Loading...
HomeMy WebLinkAbout20080385 Ver 1_Triage Check List_20080312Triage Check List Date: 3'z' Project Name: ~~Y4 ~~ nwQ#: ~~ FILE ~~~~ ~ouo~: ~~~ To: ARO Kevin Barnett FRO Ken Averitte MRO Alan Johnson ^ RRO Lauren Witherspoon From: o~ ~ ^ WaRO Kyle Barnes ^ WiRO Joanne Steenhuis/Chad Coburn ^ WSRO Sue Homewood Telephone : (919) ~`/ `1 The fle attached is being forwarded to your for your evaluation. Please call if you need assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy ^ Is the application consistent with pre-application meetings? ^ Cumulative impact concern Comments: