HomeMy WebLinkAbout20160766 Ver 1_B-5744_Hyd_PermitDrawing_20160808�
See Sheet 9-A For Index of Sheets
�
�
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO
� � LIMITS ESTABLISHED BY METHOD III.
U
� �
�t3
Fn
A
� V GRAPHIC SCALES DESIGN DATA
� 50 25 0 50 700 ADT 2010 = 1400
E„ ADT =
�
O
� PLANS K °
� � �, D = %
��'� � 50 25 0 50 100 T= b %*
� �,�,
w�w V = 60 MPH
��Q PROFILE (HORIZONTAL) * TTST = DUAL
��z
��� l0 5 0 l0 20 FUNC CLASS =
���
��� LOCAL
���
��� PROFILE (VERTICAL) SUBREGIONAL TIER
���
��� 1L � �� ����� `�/�������
���%����� �IF �1��II���1�5
scoTz��� CO U1�lTY
LOCATI011I: BRIDGE 1110. 820050 ON SR 1615 (HASTY ROAD)
OVER BRIDGE CREEK (aka LEITH CREEK)
TYPE OF WORK: GRADI11lG, DRAl11tAGE, PAVING AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEG71V PROJECT B-5744
-L- Sta. 10+25.00
\ SITE 1 -
9TAT6 9TATE PROJECT ftBPERENC6 NO.
1��� B-5744
PR01.N0. .A.PROI.NO.
45700.1.1
��
E1VD PROJECT B-5744
U S 18 + 50 00
J.� � BRIDGE — ta. .
C,p �� CREEK
���Y��y� (aka LEITH
\CREEK)
�'O
qd, y . . . . . � , *� . .
r ` . . ' 4/ `' * } � t -L� • � ' , . . ' TD' Sf►1I'R,N,4 CHURCH RD
�.SR 16 f]'ASTY R�AD ' x f
�*t'.t`* .
BEGIN BRIDGE
-L- POT Sta. 14+93.75
PROJECT LENGTH
LENGTH ROADWAY PROJECT B-5744 = 0.133 mi
LENGTH $TRUCTURE PROJECT B-5744 = 0.023 mi
TOTAL LENGTH OF PROJECT B-5744 = 0.156 mi
�l\\�` *END BRIDGE y
�\ `\ -L- POT Sta. I6+1612
r � � DIVlSION OF HIGHWAYS
\J� I� DIVISION 8
3YYOGI.F_\RO}'�I,RD.RAI,EIGfI,NI'.`29617 902 N Sandfiil(s Blvd
"I1�:1,I:Yl'I.JRS.0Y4h1'AX ��I'J.788A93`L Aberdeen, NC 28J15
vc uc�L��.se nr�ixs
2012 STANDARD SPEClFICAT/ONS
RIGHT OF WAY DATE: BRIAN A. WILES, PE
J U LY 1, 2 O� 6 PROJECT ET'GINEER
LETTIIVG DATE:
DECEMBER 2016 TIM WELCH PE
NCDOT CONT9CT
D!V 8 BRIDGE AROGRAM MANAGER
HI'DRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
PB.
s�
OF�9CIUPlYON
P.E.
UOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DATUM pESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVEIOPE� FOR THIS PHOJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUAENT "85744-2"
MITH NAD 83/NA 201t STATE PLANE GRID COOROINATES OF
NORTHING: 331382.861ft1 EASTING: 1863963.09tft1
ELEVATION: 151.47(ftl
THE AVERAGE COA6INE� GRID FACTOR USE� ON THIS PRQIECT
lGROUND TO GRID) IS: 0.999923465
THE N.C. LAABERT GRID BEARING AND
LOCALIZED HORIZ�NTAL GROUND DISTANCE FROM
"85744-2" TO -L- SiAT10N IS
AlL LINEAR DItiEN510NS ARE LOCAIIZED HORIZONTAL DISTANCES
VERTICAL DATUAI USED IS NAVU 88
•
-L- POT Sta. 10+25.00 /
BEGIN CONSTRUCTION "0°os
SEE DETAIL A
USE PSRM TO LINE PROPOSED ROADWAY DITCH
STA 10+25 TO 11+75 -L- Rt
�O
BMI ELEVATION = 143.92 �
N 331425 E 1864214
BL STATION 14+30.00 65 LEFT ��
RAILROAD SPIKE IN 16" POLAR
�..:.....».:.....,.«.+:..:......:.......
