Loading...
HomeMy WebLinkAbout20080162 Ver 1_More Info Received_20080313ECS CAROLINAS, LLP Ldp Geotechnical • Construction Materials • Environmental 0 >;.,~ cue s Ms. Sue Homewood NCDENR, Division of Water Quality 585 Waughtown Street Winston-Salem, North Carolina 27107 Reference: Permit Application -Additional Information Request Approximate 7.7 Acre Tract -Highway 16 Wilkesboro, Wilkes County, North Carolina ECS Project # G-14464 DWQ#09-0160 pg- o~ t, a/~d Dear Ms. Homewood: I March 12, 2008 !-° ~ ~~~~ ~~1 MAR, 1 3 20~$ ~~3eFi4< '•P~AI'EF<GUAUTtl ~~,~=TIAP~!l3S a.NL SfCRAaWAfE~2 ~3FL4tJCN ECS Carolinas, LLP (ECS) received a letter from the NC Division of Water Quality that indicates that the above referenced application has been put on hold as incomplete (Letter Dated March 3, 2008). The purpose of this letter and the attached information is to provide you with the requested information so that the permitting process can proceed. 1. "Please submit documentation to justify the southern most (second) driveway and on NC Highway 16 and parking area immediately adjacent to the driveway. The location of this driveway requires stream impacts that it appears could be avoided with minimal changes to the project layout." The second driveway is the primary driveway that must be used for the proposed development. The first driveway is an entrance only (not clarified in the initial application) and does not provide an exit from the site to NC Highway 16. We've included a drawing with arrows showing the traffic direction into the site. A school is located on adjacent property east of the site. The entrance to the school is the intersection of NC Highway 16 and NC Highway 18. This intersection is extremely congested for two hours of the da during the school year. As you will notice, both of the primary driveways are located as far from the intersection, in the interest of safety and to avoid additional congestion. The secondary driveway located closest to the intersection is an entrance only that will be used primarily by vehicles that will be dropping off passengers at the site. They will still be required to exit onto NC Highway 16 or NC Highway 18, depending on the direction they are driving. For the site to be suitable for its proposed use, the primary driveways must remain in their current locations. 2. "Please provide a Stormwater Management Plan in accordance with requirements outlined on the Division's website: htt ://h2o.enr.state.nc.us/ncwetlands/stormwater and a.html " We've included as attachments the required stonnwater forms. 4811 Koger Boulevard • Greensboro, NC 27407 • (336) 856-7150 • Fax (336) 856-7160 f Response to Request for Additional Information Wilkesboro, North Carolina ECS Project 09-14464 March 12, 2008 Please contact us at (336) 856-7150 if you have any questions concerning this permit application or if there is a need for additional information. Sincerely, ECS CaROLiNas, LLP Michael T. Brame Senior Environmental Scientist cc: Ian McMillan 2 Permit Number: (to be provided by DWQ) Drainage Area Number: ~ Wet Detention Basin Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ~] does ^ does not incorporate a vegetated filter at the outlet. This system (check one): ^ does ~ does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be m;n;m;zed to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate the roblem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a lication. Vegetation is too short or too Maintain vegetation at a height of lon a roximatel six inches. Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: The embankment Potential roblem: Shrubs have started to row How I will remediate the roblem: R g emove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs re air. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The receivin wate The outlet device is dama ed Re air or re lace the outlet device. g r Erosion or other signs of Contact the l l NC oca Division of damage have occurred at the Water Quality Regional Office or outlet. , the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads ~ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads ~ feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM BIZ in the blanks) p Permanent Pool Elevation {E~,' ~~ "~~ ` Pe anen Pool ~ ' - - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation- " `~ ~~~ ~A~9.~` -ft Min. --------------------- I-.. --- -------~ Sediment Bottom Elevation ~'' ~~"'~~ `~ "~' Storage FOREBAY MAIN POND Volume 1-ft Storage Form SW401-Wet Detention Basin I&M-Rev.2 MAR-11-2008 TUE 10 20 AM Carolina Realty Incorp FAX N0. 13368381988 ainlt. i. 1UUd 3: h9NM ECS N0.311 i P. 4/~ Permit Numbor: (fo 6eprovlded byDWQ) I acb~owlodge and egroe by my si®natuco balaw that. I em responsible for zhe perForrnrotee of the maiatmartoc procedures listed ebova I agree to notify DWQ of say problems with. tl~ system ar prior to my ehartges to the system or responsible party. Projocrname: IRa /"L''I~~~ '~~'~iR~T~~ B.l~" drainage area riamber: „~ P. 02 PriAt name: ~ ~ 'Title: Gv~7/E ~ e Arlr.re• I ~ ~b f_it rdf1/i~2 ~. Cff ~l /~ /eo~9 n , U/ C lCf16D ~eo~li~ C - ~~9 ~ - ~/~ ~.~ ~ X36 ' / ~~{ .. /Ol / / cc // Signature; Date:~~~ d ~' Note: 7be 1t~xUy reapor<siblc pally ~QUId Hat be a hameownets aaaocietian unlosa aioro t4aa SO% of the lot+ have boon sold and a residoAt of the subdi'viaion Das been Hamad Ne prealdegt, ~, Gt opine ~ , ~ ie ~ ~rnu`1, a I~Iotary Public for the State of e S County of D~. ~Cc/0/In do hereby certify that ~Q.. _ ~~eV s personslly appaazcd befoxd the this day of 1~i4/QL~ ~ ~ ~, and acknowledge the due execution of the forgoing wvt detention basin maintenennae requireimants. Wittuss my band sad official seal, ..._--- - NADINE A. l,lE6ERMA NOTARY PU9LIC WILKES COUNTY, NC u Commission Expires; 811,___ ~_~~ sn~ My oommissioa expires v ~ ~D/'~ GZC~K-e- Form SW40t•Wet Dotention Basta l~M-Rev,Z Permit No. (to be provided by DWQ) lll. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. ?~1.,~,` ':`, ~`~ ~ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, - High flow bypass system, -Maintenance access, ~~- -~ ~~ ~~ ``.l~ecot'~ed drainage easement and public right of way (ROV1~, ~ ._., . - Overflow device, and -Boundaries of drainage easement. ,.~9' u ~ (~'~~ 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing; -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, -Forebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf, and -Filter strip. :-~~~! ~..-. ~`'`~~ 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, -Pretreatment and treatment areas, and -Inlet and outlet structures. ' } .~ ~ ~~` 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. y ~...a., -..,,` ~j~_~ '' g' ' 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. -~ ~-'~ 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. ~. ? 8. The supporting calculations. ' •~ ~_ ~ ~ ~ 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. . _ •~' 10. A copy of the deed restriction. Form SW401-Wet Detention Basin-Rev.1 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) ~ OF W A T~9 ~ ~ } ~ NCDENR y ~` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area ~ ftZ Impervious area ~ -"' '- 7 y " ftZ impervious ~ p Design rainfall depth I in Storage Volume: Non-SR Waters Minimum volume required •~ ~~ ft3 Volume provided ft3 Storage Volume: SR Waters /, ~ ; :k 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff _ __ _ °3 Post-development 1-yr, 24-hr runoff _ ___ft3 Minimum volume required _ _ ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? (Y or N) ~ ^ 1-yr, 24-hr rainfall depth in ~ Rational C, pre-development (unitless) Rational C, post-development ___.__(unitless) Rainfall intensity:1-yr, 24-hr storm inlhr Pre-development 1-yr, 24-hr peak flow - ft3/sec Post-development 1-yr, 24-hr peak flow ft3lsec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Basin Elevations Basin bottom elevation ~ 1 ? ~ • ft Sediment cleanout elevation ft Bottom of shelf elevation ft Permanent pool elevation '.. t ?' . _: ft Top of shelf elevation ~ ~, '. , ' ft Temporary pool elevation ft Volume and Surface Area Calculations SAIDA ratio , , (unitless) Surface area at the bottom of shelf J i ter.' ftZ Volume at the bottom of shelf ! =1 ft3 Permanent pool, surface area required ftZ Permanent pool, surface area provided ftZ Permanent pool volume - ft3 Average depth for SAIDA tables __~ ft Surface area at the to of shelf P I Z ) _____ ft Volume at the top of shelf ft3 Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) III DESIGN INFORMATION I Forebay volume ft3 Forebay % of permanent pool volume /S Temporary pool, surface area provided `r ft2 Drawdown Calculations ~, Treatment volume drawdown time days Treatment volume discharge rate ~ ft31s Pre-development 1-yr, 24-hr discharge - ft31s Post-development 1-yr, 24-hr discharge ft3/s Additional Information Diameter of orifice in Design TSS removal Basin side slopes :1 Vegetated shelf slope ~~ ~ 1 Vegetated shelf width ft Length of flowpath to width ratio ~ ~ 1 Length to width ratio `~~ .= :1 Trash rack for overflow & orifice? ~ (Y or N) Freeboard provided ~ ft Vegetated filter provided? (Y or N) Recorded drainage easement provided? (Y or N) C ~~ ra r''ti °- ~: ~ } Capures all runoff at ultimate build-out? { (Y or N) Drain mechanism for maintenance or emergencies Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 CAVANAUGH _~YK ~j 99 ~' . 3 7 ~~( //~``~~Mi i i i i ~~~\ \\~. 53^ NORTH TRADE STREET, SL11TE 30Z• WINSTON-SALEM, NORTH CAROLINA 271 C1 • 336.759.9^C1 • 336.759.1 OOS WWW.CAVANAIJGHSCLLITIaNS.COM S-To~~v~l ~T~.2 `~A~~1 N ~ES~C N '~'SZdV 4 D t=, g5°/o 7SS R~M~U4'~ l.. ~~°!0 4t~~~~.vtc~us st-r~ SITE ''?.'?2 Ac. A~ ~~ pERMANE~-r 'P~cs~ vE4?'H ~'AS L+= 3.3 - t ~ SA= ~3~1p~'7•'72 _ p.2~Ac= 1(7,425 t=TZ ~~~ .~ T~MPORi4Ry WAT'~~ (1jUAl..IT~ 'p(ypu VO~.u+Mtr I,tStN6 ~4kU.Et..~R's "JiMPLE ME.TKO~" ~v = ('. ('~S 'ka.C~U~ 'T ~ = perceN? lM'Pt°_.~~ItOus = ~Q~/o RY lJ l9 VDU.~iMG ~ (,~E516N ''1-P.1N4a~~ (R•t~ (P~P~1N'aCoi: PcC2~W~ ~( = ~in x .