HomeMy WebLinkAbout20051711 Ver 1_Stormwater Plans_20061221TAI_.~~_~ DoT & ~~RIG~-~T December 21, 2006 Ms Annette Lucas North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Oversight/Express Review Permits Division 1650 Mail Service Center Raleigh, North Carolina 27699-1650 RE: Burlington-Alamance Airport Authority Runway 6-24 Extension -Stormwater Management Plan TBI Reference No. 2101-0602 DWQ #OS-1711 Dear Ms Lucas: We have prepared supplemental data for the referenced Stormwater Management Plan, in response to your review comments of December 14, 2006. ~o sets of materials are enclosed, as follows: Revised Plan Sheet #1, with the callout for Drainage Basin #4 corrected. Swale numbers have also been added, for reference to associated worksheets. Revised specification section T-901, with added provisions regarding fertilizing. Complete set of detention basin and swale worksheets, with supporting documentation. Please let me know if you have any further questions or need any additional information to complete the review. Sincerely, ~,~`, ~ Eric . Stumph, P.E. Project Manager C: Mr. Dan Danieley (w/encl.) ENGINEERING & PLANNING CONSULTANTS WWW.TAEBER~IANDBRIGHT.COM ~,'•~", O ''-" °~. ~, ~~~ ~~ ~ ~~ ~°s ~ ~ ~~c_~ r'o 9~~r,,~- 06' //.~ ~y 4810 SHELLEY DRNE WILMINGTON. NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTI I CAROLINA CHARLO~fLE. NORTH CAROLINA RICHMOND. VIRGINIA ITEM T-901 SEEDING DESCRIPTION 901-1.1 This item shall consist of soil preparation, seedingliming and fertilizing the areas shown on the plans or as directed by the ENGINEER in accordance with these specifications. MATERIALS 901-2.1 SEED The species and application rates of grass, legume, and cover-crop seed furnished shall be those- stipulated herein. Seed shall conform to the requirements of Fed. Spec. A-A-2671. Seed shall be furnished separately or in mixtures in standard containers with the seed name, lot number, net weight, percentages of purity and of germination and hard seed, and percentage of maximum weed seed content clearly marked. for each kind of seed. The Contractor shall furnish the ENGINEER duplicate signed copies of a statement by the vendor certifying that each lot of seed has been tested by a recognized laboratory for seed testing within 6 months of date of delivery. This statement shall include: name and address of laboratory, date of test, lot number for each kind of seed, and the results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of a mixture, the proportions of each kind of seed. Seeds shall be applied as follows: Permanent Seeding Seed Maximum Seed Purity Maximum Weed Seed Minimum Rate of Application Tall Fescue 90% 2.5% 80 Ib/acre Kobe Lespedeza 90% 2.5% 40 Ib/acre Rye (Grain)' 90% 2.5% 40 Ib/acre Add Rye (Grain) only if seeding occurs prior to May 1 or after August 15. Seeding shall be performed during the period between August 25 and September 15 or February 15 and March 21 inclusive, unless otherwise approved by the ENGINEER. 2101-0602 T-901-1 Revised 72/27/2006 901-2.2 LIME. Lime shall be ground limestone containing not less than 85% of total carbonates, and shall be ground to such fineness that 90% will pass through a No. 20 mesh sieve and 50% will pass through a No. 100 mesh sieve. Coarser material will be acceptable, providing the rates of application are increased to provide not less than the minimum quantities and depth specified in the special provisions on the basis of the two sieve requirements above. Dolomitic lime or a high magnesium lime shall contain at least 10% of magnesium oxide. Lime shall be applied at the rate of 4,000 pounds per acre. All liming materials shall conform to the requirements of ASTM C 602. 901-2.3 FERTILIZER. Fertilizer shall be standard commercial fertilizers supplied separately or in mixtures containing the percentages of total nitrogen, available phosphoric acid, and water-soluble potash. They shall be applied at the rate and to the depth specified herein, and shall meet the requirements of Fed. Spec. A-A-1909 and applicable state laws. They shall be furnished in standard containers with name, weight, and guaranteed analysis of contents clearly marked thereon. No cyanamide compounds or hydrated lime shall be permitted in mixed fertilizers. The fertilizers may be supplied in one of the following forms: a. A dry, free-flowing fertilizer suitable for application by a common fertilizer spreader; b. Afinely-ground fertilizer soluble in water, suitable for application by power sprayers; or c. A granular or pellet form suitable for application by blower equipment. Fertilizers shall be 10-10-10 commercial fertilizer and shall be spread at the rate of 1,000 pounds per acre at the time of seeding operations. Following intial seeding operations, use of additional fertilizer shall be avoided so as to minimize transport of excess nutrients to Gunn Creek and its tributaries, which have been classified as nutrient sensitive waters. Any additional fertilizing shall be limited to the minimum necessary to maintain the health of the vegetation in the project grassed filter strips, swales and extended dry detention basins. 901-2.4 SOIL FOR REPAIRS. The soil for fill and topsoiling of areas to be repaired shall be at least of equal quality to that which exists in areas adjacent to the area to be repaired. The soil shall be relatively free from large stones, roots, stumps, or other materials that will interfere with subsequent sowing of seed, compacting, and establishing turf, and shall be approved by the ENGINEER before being placed. 2101-0602 T-901-2 Revised 12/21/2006 CONSTRUCTION METHODS 901-3.1 ADVANCE PREPARATION AND CLEANUP. After grading of areas has been completed and before applying fertilizer and ground limestone, areas to be seeded shall be raked or otherwise cleared of stones larger than 2 inches (50 mm) in any diameter, sticks, stumps, and other debris that might interfere with sowing of seed, growth of grasses, or subsequent maintenance of grass-covered areas. If any damage by erosion or other causes has occurred after the completion of grading and before beginning the application of fertilizer and ground limestone, the Contractor shall repair such damage. This may include filling gullies, smoothing irregularities, and repairing other incidental damage. An area to be seeded shall be considered a satisfactory seedbed without additional treatment if it has recently been thoroughly loosened and worked to a depth of not less than 5 inches (125 mm) as a result of grading operations and, if immediately prior to seeding, the top 3 inches (75 mm) of soil is loose, friable, reasonably free from large clods, rocks, large roots, or other undesirable matter, and if shaped to the required grade. However, when the area to be seeded is sparsely sodded, weedy, barren and unworked, or packed and hard, any grass and weeds shall first be cut or otherwise satisfactorily disposed of, and the soil then scarified or otherwise loosened to a depth not less than 5 inches (125 mm). Clods shall be broken and the top 3 inches (75 mm) of soil shall be worked into a satisfactory seedbed by discing, or by use of cultipackers, rollers, drags, harrows, or other appropriate means. 901-3.2 DRY APPLICATION METHOD. a. Liming. Lime shall be applied separately and prior to the application of any fertilizer or seed and only on seedbeds that have previously been prepared as described above. The lime shall then be worked into the top 3 inches (75 mm) of soil after which the seedbed shall again be properly graded and dressed to a smooth finish. b. Fertilizing. Following advance preparations and cleanup fertilizer shall be uniformly spread at the rate that will provide not less than the minimum quantity stated in paragraph 901-2.3. c. Seeding. Grass seed shall be sown at the rate specified in paragraph 901-2.1 immediately after fertilizing, and the fertilizer and seed shall be raked within the depth range stated in the special provisions. Seeds of legumes, either alone or in mixtures, shall be inoculated before mixing or sowing, in accordance with the instructions of the manufacturer of the inoculant. When seeding is required at other than the seasons shown on the plans or in the 2101-0602 T-901-3 Revised 12/21/2006 special provisions, a cover crop shall be sown by the same methods required for grass and legume seeding. d. Rolling. After the seed has been properly covered, the seedbed shall be immediately compacted by means of an approved lawnroller, weighing 40 to 65 pounds per foot (60 to 97 kg per meter) of width for clay soil (or any soil having a tendency to pack), and weighing 150 to 200 pounds per foot (223 to 298 kg per meter) of width for sandy or light soils. 901-3.3 WET APPLICATION METHOD. a. General. The Contractor may elect to apply seed and fertilizer (and lime, if required) by spraying them on the previously prepared seedbed in the form of an aqueous mixture and by using the methods and equipment described herein. The rates of application shall be as specified in the special provisions. b. Spraying Equipment. The spraying equipment shall have a container or water tank equipped with a liquid level gauge calibrated to read in increments not larger than 50 gallons (190 liters) over the entire range of the tank capacity, mounted so as to be visible to the nozzle operator. The container or tank shall also be equipped with a mechanical power-driven agitator capable of keeping all the solids in the mixture in complete suspension at all