Pl 510 /3+�6.38
�= 32 40' 34P fLTJ
D = l0' 25' 02T
L = 3/3.67'
T = l6/23'
R = 550.A0'
�
C ENGINEERING
�
3220 GLEN ROYAL RD. RALEIGH, NC 27617
TEI_E 919.788.0224 FAX 919.788.0232
NC LICENSE xp.p189
C�' 101FIRMAPE USM ERR606 7,00
� O � 4'
«
2 �
� tih, �
wo JOE DAN MANiS a J he�� �
°ps MARY MAI�NS o "
CL B RIP RAP PAD � F�
STA 11+75 -L- RT
EST 7 TON
O
TtiE aD SUYRNA PRESBYTERiAN CNURCN
DB i320 PC 309
DB i4M PG i6i
DB i3L PG �97
DETAIL A
ROADWAY DITCH
� N � �a s�oie�
urol A� � DtVi
Gro�nd ��/ p F��e�
d
Min. D= 7.OFt.
Type of Liner- PSRM Max d- 1.OF�.
FROM STA. 10 -r 25 TO STA. 11 �i- 75 -L- RT
OB i5N PC n3 y O
HAYNES B. STONE !�
� PEGGY O.STONE
� � DB 369 PG 225
/ o� I -L- POT Sta. 18+50.00
� CL B RIP RAP PAD ��' CL II RIP RAP
s� iz+oo -�- �r ' ;� END CONSTRUCTION
g / PROP SBG FROM APPROACH SL4B
EST 1 T NW�L�DS y % W TO STA 16+50 -L- LT
� �
PROJECT REFERENCE NO. SHEET NO.
B-5744 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
� -Y� � � -t ,r < < , - �
w � i'- y- Y- i Y. y- -!'- �i Y- �' 1� Y 1�
� �w000s .� � wEr� os � w oos �- -�
\ Y- > � - 4' . 3i^ E '�- Y- � '�WETLANOS '� Y- Y- Y- +1FOODS
* E � � � � �- � � � -�
a � � � a � � w y�"°s �
�� F ;�. Y- Y � IP P . _ _w _r_. �: .. y� -k' '� wie�o^r',�r`�'r
_k . . . .. .. . . .. .. . 4.. _
�\ �� �X3S ELEC �n p n Gld+b � 8d � �
�. , v
\ —�— r '
\� � � � � � �� --__---_--
� S _ I ---------------TO SMYRNACHURCH RO
\. _�� n� $ 8 � SR 16/5 HA57Y RD 19' BST 11'
\ � � � J0� .. U 350 8J — —4N .. .. .. .. .. .. .. .. .. .. . .. . _
�. � � .. .. ..
F F q 2 Y- *:Y� :K —"_ _-_ ___-_
/�/ � � *�* � 6 . � . �. . . . . � MLB— — � _ _ � _ � � � — � —� — � �(B� .
E WET ANOS
�rF'o o. 1 t Y- � � Y-
.� J'- Y- y 9- �. 1 1 Y- 1'- Y� i'� '� WOODS Y� Y-
W00 '�WETLANOS � Y- c�y�F -� 8 � ;v ,� � 1 � 1 � 1 � 1 -�
,p N�ETLANOS � .y .�' 1
DS � Y � �k' '� �` \ -y \ .� ,Y- Y- Y�
�\ '.\ S S�,r� WOOOS
CL II RIP RAP
� DENOTES FILL IN
WETLAND
� DENOTES MECHANIZED
CLEARING
50' 0' S0' 100' 150'
GRAPHIC SCALE
FOR PROFILE. SEE SHEET 5
O
CARROLL'S REALTY PARTNERSNIP
OB NE PG n
pB 12T PC 32�
-L- PT Ni68B2
�RAU
-�� . ._-."... _ .
--v. - 1
-�� � /
- — s:
'L'
-C- POT Nt9.i75 -[- P�! A6+A625
Bd
�ILL �1 MI ' --
n�LL �I MI 1 -�i
I I 9!
,,, - 1 8:i
DATUM pESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVEIOPE� FOR THIS PHOJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUAENT "85744-2"
MITH NAD 83/NA 201t STATE PLANE GRID COOROINATES OF
NORTHING: 331382.861ft1 EASTING: 1863963.09tft1
ELEVATION: 151.47(ftl
THE AVERAGE COA6INE� GRID FACTOR USE� ON THIS PRQIECT
lGROUND TO GRID) IS: 0.999923465
THE N.C. LAABERT GRID BEARING AND
LOCALIZED HORIZ�NTAL GROUND DISTANCE FROM
"85744-2" TO -L- SiAT10N IS
AlL LINEAR DItiEN510NS ARE LOCAIIZED HORIZONTAL DISTANCES
VERTICAL DATUAI USED IS NAVU 88
•
�O
.... ............».».,,.......»..,......
BMI ELEVATION = 143.92
N 331425 E 1864214 �
e't`*BL4YyAT10N`+14«�30.00 65+Y+*T'ef..f /
� � RAILROAD SPIKE IN 16" POLAR
j �
� .%
< !
TO cyqH� �+ w0oos � - . .~ ��
90� ..+.\3 , .. \
� � `�f\ �.. �� .. �
. ` \ ., x�j � \ . `k .