~31~ x `/~2 ~r'C~tU X`1.72. Ac = 2~4,1(~D ~T' ~-- Cat - oci - O8 Cc-tC~-K- AC:PT4-t = Z~tOC'? FTC - Z'~FT In~f2S t=r2 PERMANENT WET DETENTION POND DESIGN - RISER/BARREL Revised 109-2008 WILKES COUNTY PROJECT: Ira Myers INDEX NO: 11,07.067 CHECKED BY: LOCATION: NC 16 & NC 18 IN WILKES COUNTY DATE: January 09,2008 REVISED: TOTAI SITE AREA = PROPOSED BUILT UPON AREA = FUTURE BUILT UPON AREA = TOTAL ON-SITE BUILT UPON AREA = PERCENT BUILT-UPON = ON-SITE DRAINAGE AREA TO POND = ON-SITE BUA TO POND = )NSITE %BUA FOR POND SUB-BASIN = OFF-SITE DRAINAGE AREA TO POND = TOTAL WATERSHED AREA TO POND = bISTURBED AREA = WATERSHED =Yadkin River CLASSIFICATION : WS - C (GWAIWCA} = GWA 7.72 6.95 0.00 6.95 90.03% 7.50 6.95 92.67% 0,00 MAX. OFF-SITE B.U.% = 25% 7.50 7.00 PERMANENT SEDIMENT STORAGE PERMANENT WATER QUALITY COMPOSITE B.U. % _ DEPTH {minimum 3 feet) SAlDA (Figure 5.6.2) TEMPORARY WATER QUALITY PRINCIPAL SPILLWAY TYPE DESIGN STORM RAINFALL INTENSITY RUNOFF COEFFICIENT EMERGENCY SPILLWAY TYPE DESIGN STORM RAINFALL INTENSITY RUNOFF COEFFICIENT POND DATA ELEV. @ BOT. OF POND = 1125.5 ELEV.@ BOT. OF PSS = 1125.5 ELEV. @ BOT. OF PWQ = 1127 ELEV. (aZ NORMAL POOL = 1131 ELEV. @ TOP. OF RISER = 1133 ELEV. @ EMER, SPILLWAY = 1133.5 ELEV, @ TOP OF DAM = 1134.5 INVERT OF BARREL = 1125,5 0.5 acre-inch per disturbed acre 0.125 acre-In per total drainage area 92.67 percent 6.0 feet 3.1 percent 1.O rainfall to be controlled corrugated aluminum X reinforced concrete 10 year 5.46 inches per hour 0.9 X grass lined rip-rap lined 100 year 7.32 inches per hour 0.9 SURFACE AREA = 260D SURFACE AREA = 2600 SURFACE AREA = 3614 SURFACE AREA = 10455 SURFACE AREA = 14240 (ELEV. @ BOT. OF POND= 1125.50 SURFACE AREA = 2600 ELEV. @ NORMAL POOL = 1131.00 SURFACE AREA = 10455 ALLOW 75% OF BASIN VOLUME TO WQ ORIFICE _ ELEV. @ BOT. OF PSS = 1125.50 SURFACE AREA = 26D0 ELEV. @ BOT. OF PWQ = 1127.00 SURFACE AREA = 3614 VOLUME PROVIDED = 'ERNiANENT WATER QUALITY SURFACE AREA REVD 1012! NORMAL POOL ELEVATION = 1131.0 SURFACE AREA PROVIDED = 1045 Ol REQUIRED Rv= 0.884 VOLUME REQUIRED = 24067 ELEV. @ BOT. OF 7W0 = 1131.00 SURFACE AREA = 10455 ELEV. @ TOP OF TWQ = 1133.00 SURFACE AREA = 14240 VOLUME PROVIDED = DESIGN STORM PEAK FLOW = HEAD ABOVE TOP OF R1SER = ELEVATION AT TOP OF RISER = `'D'tl 0.50 1133,00 BARREL: BARREL SIZE USED (in) = 15.00 ELEVATION AT TOP OF RISER = 1133.00 ELEVATION OF BARREL INVERT = 1125.5 RISER: RiSER(AREA) =1.5 TIMES AREA OF. 15.00 MIN. RISER DIA. = 18.37 RISER DIA,USED = 48 VATER QUALITY RELEASE HOLE ELEV, @ BOT. Of WATER QUALITY RELEASE HOLE = 1131.Oi flAXIMUM RELEASE RATE _ ' AINIMUM RELEASE RATE _ AAXIMUM HOLE SIZE = 0.03554112 2.5 AINIMUM HOLE SIZE = 0.014216448 1.6 !, @ TOP OF RISER = 1133.00 !, (m' BOT. OF PSS = 1125.50 50 7 H = , AREA OF R1SER = 12.6 VOLUME OF RISER = 94'2 AREA OF BARREL = 1.2 EXPOSED LENGTH 10.00 VOLUME OF BARREL = 12.3 WEIGHT OF WATER DISPLACED = 6646.82 FACTOR OF SAFETY (10%) 7311,51 OLUME OF CONCRETE ANCHOR = 83'6 Table of Contents Hydraflow Nydrographs by Intelisolve Ira Myers FiNAl.gpw Friday, Jan 11 2008, 10:10 AM Hydrograph Return Period Recap ...................................................................... 1 10 -Year . 2 Summary Report ................................. .............................................. ................................. 