times until used. The unit shall also be equipped with a pressure pump capable of delivering 100 gallons (380 liters) per minute at a pressure of 100 pounds per square inch (690 kPa). The pump shalt be mounted in a line that will recirculate the mixture through the tank whenever it is not being sprayed from the nozzle. All pump passages and pipe lines shall be capable of providing clearance for 5/8 inch (15 mm) solids. The power unit for the pump and agitator shall have controls mounted so as to be accessible to the nozzle operator. There shall be an indicating pressure gauge connected and mounted immediately at the back of the nozzle. The nozzle pipe shall be mounted on an elevated supporting stand in such a manner that it can be rotated through 360 degrees horizontally and inclined vertically from at least 20 degrees below to at least 60 degrees above the horizontal. There shall be aquick-acting, three-way control valve connecting the recirculating line to the nozzle pipe and mounted so that the nozzle operator can control and regulate the amount of flow of mixture delivered to the nozzle. At least three different types of nozzles shall be supplied so that mixtures may be properly sprayed over distance varying from 20 to 100 feet (6 to 30 m). One shall be a close-range ribbon nozzle, one amedium-range ribbon nozzle, and one along-range jet nozzle. For case of removal and 2101-0602 T-901-4 Revised ~ 2/21/2006 cleaning, all nozzles shall be connected to the nozzle pipe by means of quick-release couplings. In order to reach areas inaccessible to the regular equipment, an extension hose at least 50 feet (15 m) in length shall be provided to which the nozzles may be connected. c. Mixtures. Lime, if required, shall be applied separately, in the quantity specified, prior to the fertilizing and seeding operations. Not more than 220 pounds (100 kg) of lime shall be added to and mixed with each 100 gallons (380 liters) of water. Seed and fertilizer shall be mixed together in the relative proportions specified, but not more than a total of 220 pounds (100 kg) of these combined solids shall be added to and mixed with each 100 gallons (380 liters) of water. All water used shall be obtained from fresh water sources and shall be free from injurious chemicals and other toxic substances harmful to plant life. Brackish water shall not be used at any time. The Contractor shall identify to the ENGINEER all sources of water at least 2 weeks prior to use. The ENGINEER may take samples of the water at the source or from the tank at any time and have a laboratory test the samples for chemical and saline content. The Contractor shall not use any water from any source that is disapproved by the ENGINEER following such. tests. All mixtures shall be constantly agitated from the time they are mixed until they are finally applied to the seedbed. All such mixtures shall be used within 2 hours from the time they were mixed or they shall be wasted and disposed of at locations acceptable to the ENGINEER. d. Spraying. Lime, if required, shall be sprayed only upon previously prepared seedbeds. After the applied lime mixture has dried, the lime shall be worked into the top 3 inches (8 cm), after which the seedbed shall again be properly graded and dressed to a smooth finish. Mixtures of seed and fertilizer shall only be sprayed upon previously prepared seedbeds on which the lime, if required, shall already have been worked in. The mixtures shall be applied by means of ahigh-pressure spray that shall always be directed upward into the air so that the mixtures will fall to the ground like rain in a uniform spray. Nozzles or sprays shall never be directed toward the ground in such a manner as might produce erosion or runoff. Particular care shall be exercised to insure that the application is made uniformly and at the prescribed rate and to guard against misses and overlapped areas. Proper predetermined quantities of the mixture in accordance with specifications shall be used to cover specified sections of known area. Checks on the rate and uniformity of application may be made 2101-0602 T-901-5 Revised 12/21/2006 by observing the degree of wetting of the ground or by distributing test sheets of paper or pans over the area at intervals and observing the quantity of material deposited thereon. On surfaces that are to be mulched as indicated by the plans or designated by the ENGINEER, seed and fertilizer applied by the spray method need not be raked into the soil or rolled. However, on surfaces on which mulch is not to be used, the raking and rolling operations will be required after the soil has dried. 