�F � \
-L- POT Sta. 10+25.00
BEGIN CONSTRUCTION "0°os ` F �'
SEE DETAIL A - ........ �
USE PSRM TO LINE PROPOSED ROADWAY DITCH i CL B RIP RAP Pf� F
STA 10+25 TO 11+75 -L- Rt STA 11+75fL- RT �_
EST 1-TON
�
O
TtiE aD SUYRNA PRESBYTERiAN CNURCN
DB i320 PC 309
DB i4M PG i6i
DB i3L PG �97
DETAIL A
ROADWAY DITCH
� N � �a s�oie�
urol A� � DtVi
Gro�nd ��/ p F��e�
d
Min. D= 7.OFt.
Type of Liner- PSRM Max d- 1.OF�.
FROM STA. 10 -r 25 TO STA. 11 �i- 75 -L- RT
Pl 510 /3+�6.38
�= 32 40' 34P fLTJ
D = l0' 25' 02T
L = 3/3.67'
T = l6/23'
R = 550.A0'
�
C ENGINEERING
�
3220 GLEN ROYAL RD. RALEIGH, NC 27617
TEI_E 919.788.0224 FAX 919.788.0232
NC LICENSE xp.p189
C�' 101FIRMAPE USM ERR606 7,00
PROJECT REFERENCE NO. SHEET NO.
B-5744 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
O � �
2 �
� tih, �
�
JOE DAN MAN�S b J o�'�"•'� �
MARY MAWS �, O
OB i5N PG n3 j
HAYNES B. STONE !�
� PEGGY O.STONE
� � DB 369 PG 225
/ o� I -L- POT Sta. 18+50.00
� CL B RIP RAP PAD - ��' CL II RIP- RAP.
sr� iz+oo -�- �r ' '� END CONSTRUCTION
'�� � �� PROP SBG FROM APPROACH SL4B ��
E\T 1 T NWF�TLANOS �. y � m TO � STA 16+50 -L- LT ..... . . . . . . ..... .. ..
� -� �- . . °' ' . .
� r < < < , _ _ , . . - - ,
w �� � � ... Y- y � Y- . �� Y Y- Y- J Y- Y- Y. Y- 1� Y- '- .
� �w000s � � wEr� os � ..� �� wq�oos ,� v -� �- -� �F000s �- �
WETLANOS
\ r, .y. .:J i�i.,lQ' . 31" E . , y' 1'- Y- ..........,y�
.. * E � .. �,Y __ __ ' -
� k 1
_�� � -t 1 I Y- ... � Y �.... 1 Y- w L�N�S � _ _ ..
.._, . . F � * ,F I. Y � {P AP . . � _ - _� ::.. -. .- .. Y- _ - _-�'- Y- 1
�� _-. _ �_ _ �_ _ _. wtH_�r
_� _
y. ._ ' - ' — ___.,.... � .- .. - _ _ - — _ _.
� � �' _ -_ 3S EIEC �n � n - ' � "3 D� �3_ ... —.. . --_-_ . - _ -- � �.
\\ __-.— k :.. � �._ - 8�/ — � _ _ __- _____- _ _ .. _
� .. I . � I I � � � � -� - 11 .. --__-- .. .—_._ -- — R HURCH RO
� _ 70 SAIY NA C
+ \ ' --.�_ �� .� ', � �e 8 8 � SR 16i5 HA57Y RD 19'B5T 17' —_ _ ----
4 . _ .. '. ; .. ___--- __—_ '_- _ _
- ' . � � - � _ _ _ - _ _
�� ,� __ c�:� i�_ °o� _: _ uaso 8� N --- -- ---�— — _
�- �, � • �- _ � —�-- � _
� s o� _
..F F P ;�` --��.-..-x� -_`- - .
. . E/ �:K � sa9 � * � _ e _ _ . _ _ _ _ _ _ - _ .� "..- - ,k^ �Nte� _
/� -� * - . � � -r- ---g � � . -� -� �
_ � wer avos:
.�." y 1� E r`�'o. °, � i •0 -L - � � . Y- � -L � - - - t Y- _ _ _ �l � Y-
. y P m , i,... ' WOODS Y, Y� .
WOODS '�WETLANDS '� � . �r�F�. '\ �� - � � F � ,�t -� 1 -� . � .....� - �
Y � � �- WtTLAN05
�.C��. y \ .�' J'- Y- i� -'F Y- -'� Y -Y � �� �
�\ \., S� S� .. WOOOS �
� � \'a_':r) �.
CL II RIP RAP
� DENOTES FILL IN
WETLAND
� DENOTES MECHANIZED
CLEARING
50' 0' S0' 100' 150'
GRAPHIC SCALE
FOR PROFILE. SEE SHEET 5
O
CARROLL'S REALTY PARTNERSNIP
OB NE PG n
pB 12T PC 32�
-L- PT Ni68B2
�RAU
-�� . ._-."... _ .