3 ............................................... orts h R .................................. .......................... ep Hydrograp 3 ................... stormwater voir 2 R .................................. ................... , eser , Hydrograph No. 4 .......................... rt . ................................... . .................................................. Pond Repo 100 -Year 5 ............................. ................................... Summary Report ....... .. 6 orts ........................................ h R d ................................. ep rograp Hy 6 Hydrograph No. 2, Reservoir, stormwater ..................................... ................................... ......................... t ................................... 7 ..................................................... Pond Repor nywauvw nyu~~yiaN~~~ ~r ......~...... Hydrograph Return Period Recap nyu~ai wrr ~ ~r~~~y.aN..~.,~ .............._ Hydrograph Summary Report 3 I Hydrograph Plot Hydraflow Hydrographs by Intellsolve Friday, Jan 11 2008, 10:10 AM Hyd. No. 2 starmwater Hydrograph type =Reservoir Peak discharge = 0.14 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. Na. = 1 Max. Elevation = 1132.84 ft Reservoir name =detention Max. Storage = 23,059 cult Storage Indication method used.' Q {cfs) 40.00 30.00 20.00 10.00 0 00 Hydrograph Volume = 17,819 cult stormwater Flyd. No, 2 --10 Yr A I_~ _ ~-i_ i _TI i Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs} Hyd No. 2 Hyd No. 1 Pond Report Hydraffow Hydrographs by lntelisolve Friday, Jan 11 2008, 10:10 AM Pend No. 1 -detention Pond Data Pond storage is based on known contour areas. Av erage end area me#hod used. Stage !Storage Table Stage (ft) Elevation (ft} Contour area (sgft} Incr. Storage {tuft) Total storage (cult) 0.00 1131.00 00 1132.00 1 10,455 12,825 0 0 11,640 11,640 . 00 1133.00 2 14,241 13,533 25,173 . 00 1134,00 3 15,729 14,985 40,158 . 3,50 1134.50 16,500 6,057 46,215 Culvert /Orifice Structures Weir Structures CA] [B] [C] [D] [A] [B] [Cl ID] Rise {in) = 15.00 2.00 0,40 0.00 Crest Len {ft) = 4.00 10.00 0.00 0.00 Span {in) = 15.00 2.00 0,00 0.00 Crest EI. {ft) = 1133.00 1133.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. {ft) = 1127.00 1131 .00 0.00 0.00 Weir Type =Riser Rect --- •-- Length (ft) = 10.00 0.00 0,00 0.00 Multi-Stage =Yes No No No Slope (%) = 0.30 0.00 0,00 0.00 N-Value = .013 .013 .000 .000 O 'f C ff = 0 60 0 60 0.00 0.00 rl . oe . Multi-Stage = nla Yes No No Exfiitration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft iJola: CulvarUOrifice outRows have bean analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.40 0.00 0.00 5.00 Total Q Stage !Discharge Stage (ft) 4.00 3.00 2.00 1.00 0,00 10.00 15.60 20.00 25.00 30.00 35.00 au.uu 4a,uu vu.vb Discharge (cfs) 4 Hydrograph Summary Report Hydrograph Plot Hydrafiow Hydrographs by Intelisoive Hyd. No. 2 stormwater Hydrograph type =Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 1 Reservoir name =detention Friday, Jan 11 2008, 10;10 AM Peak discharge = 3.10 cfs Time interval = 1 min Max. Elevation = 1133.36 ft Max. Storage = 30,621 cult Storage Indication method used, Hydrograph Volume = 24,512 cuff stormwater Q (cfs} Q (cfs) Hyd. No. 2 -- 100 Yr 0 60.00 50.00 40,00 30.00 20.00 10.00 0 00 50.0 50.00 40,00 30.00 2a.oo 10.00 0,00 6 I 0 5 10 15 19 24 29 34 39 44 4t5 Time (hrs} Hyd No. 2 Hyd No. 1 Pond Report Hydraflow Hydrographs by Intefisolve Friday, Jan 11 2008, 10;10 AM Pond No. 1 -detention Pond Data Pond storage is based an known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft} Elevation (ft) Contour area (sgft} Incr. Storage (tuft) Total storage {tuft) 0,00 1131.00 00 1132.00 1 10,455 12,825 0 11,640 0 11,640 . 