HomeMy WebLinkAbout20141129 Ver 2_More Info Requested_20160729Strickland, Bev From: Price, Zan (George) Sent: Friday, July 29, 2016 11:00 AM To: 'David Earley' Cc: 'Kyle Johnson'; 'Andy Southards'; 'rconnor@sitedevelopmentcorp.com'; 'Jeremy Boger'; 'Doug Sharp'; 'Jennifer Robertson'; William.A.Elliott@usace.army.mil; Leslie, Andrea J Subject: Creekside Inspection - 7/18/2016 - Turbidity in Creek & 401 Application - DWR 2014-1129 V2 All, The 401 application (DWR 2014-1129 V2) will be placed on hold until the turbidity issue and stream assessment requested on July 18, 2016 is resolved. Please provide an update by Friday, August 5, 2016. Contact me if you have any questions. Zan Price, P.E. Assistant Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4662 office 828 231 9634 mobile zan.Price(d)ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 -5:�'-^Nothlnq Compares --N.,. Sim Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Price, Zan (George) Sent: Monday, July 18, 2016 5:13 PM To: 'David Earley' <dearley@sundogplaces.com> Cc: Kyle Johnson <kjohnson@sitedevelopmentcorp.com>; Andy Southards <asouthards@sitedevelopmentcorp.com>; rconnor@sitedevelopmentcorp.com; Jeremy Boger <jboger@cdcgo.com>; 'Doug Sharp' <Doug.Sharp@buncombecounty.org>;'Jennifer Robertson' <jrobertson@atlasenvi.com> Subject: Creekside Inspection - 7/18/2016 - Turbidity in Creek All, I inspected the site this afternoon. I took a sample at the new pond outfall for turbidity and observed turbid water from the pond outlet to the confluence with Reems Creek. Please update your construction plans ASAP to mitigate the discharge of turbid water to the creek. Please assess the stream within the next 10 days for additional sedimentation to the creek. Submit the results of your assessment to me. Contact me if you have any questions or concerns. Regards, Zan Price, P.E. Assistant Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4662 office 828 231 9634 mobile zan.price(d)ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 -��Nothmg Compares] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Price, Zan (George) Sent: Wednesday, May 25, 2016 5:10 PM To: Jason Pass <jpass@cdcgo.com> Cc: David Earley <dearlev@sundogplaces.com>; Kyle Johnson<kiohnson@sitedevelopmentcorp.com>; Andy Southards <asouthards@sitedevelopmentcorp.com>; rconnor@sitedevelopmentcorp.com; Jeremy Boger <jboger@cdcgo.com>; Warren Sugg <wsugg@cdcgo.com> Subject: Re: Creekside Dam Relocation Meeting https://ncdenr.s3.amazonaws.com/s3fs- public/Water%20Quality/ATU%2ODocuments/Approved%20PAMS Flocculants/Approved FlocculantsList 01 2014.pdf Sent from my iPhone On May 25, 2016, at 4:53 PM, Jason Pass <jpass@cdcgo.com> wrote: Zan, As a follow up to our meeting Monday May 23rd; I have summarized Site Development Corporations (SDC) plans to protect the stream onsite while dewatering and other construction activity's take place. We all understand that the ultimate goal of the meeting and this process is to ensure that no silt is deposited in the stream. Method and protection measures: • SDC will drain the pond through the adjacent Temporary Sediment Basin (TSB) • SDC will pump water from the surface of the pond and onto a matted and rip -rap dispersion pad in the TSB to allow pond water to gravity drain though the skimmer in the TSB and out to the creek. • Pumping activities will be put on hold prior to significant forecast rain events to allow the TSB to function as designed. • A minimal flow will be kept in the creek to ensure it does not dry out completely. • Polyacrylamide flocculants will be used if the pond water becomes too turbid while draining activities are ongoing. (Zan to email list of approved products.) • Dam relocation and sanitary sewer installation will occur at the same time, and will be stabilized as soon as the work is complete. • The rip rap spillway will be relocated as necessary during these construction activities to allow for both ongoing construction activities and dewatering as necessary. • The outfall of the new pond drain will be installed in the same location as the existing pipe, but the invert will be installed to match the existing stream elevation. • CDC will be onsite during these activities periodically to observe and work with contractor to ensure all the above measures are being implemented. • SDC plans to keep a log of activities onsite. • Atlas Environmental, Inc. will observe sedimentation in the creek prior to the work and after work is finished verify that the dewatering activities did not impact the stream. Please add to or comment on anything I have miscommunicated or omitted from our meeting onsite. We look forward to working with everyone involved to make this portion of the project run as smoothly as possible. Thank you for your help, Jason Pass Civil Design Concepts, P.A. Office (828) 252-5388 Office locations: 168 Patton Avenue Asheville, NC 28801 Mailing address: P.O. Box 5432 Asheville, NC 28813 www.civildesignconcepts.com <i mage003. png> Cell (828) 216- 9959 52 Walnut Street — Suite 9 Waynesville, NC 28786 Privileged and Confidential: The information contained in this email message and any attachments is confidential information intended onlyfor the use of individuals or entities named above. If the reader of this message is not the intended recipient you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this email in error, please notify us immediately by email at the originating address.