This is a courtesy copy for DWR. A copy of the permit drawings, stormwater management plan, cultural resource
reviews, and NLEB streamlining form (with clearing acreage) are attached.
Also, we committed to a tree clearing moratorium from May 15-August 15 as a conservation measure to avoid
disturbing potential Northern long-eared bats in their summer roosting habitat under the ‘Interim 4d rule’. However,
with the issuance of the ‘Final 4d rule’, NCDOT will no longer meet the moratorium.
or the proposed action, NCDOT has committed to the conservation measures listed below:
Thus, f
1)No alterations of a known hibernaculum’s entrance or interior environment if it impairs an essential
behavioral pattern, including sheltering Northern long-eared bats (January 1 through December 31);
2)No tree removal within a 0.25 mile radius of a known hibernacula (January 1 through December 31);
and
3)No cutting or destroying a known, occupied maternity roost tree, or any other trees within a 150-foot
radius from the known, occupied maternity tree during the period from June 1 through and including
July 31.
NCDOT has determined that the proposed action does not require separate consultation on the grounds that
the proposed action is consistent with the final Section 4(d) rule, codified at 50 C.F.R. § 17.40(o) and effective
February 16, 2016. Section 7 responsibilities are therefore considered fulfilled.
Let me know if you have any questions or concerns.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
3