HomeMy WebLinkAbout20160770 Ver 1_EC Sequence Precast Arch Colvert_20160808 N.C. D.O.T. BRIDGE MAINT. DEPT. EROSION CONTROL SEQUENCE COUNTYRockingham 33 BRIDGE NO. Prong Mary's Creek ACROSS S.R. No.SR 2359Huffines Mill Rd PROJECT No. 37272 DESCRIPTION: 18.0' X REMOVAL of EXISTING BRIDGE 39'LONG and REPLACE with PRECAST ARCH CULVERT1 @35' 3"wideX 8' X32'SPAN Note: All Erosion Control devices & proper installation plus maintenance of erosion control will be performed by using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual 1 PLACE FILTER FABRIC UNDER BRIDGE TO CATCH ASPHALT & DEBRIS 2 REMOVE EXISTING BRIDGE THEN FILTER FABRIC 3 USE SILT BAG FOR STILLING BASIN 4 SANDBAGS IF NEEDED TO DIVERT STREAM FROM FOOTING #1 Note : IF NEEDED - BUILD ABC COFFER DAMS WRAPPED WITH PLASTIC IN WORST CASE 5 EXCAVATE SOIL to PROPER REQUIRED DEPTH FOOTING No. 1 6 INSTALL SILT FENCE AS NEEDED AND PUMP EXCESS WATER INTO SILT BAG. 7 POUR CONCRETE LEVELING PAD. 8 CONSTRUCT FORMS FOR FOOTING # 1 AND POUR CONCRETE. 9 REMOVE COFFERDAM FOR FOOTING #1 10 SANDBAGS IF NEEDED TO DIVERT STREAM FROM FOOTING #2 11 EXCAVATE AREA FOR FOOTING # 2 TO REQUIRED DEPTH. 12 INSTALL SILT FENCE AS NEEDED AND PUMP EXCESS WATER INTO SILT BAG. 13 POUR CONCRETE LEVELING PAD. 14 CONSTRUCT FORMS FOR FOOTING # 2 AND POUR CONCRETE. 15 REMOVE COFFERDAM FOR FOOTING #2 16 SET 3 SIDED CONCRETE CULVERT 17 BACKFILL CULVERT AND SHOULDERS. 18 PLACE FILTER FABRIC AND RIP RAP AS NEEDED. 19 SEED EXPOSED AREAS AS NEEDED 20AFTER VEGETATION is ESTABLISHED REMOVE ALL EROSION CONTROL DEVICES APPROXIMATE PROJECT START DATE3/1/2007 PREPARED BY :Tim PowersTRANSPORTATION TECH. DATE5/3/2006 APPROVAL DIV. BRIDGE ENG. ___________________ DATE __________