Loading...
HomeMy WebLinkAbout20080208 Ver 1_Triage Comments_20080306DVdQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder . Triage Comment Sheet Date: ~ ~~~ Date: Date: Issue Project (Reviewer 1) ^ Issue Project (Reviewer 2) ~ Issue with conditions (Reviewer 1) ~ More Information (R.eviewer 1) ^ Return Application (R.eviewer 1) Send to Regions ~Revx~wer 1) ~ More Information (Reviewer 2) ^ Return Applidation (Reviewer 2) ~ Send to Regions (Reviewer 2) S:\Triage Eonns\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 08-0208 Pace Tract AML Comments March 6, 2008 Please provide the following items as called for on the Required Items Checklists for the Level Spreaders: a. The calculations of t~ and I for each level spreader. b. The boundaries of the drainage easements for the level spreaders. c. A depiction of the entire drainage area for each level spreader. d. A final (not preliminary) site plan. Please address the following issues on Sheet 5 of 6: a. The roadway drainage system must be shown. b. Proposed topo lines (with roadway fill) must be shown. c. Re-orient plan so that it is consistent with Sheet 7 of 8. d. The rip rap apron appears to be oversized. e. Level spreader number 1 must be relocated so that it is not upslope of the rip rap apron. £ Level spreader number 2 is directing stormwater toward the fill slope associated with Street "A." Please relocate this level spreader to a more appropriate location. Please address the following issue on Sheet 7 of 8: The construction sequence does not mention level spreaders. 4. Please address the following issue on Sheet 8 of 8: The level spreader detail shows a bypass channel even though it is not proposed to be included in the design.