Loading...
HomeMy WebLinkAbout20111044 Ver 2_Mitigation AsBuilt_20160728� a� � o n� vc � °' c a� �w'L :, O �`Jv� � � � M � � V � 0 � � � � BEGIN TIP PRG -L- STA. 20 + 07.40 � V � � O V BEGIN CON3TRUCTION -L- STA,22+00.00 NCDOT CONTACT: BRENDA L. MOORE, P,E. ROADWAY DESIGN — ENGINEERING COORDINATION ������ �� ������ ��������� �������1�T �I�` I�I��l�I���� IREDELL . CQ �I.1�7�Y LOCATION,� I-40/I-77 IIVTERCHANGE ZNCLUDI11tG I-40 FROM WEST OF SR 2003 (Radio Rd.) TO WEST OF SR 2158 (Old Mocksville Rd.) f�' I-77 FROM SOUTH OF I-40 TO SOUTH UF SR 2171 (Jane Soz.ver Rd.) TYPE OF WORK GRADI11lG, DRAINAGE, PAVING, ITS, SIGNALS, STRUCTURES, CULVERTS, RETAl1YI11iG WALLS, AND 1KOISE WALLS � � SR 2174 W � 1� � CRAWFORD RD, �� eM BEGiN BRiDGE � US 6aE �,v�� � �� ' -L- STA 90+g1.50 DA� L+ J ti W^ CREEr � � S�s� �S�I�MONTON Q THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES GRAPHIC SCALES DESIGN 4DATA 1_77 PROJECT LENGTH ADT 2010 = 71,100 73,200 50 25 Q 50 too ADT 2030 = 99,420 109,040 LENGTH ROADWAY TIP PROJECT I-3819A = 3.260 PLANS DHV = 10 % 9°k LENGTH STRUCTURES TIP PROJECT I-3819A = 0.100 D = 60 °k 55 % 50 25 Q 50 1Q0 T= 19 %` 20 %** TOTAL LENGTH OF TIP PROJECT I-3819A = 3.360 PROPILE (HORIZONTAL) V= 60 MPH 60 MPH " TTST 14 + QUAL 5 (I-40J ti0 �5 Q 10 ?0 MM TTST 15 + DUAL 5(I-77) STATEWIDE TIER PROFILE IVERTICAL) CLASSIFICATION; INTERSTATE BEQIN CONSTRUCTION -Y- STA.122+11.65 Florence G Hutcheson _ . .. .. .........._ Corc�u�ri�c 8rcctv[:a� ��v�_,..�..�;�W.,,�r� ��,W � «�� Y011 STANDARD SPSCIFICATION3 RIGHT OF WAY DATE: DAVID C, WALLER. P.E. DECEMBER 19, 2008 PRQJ6CT BNGJN9SR LETTING DATE: BRIAN A, WILES, P.E. MARCH 20, 2012 I'ROJ6CT DESIGN &YGI.V88R �.=e �,� ,s..,� � I-3 819A ..ti.��.r� �``� gp�EA1 TO WINSTON' -L- STA.197 + 50.00 HYDRAULICS ENGINEER ROADWAY DBSIGN ENGINEER P.S. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA oE boa ,y aes� c��a . , s o s �' s 0 .s� � �r °F TR�bgQ� PLANTING DETAILS LIVE STAI�S PLANTING DETAIL LIVE STAKE SOUARE CUT � � BUDS IFACING UPWARD) —� LIVE CUTTING 11/2'-2' DIAIAETER) 2 - 3 Feet ANGLE CUT 30'-45' � \ E%ISTING/PROPOSED STREAMBED BANK $TABILIZATION WITN LIVE $TAKE$ NOTE: LIVE STAKES SHALL BE SPACED APPROXIAIATELY 4 FEET ON CENTER LIVE STAKE$ $HALL BE DRIVEN UNTIL APPftO%IAIATELY �'4 OF LIVE STAKE IS WITHIN CROl1ND 0 ED BAREROOT PLANTING DETAIL DIBBLE PLANTING METHOD USI�VG THE KBC PLANTI�iG BAR , 2, Remme ylenting bar and ylace eeedl3na et earreec depdi. PLANTING NOTES: PLA.\"fING SAG During planting, eeedlinps ehell be keDt in e moiet camge beg or eim3ler eonteiner ro pre�ent the root ryeteroe from dry9ng� KBC PIA.\TLYG H.�R Plandng bar ehsll hsre a blede with a triangular croee eeadon, and ahell ba 12 inohae ]ong, 4 inchee wide and 1 inoh chiok at center� ROOT PRIPIING All seedlinge ehell be �ooc pruned, if neaeeaery, eo that no roote extend more than 10 inehee below the raot callar� � 2 inon 3. Ineer[ planting bar 2 inohea tmverd planter from teedlinq� t: 'IIPi��11F l= i u- r�::n=n'�n u= =��m�-n�u- Illl �� 't— II ,��= uu--�u��--�u��u =n-u.. n��ii-u..'n ❑ TYPE 1 STREAD4BANK REFORESTATION SHALL BE PLANTED 3 F'T, TO 5 FT, ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER, APPROXIMATELY 2724 PLANTS PER ACRE. ❑ TYPE 2 STREA��IBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTEit, RANDOM SPACING, AVERAGING 8 F I`. ON CENTER, APPROXIibIATELY 680 PLAi\'TS PER ACRE. ❑ NOTE: TYPE 1 AND TYf'E 2 STREA1biBANK REFORESTATION SHALL BE PAID FOR AS "9TREAd4BANK REFORESTATION" STRE�MBANK REFORESTATION TYPICAL EFERENCE NO. SHEET NO. • 38l9A RF-2 M4 SHEET NO. DESIGN XYDP.4ULIC5 :ER ENGINEE0. STREAA4BANK REFORESTATION DSDiTTURE,1'YPE, SIZE, AND FURNISH 9HALL CONFOR�tii TO Ti� FOLLOVVI�i'G� TYPE 1 50% CEPHALANTHUS OCCIDENTALIS BUTTONBUSH 2 ft - 3 ft LIVE STAI�9 50% COR�WS Ai�I01�IUi11 TYPE 2 2596 LIRIODENDRON TULIPIFERA 25% PLATANUS OCCIDENTALIS 25% QUERCUB RUBRA 25% QUERCUS ALBA SILKY DOGWOOD 2 ft - 3 ft LNE STAI�S I YELLOW POPLAR 12 in - 18 in BR Ai�TERICAN SY('�AMORE 12 in - 18 in BR NORTHERt\' RED OAK 12 in - 18 in BR WHITE OAK 12 in - 18 in BR ❑ SEE PLAN SHEETS FOR AREAS TO BE PLANTED AS-BUILT STREAMBANK REFORESTATION DETAIL SHEET 1 OF 2 N.C.D.O.T.- ItOADSIDE ENV[RONMENTAL UNCC