901-3.4 MAINTENANCE OF SEEDED AREAS. The Contractor shall protect seeded areas against traffic or other use by warning signs or barricades, as approved by the ENGINEER. Surfaces gullied or otherwise damaged following seeding shall be repaired by regrading and reseeding as directed. The Contractor shall mow, water as directed, and otherwise maintain seeded areas in a satisfactory condition until final inspection and acceptance of the work. When either the dry or wet application method outlined above is used for work done out of season, it will be required that the Contractor establish a good stand of grass of uniform color and density to the satisfaction of the ENGINEER. A grass stand shall be considered adequate when bare spots are one square foot or less, randomly dispersed, and do not exceed 3% of the area seeded. If at the time when the contract has been otherwise completed it is not possible to make an adequate determination of the color, density, and uniformity of such stand of grass, payment for the unaccepted portions of the areas seeded out of season will be withheld until such time as these requirements have been met. METHOD OF MEASUREMENT 901-4.1 The quantity of seeding to be paid for shall be the number of acres] measured on the ground surface, completed and accepted. BASIS OF PAYMENT 901-5.1 Payment shall be made at the contract unit price per acre or fraction thereof, which price and payment shall be full compensation for furnishing and placing all material and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. Payment will be made under: Item 901-5.1 Seeding-per acre 2101-0602 T-901-6 Revised ~ 2/2 7/2006 MATERIAL REQUIREMENTS ASTM C 602 ASTM D 977 FED SPEC A-A-1909 FED SPEC A-A-2671 Agricultural Liming Materials Emulsified Asphalt Fertilizer Seeds, Agriculture END OF ITEM T-901 2101-0602 T-901-7 Revised 12/21/2006 ITEM T-901 SEEDING DESCRIPTION 901-1.1 This item shall consist of soil preparation, seedingliming and fertilizing the areas shown on the plans or as directed by the ENGINEER in accordance with these specifications. MATERIALS 901-2.1 SEED The species and application rates of grass, legume, and cover-crop seed furnished shall be those stipulated herein. Seed shall conform to the requirements of Fed. Spec. A-A-2671. Seed shall be furnished separately or in mixtures in standard containers with the seed name, lot number, net weight, percentages of purity and. of germination and hard seed, and percentage of maximum weed seed content clearly marked. for each kind of seed. The Contractor shall furnish the ENGINEER duplicate signed copies of a statement by the vendor certifying that each lot of seed has been tested by a recognized laboratory for seed testing within 6 months of date of delivery. This statement shall include: name and address of laboratory, date of test, lot number for each kind of seed, and the results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of a mixture, the proportions of each kind of seed. Seeds shall be applied as follows: Permanent Seeding Seed Maximum Seed Purity Maximum Weed Seed Minimum Rate of Application Tall Fescue 90% 2.5% 80 Ib/acre Kobe Lespedeza 90% 2.5% 40 Ib/acre Rye (Grain)' 90% 2.5% 40 Ib/acre Add Rye (Grain) only if seeding occurs prior to May 1 or after August 15. Seeding shall be performed during the period between August 25 and September 15 or February 15 and March 21 inclusive, unless otherwise approved by the ENGINEER. 2101-0602 T-901-1 Revised 72/2 7/2006 901-2.2 LIME. Lime shall be ground limestone containing not less than 85% of total carbonates, and shall be ground to such fineness that 90% will pass through a No. 20 mesh sieve and 50% will pass through a No. 100 mesh sieve. Coarser material will be acceptable, providing the rates of application are increased to provide not less than the minimum quantities and depth specified in the special provisions on the basis of the two sieve requirements above. Dolomitic lime or a high magnesium lime shall contain at least 10% of magnesium oxide. Lime shall be applied at the rate of 4,000 pounds per acre. All liming materials shall conform to the requirements of ASTM C 602. 