00 1133.00 2 14,241 13,533 25,173 , 00 1134.00 3 15,728 14,985 40,158 . 3.50 1134.50 16,500 8,057 48,215 Culvert 1 Orifice Structures CA] [g] [~] CDl Rise (in) = 15.00 2.00 0.00 O,DO Span {in) = 15.00 2.00 0.00 0,00 No. Barrels = 1 1 0 0 invert EI. {ft) = 1127.00 1131.00 0.00 0.00 Length (ft) = 10.00 0.00 0.00 0.00 Slope (%) = 0.30 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Weir Structures [Al [Bl IC] [D] Crest Len (ft) = 4.00 10.00 0.00 0.00 Crest EI. (ft) = 1133.00 1133.50 0.00 0,00 We[r Coeff. = 3.33 3.33 0.00 0.00 Weir Type =Riser Rect --- --- Multi-Stage =Yes No No No Exfiltratlon = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: CulverUOrifice outflows have baen analyzed under inlet and oupet control. Stage (ft) 4,00 3.00 2;aD 1.00 0.00 0.00 5.00 Total Q Stage t Discharge SEage (ft) 4.00 3.00 2A0 1.00 O.OD 10.00 15.00 20.00 25.00 30.00 35.00 40,00 45.uu nu.u0 Discharge {cfs) 7 Notes: For Multipie Culverts use 1.25 times diameter of pipe For Outlets on slopes greater Phan 10% use next higher equation number If "Special" appreas in the results box, another method should be used for design NC DOT Rip-Rap sizes used (T=1.5*Dmax} Appendices N]GW YORK DOT DTSSIPATOR METHOD rOR USE I]V DEI:INED CI{ANNELS (Sotu'ce: "Bank and channel lining procedures", New Yoffie Department of Transportation, Division aF Design and Construction, 1971.) Note: To use the fol3owing chart you must lenow: (1) Q full capacity (2) Qto (3} V full (4) Vta where Q =discharge in cfs and V =Velocity in FPS. F,STIMATIU]V OF STONE SIZE ANA DIMENSIONS FUR CULVERT APRONS Step 1) Compute Flow velocity Vo at culvert or paved channel outlet. Step 2) Far pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do--Ao, where A.~ cross-sectional area of flow at outlet. For multiple cu]verts, use Do=1,2.5xDo of single culvert. Step 3) Far apron grades of lt7% or steeper, use recommendations For next higher•zone, (Zones 1 through C}. 25 20 N 1E a ~_ U O ~~ 0' S' 10' i r ~„ DIAMETER (Ft.) Figure 8.UGb.1 r i 8.Ob.5 t'Lcv. 123 0 APRON MATERIAL rHOr~cr cuvaRr ro rpEVertr scoUR HOLE USE l2 ALWAYS ~j Lz 3TONE FILLING (F{NE} CL A 3 x Do 4 x Da STONE FILLING (LIGHT) CL. B 3 X Do B X Do f STONE FILLING (MEDIUM) CL.1 4 x Do 8 x Do STONE F1t.LlNG (HEAVY) CL,1 4 x Do 0 x Do STONE. FILLING (HEAVYI CL 2 5 x Do 10 x Do S70NE FILLING (HEAVYI CL, 2 6 x Do 10 x Do R+aY DISSIPATpRS, S7lLLING ~O E I L LA O NE). S IZ FIGER S Ra~IN o R Fig. 8.06.b,2 Width = 3 timrs pipe dia. (tninJ DE'1'ERMINATIDN OF STONE SIXES FOR DUMPEII STOKE CKANNEL LININGS 'AND REVETMENTS Step 1) tlse figure 8.U6.b.3 to determine maximum stone size (e.g. for 12 Fps=20" or SSO lbs. Step 2) Use figure 8.06.b.4 to determine acceptable size rflnge for stone (for 12 FPS it is 125-5001bs, for 75% of stone, and the maximum and minimum range in weight should be 25-5001bs,) Nate: In determining channel velocities for stone Linings and revetment, use the following coefficients of roughness: Diarrteter Mannin's M~• thiclQ-ess (inches} "n" of lining (inches Fine ~ 3 0,031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 ~' Heavy 23 0.044 30 36 (Channels) (L3issapatara) s.a6.6 Rev. 1?/93 ___ . _. ~.,.~.pm. _ _- _ _ _ . -..._ - -. _. __ _ _ CaMbr Fae1e+4~iYY mr 1n W ®` 1 ~ ~ '.{~, \. bl F .., H5/.9