HomeMy WebLinkAbout20071194 Ver 2_Triage Check List_20080312Triage Check List
Date: ~ 2 DV Project Name: ~''~~°~~liU"~ CC` ~~"8' ~G \
nwQ#: D - ~~
County: ~ctC~Vl,
To: ARO Kevin Barnett
FRO Ken Averitte
^ MRO Alan Johnson
^ RRO Lauren Witherspoon
O I
From: U,
^ WaRO Kyle Barnes
^ WiRO Joanne Steenhuis/Chad Coburn
^ WSRO Sue Homewood
.,
Telephone : (919) ~~ ~ ~ V
The file attached is being forwarded to your for you lu o
Please call if ou need assistance. ~ 1
Y
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters onUSFW topo maps
^ Minimization avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments: