March 10, 2008
Bristolmoor, LLC
Attn: Kenneth F. Fisher
PO Box 336
Winterville, NC
Coleen H. Sullins, Director
Division of Water Quality
Chuck Wakild, P.E., Deputy Director
Division of Water Quality
DWQ Project # 07-1042 vs 3
Pitt County
Subject Property: Arden Ridge Section 4
Tar-Pamlico Basin, Phillippi Branch, 030305, 28-98.6, NSW, C
Approval of 401 Water Quality Certification and Authorization Certificate per the Tar-Pamlico
River Buffer Protection Rules (15A NCAC 2B .0259) with Additional Conditions
Dear Mr. Fisher:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.188 acres of wetlands, 83 feet of streams and 7231 square feet (ftZ) of
protected riparian buffers for the purpose of a residential subdivision road crossing at the subject property,
as described within your application dated December 14, 2007 and received by the N.C. Division of
Water Quality (DWQ) on December 27, 2007. After reviewing your application, we have decided that
the impacts are covered by General Water Quality Certification Number(s) 3704 (GC3704). The
Certification(s) allows you to use Nationwide Permit(s) 14 when issued by the US Army Corps of
Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to
the protected riparian buffers per 15A NCAC 2B .0259. In addition, you should obtain or otherwise
comply with any other required federal, state or local permits before you go ahead with your project
including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404 or LAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions
of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidental impacts:
North Cazolina Division of Water Quality Internet: h2o.enr.state.nc.us
943 Washington Square Mall Phone: 252-946-6481 One
Washington, NC 27889 FAX 252-946-9215 NorthCarolina
An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper ~atura!!t~
Bristohnoor:
Page 2 of 4
Amount A roved Units Plan Location or Reference
Stream 83 (feet Plat rovided with a lication
404/CAMA Wetlands 0.188 acres Plat rovided with a lication
Waters na acres na
Buffers 7231 s uare ft.) Plat rovided with a lication
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-Construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
6. Diffuse Flow (No Review)
Bristolmoor:
Page 3 of 4
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at
non-erosive velocities through the protected stream buffers such that it will not re-concentrate before
discharging into a stream as identified within 15A NCAC 2B .0259 (5). If this is not possible, it may
be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require
additional approval from this Office.
7. Written Stormwater Management Plan (Final Plan Needed)
A final, written stormwater management plan (including a signed and notarized Operation and
Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321
Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401 Water
Quality Certification. The stormwater management plans shall be approved in writing by this Office
before the impacts specified in this Certification occur per Condition No. 12 in GC No. 3704. You
have the option of using the Express Review Program for expedited approval of these plans. If you
propose to use the Express Review Program, remember to include the appropriate fee with the plan.
The stormwater management plan must include plans, specifications, and worksheets for stormwater
management facilities that are appropriate for the surface water classification and designed to remove
at least 85% TSS according to the most recent version of the NC DENR Stormwater Best
Management Practices Manual. These facilities must be designed to treat the runoff from the entire
project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any
permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be
constructed and operational, and the stormwater management plan (as approved by this Office) shall.
be implemented. The structural stormwater practices as approved by this Office as well as drainage
patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be
made without written authorization from the Division of Water Quality.
The above condition shall apply unless it is demonstrated in writing to the satisfaction of this Office
that the impervious area of the entire, built-out project shall be less than 30% and that there are no
pockets ofhigh-density development with concentrated impervious area over 30% area within the
project such as, but not limited to, commercial areas, multi-family, clubhouses, maintenance areas,
etc.
8. No Impacts Beyond those in Application
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Bristolmoor:
Page 4 of 4
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Tar-Pamlico riparian buffer protection rule as described within 15A NCAC 2B .0259. If you
have any questions, please telephone Kyle Barnes of the Washington Regional Office at 252-948-3917 or
Ian McMillan of the 401 Oversight/Express Unit at 919-715-4631.
Sincerely,
V
'~
L..
r ®~
Al Hodge/Supervisor
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: Certificate of Completion
GC 3704
cc: Corps of Engineers Washington Field Office
DWQ 401 OversightlExpress Unit
DLR, WaRO
File copy
Central Files
File: 07-1042 vs 3