--v. - 1
-�� � /
- — s:
'L'
-C- POT Nt9.i75 -[- P�! A6+A625
Bd
�ILL �1 MI ' --
n�LL �I MI 1 -�i
I I 9!
,,, - 1 8:i
� ENGINEERING PROJECT REFERENCE NO. SHEET NO.
L, � B-5744 5
_ ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
3220 CLEN ROYAL RD. RALEIGH, NC 27617
TELE 919.788.0224 FAX 9] 9.758.0232
NC LICENSE �P-OlS9
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
BRIDGE HYDRAULIC DATA
DES�GN DISCHARGE = 2700 CFS
DES�GN FREOUENCY = 25 YRS
DESIGN HW ELEVATION = /445 FT
BASE DISCHARGE = 4000 CFS
BASE FREOUENCY = IQD YRS
BASE HW ELEVATION = 142.58 fT
OVERTOPPING DISCHARGE = 4825 CFS
OVERTOPPING FREOUENCY= /OiD+ YRS
OVERTOPPING ELEVATION = 1429 FT
DATE OF SURVEY = 1358
W.S.ELEVATION
AT DATE OF SURVEY = 2�2�20/6 FT
B GlN R
- S A/0 25 /_ l+30 � W
E_ l .35 P= �2 20 - �
V= 80' = 4� � EN �R E
- = m -L ST l8
V = mph _ m W � _
% -105 /9%
REM VE OL � � �
���2 82i ,�, � �� CON RETE BUTME T
I I I ( P)5 II RIP RA
3. ' KEY-IN
� � � �
� i �� I
�
� � �
EXCA TION 37cy � � EXCAV ION— Ocy
�
BM � ELEV = 14392'
N 33/.425 E 18642/4
-L - STA 10+2pA1 843' LEFT
RR SPIKE lN l6' POLAR
�
�
.�
�
:�
�
�
�
�
�
�
Z
�
�G
�,�
��,
��
�� FOR PLAN, SEE SHEET 4
��
,��
��
���
�
�� 10 11 12 13 14 15 16 17 18 19 20
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 13+30 TO 16+67 -L- LT WETLAND IMPACT 0.03 0.04
1 13+40 TO 17+47 -L- RT WETLAND IMPACT 0.06 0.05
TOTALS*: 0.09 0.09 0 0 0
"Rounded totals are sum of actual impacts
NOTES:
'�'
k lif;llr� tlt North Carolina Department of Transportation �1
�i L C. }l`t 11ti'c11t °f I
, Highway Stormwater Program �;�-
STORMWATER MANAGEMENT PLAN --
(Version 2.04; Released November 2015) FOR NCDOT PROJECTS
WBS Element: 45700.1.1 TIP No.: B-5744 County(ies): Scotland Page 1 of 1
General Project Information
WBS Element: 45700.1.1 TIP Number: B-5744 Project Type: Bridge Replacement Date: 2/22/2016
NCDOT Contact: Art C. King Contractor I Designer: Karen Hefner, PE
Address: g02 N Sandhills Blvd. Address: 1011 Schaub Drive, Suite 100
Aberdeen, 28315 Raleigh, NC 27606
P hone: 910-944-2344 P hone: 919-851-6606
Email: ackin ncdot. ov Email: khefner mi-en ineers.com
Cit ITown: Laurinbur Count ies): Scotland
River Basin s: Lumber CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.156 mi. Surrounding Land Use: Rural
Proposed Pro'ect Existin Site
Pro'ect Buiit-U on Area ac. 0.5 ac. 0.4 ac.
Typical Cross Section Description: 2 lane undivided highway with 11' lanes crown. 2 lane undivided highway with 10' lanes crown.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: Year: Existin : 1400 Year: 2010
General Project Narrative: Existing 108' (1@18.1, 1@18', 1@18.1', 1@18', 1@18.1', and 1@18') bridge timber deck on I-beams with timber caps & piles, timber bulkheads at end bents and interior bents
(Description of Minimization of Water on SR 1615 (Hasty Road) spans Leith Creek. Existing bridge will be replaced while the road is closed (no detour bridge). The replacement bridge is three spans of 1@30' (21 "),
Quality Impacts) 1@60' (24"), and 1@30' (21 ") cored slab bridge with sloping abutments. The proposed bridge does not have any bridge deck drains, therefore, direct discharge to into the
stream is eliminated. Roadway drainage is collected into 1 TB 2GI at the eastern end of the approach slab and oulets to the left side into a rip rap pad.
Waterbody Information
Surface Water Body (1): Leith Creek NCDWR Stream Index No.: 14-33
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Swamp Waters (Sw)
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)