Loading...
HomeMy WebLinkAbout20140762 Ver 1_Sediment July 28_20160804Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915 ABD) County: Watauga Location: NCDOT- US 221 (R-2915 ABD) Latitude: +35° 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 7/28/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Version: 1 Status: Issued Project Type: Road/Highway Widening Region: Central Title: Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 EC were overwhelmed and small amounts of sediment were lost. EC measures were being repaired where necessary. D-Section. page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 7/28/2016 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Unpermittabie Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surFace waters on the site free of illegal discharges? Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ � ❑ ❑ ❑ Comment: There were several areas where small amounts of sediment were lost all of which were less than a 5 gallon buckets worth. EC measures were in place but overwhelmed from runoff generated by intense pop-up thunderstorms. Staff were in the process of repairing measures. This occurred in the D section. page: 2