Loading...
HomeMy WebLinkAbout20160653 Ver 1_Approval Letter_20160802NC WaterResaarces ENVIRONMENTAL QUALITY USDA Forest Service Mr. Huston A. Nicholas 160 Micoa St., Suite A Asheville, NC 28801 PAT MCCRORY I't co-o. L. -OA DONALD R. VAN DER VAART August 2, 2016 S. JAY ZIMMERMAN D1,V ... DWR# 16-0653 Graham County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Santeetlah Creek Barrier Removal Project Dear Mr. Nicholas: You have our approval for the impacts listed below for the purpose described in your application dated June 27, 2016, and received by the Division of Water Resources (Division) on June 30, 2016. These impacts are covered by the attached Water Quality General Certification Number 3885 and the additional conditions listed below. This certification is associated with the use of Nationwide Permit Number 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [I 5A NCAC 02H .0506(b) and/or (c)] SLTAOMTh Carolina I avuOn Ae Qa 1ityl Water1< ALTAs 20YOU.S. Hn.70I Sam %N,MCamlam28778 8282964500 Santeetlah Creek Barrier Removal Project DWR# 16-0653 401 Approval Page 2 of 3 Type of Impact Amount Approved (units) permanent Amount Approved (units) Temporary Stream Impact Impact Sl 50 linear feet Impact S2 60 linear feet 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you most notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation may require future repairs or replacement, which requires coordination with the Asheville Regional Office to ensure the stability and water quality of the stream and downstream waters. [15A NCAC 02H .0506(b)(2) and (b)(3)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable GAD filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable CAD filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: Ifsending via US Postal Service. Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Sarteetlah Creek Barrier Removal Project DW RN 16-0653 4D1 Approval Page 3 of 3 Ifsending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H.0500. Please contact Tim Fox at 828-296-4664 or tim.fox@ncdenr.sov if you have any questions or concerns. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3885 Certificate of Completion cc: Brady Dodd — USDA Forest Service, Hydrologist (via email) David Brown — USACE Asheville Regulatory Field Office (via email) Andrea Leslie — NC WRC (via email) Stan Aiken — Division of Energy, Mineral, and Land Resources (via email) D WR ARO 401 files DWR 401 and Buffer Permitting Unit (via email) G:\WR\WQ\0.h.WOvWoe-rXvR3amwIah Creek Barrier RemovMjectWPRVL.401Saetee0ehCreek)3vi,Remov ,l jest 8-2-2016 docz -