Loading...
HomeMy WebLinkAboutTurnage Heights Lift Station Abandonment & Mud Creek Outfall�r WaterResources ENVIRONMENTAL QUALITY Department of Water Management Attn: Jim Harding 101 City Hall Plaza Durham, NC 27701 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director August 9, 2016 Subject: Buffer Determination Letter JBRRO 914-375 v2* Durham County *JBRRO #14-375 v2 replaces JBRRO #14-375 dated October 17, 2014 Determination Type: Buffer Intermittent/Perennial ❑ Neuse (15A NCAC 213 .0233) Start@ ❑ Tar -Pamlico (15A NCAC 213 .0259) ® Intermittent/Perennial Determination (where local buffer USGS ordinances apply) ® Jordan (15A NCAC 213 .0267) Subject (governmental and/or interjurisdictional projects) Survey Project Name: Turnage Heights Lift Station Abandonment & Mud Creek Outfall Address/Location: Properties are primarily undeveloped lands owned by Duke University. Stream(s): Muddy and Sandy Creeks Determination Date: October 14, 2014 and Staff: Cherri Smith June 30, 2016 Stream/ E/1/P* Not Subject Start@ Stop@ Soil USGS Drainage Subject Survey To o Mud Creek P X - X X throughout project area Sandy P X — X X Creek throughout project area Drainage 1 E X — X throughout project area Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Turnage Heights Lift Station & Mud Creek Outfall Durham County August 9, 2016 Page 2 of 3 Stream/ E/I/P* Not Subject Start@ Stop@ Soil USGS Drainage Subject Survey To o Drainage 2 E X — X throughout project area Drainage 4 E X— X X throughout project area Stream 4 I X DWQ Flag X X (start) Stream 5 I X DWQ Flag (start X off property, but 50' buffer may extend onto project area) Stream 6 I X — present on the ground but not mapped (See Figure 3A Sketch Map) Drainage 7 E X— X X throughout project area Stream 8 I X DWQ Flag X (start) Drainage 9 E X— X X throughout project area Drainage E X — X 10 throughout project area Stream 11 P X — DWQ Flag X X throughout (Stop flag off project area project area) Drainage E X — X 1113 throughout project area Drainage E X — X 12 throughout project area Stream 13 1 X DWQ Flag X (start) Stream 14 P X— X throughout project area Stream 15 P X — X throughout project area Stream 16 1 X DWQ Flag X (start) Turnage Heights Lift Station & Mud Creek Outfall Durham County August 9, 2016 Page 3 of 3 Stream 17 I X DWQ Flag X (start) Drainage E X — X 18 throughout project area Drainage Wetland X X X 19 Drainage E X — present 20 on the ground but not mapped (See Figure 3A Sketch Map) *E111P = Ephemeral/Intermittent/Perennial Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter.. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this termination, please feel free to contact Cherri Smith at (919) 791-4251. Si cer ly, Danny Smi� Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Kim Hamlin; SEPI Engineering & Construction; 1025 Wade Ave.; Raleigh, NC 27605