901-2.3 FERTILIZER. Fertilizer shall be standard commercial fertilizers supplied separately or in mixtures containing the percentages of total nitrogen, available phosphoric acid, and water-soluble potash. They shall be applied at the rate and to the depth specified herein, and shall meet the requirements of Fed. Spec. A-A-1909 and applicable state laws. They shall be furnished in standard containers with name, weight, and guaranteed analysis of contents clearly marked thereon. No cyanamide compounds or hydrated lime shall be permitted in mixed fertilizers. The fertilizers may be supplied in one of the following forms: a. A dry, free-flowing fertilizer suitable for application by a common fertilizer spreader; b. Afinely-ground fertilizer soluble in water, suitable for application by power sprayers; or c. A granular or pellet form suitable for application by blower equipment. Fertilizers shall be 10-10-10 commercial fertilizer and shall be spread at the rate of 1,000 pounds per acre at the time of seeding operations. Following intial seeding operations, use of additional fertilizer shall be avoided so as to minimize transport of excess nutrients to Gunn Creek and its tributaries, which have been classified as nutrient sensitive waters. Any additional fertilizing shall be limited to the minimum necessary to maintain the health of the vegetation in the project grassed filter strips, swales and extended dry detention basins. 901-2.4 SOIL FOR REPAIRS. The soil for fill and topsoiling of areas to be repaired shall be at least of equal quality to that which exists in areas adjacent to the area to be repaired. The soil shall be relatively free from large stones, roots, stumps, or other materials that will interfere with subsequent sowing of seed, compacting, and establishing turf, and shall be approved by the ENGINEER before being placed. 2101-0602 T-901-2 Revised 12/21/2006 CONSTRUCTION METHODS 901-3.1 ADVANCE PREPARATION AND CLEANUP. After grading of areas has been completed and before applying fertilizer and ground limestone, areas to be seeded shall be raked or otherwise cleared of stones larger than 2 inches (50 mm) in any diameter, sticks, stumps, and other debris that might interfere with sowing of seed, growth of grasses, or subsequent maintenance of grass-covered areas. If any damage by erosion or other causes has occurred after the completion of grading and before beginning the application of fertilizer and ground limestone, the Contractor shall repair such damage. This may include filling gullies, smoothing irregularities, and repairing other incidental damage. An area to be seeded shall be considered a satisfactory seedbed without additional treatment if it has recently been thoroughly loosened and worked to a depth of not less than 5 inches (125 mm) as a result of grading operations and, if immediately prior to seeding, the top 3 inches (75 mm) of soil is loose, friable, reasonably free from large clods, rocks, large roots, or other undesirable matter, and if shaped to the required grade. However, when the area to be seeded is sparsely sodded, weedy, barren and unworked, or packed and hard, any grass and weeds shall first be cut or otherwise satisfactorily disposed of, and the soil then scarified or otherwise loosened to a depth not less than 5 inches (125 mm). Clods shall be broken and the top 3 inches (75 mm) of soil shall be worked into a satisfactory seedbed by discing, or by use of cultipackers, rollers, drags, harrows, or other appropriate means. 901-3.2 DRY APPLICATION METHOD. a. Liming. Lime shall be applied separately and prior to the application of any fertilizer or seed and only on seedbeds that have previously been prepared as described above. The lime shall then be worked into the top 3 inches (75 mm) of soil after which the seedbed shall again be properly graded and dressed to a smooth finish. b. Fertilizing. Following advance preparations and cleanup fertilizer shall be uniformly spread at the rate that will provide not less than the minimum quantity stated in paragraph 901-2.3. c. Seeding. Grass seed shall be sown at the rate specified in paragraph 901-2.1 immediately after fertilizing, and the fertilizer and seed shall be raked within the depth range stated in the special provisions. Seeds of legumes, either alone or in mixtures, shall be inoculated before mixing or sowing, in accordance with the instructions of the manufacturer of the inoculant. When seeding is required at other than the seasons shown on the plans or in the 2101-0602 T-901-3 Revised 12/21/2006 special provisions, a cover crop shall be sown by the same methods required for grass and legume seeding. d. Rolling. After the seed has been properly covered, the seedbed shall be immediately compacted by means of an approved lawnroller, weighing 40 to 65 pounds per foot (60 to 97 kg per meter) of width for clay soil (or any soil having a tendency to pack), and weighing 150 to 200 pounds per foot (223 to 298 kg per meter) of width for sandy or light soils. 901-3.3 WET APPLICATION METHOD. a. General. The Contractor may elect to apply seed and fertilizer (and lime, if required) by spraying them on the previously prepared seedbed in the form of an aqueous mixture and by using the methods and equipment described herein. The rates of application shall be as specified in the special provisions. b. Spraying Equipment. The spraying equipment shall have a container or water tank equipped with a liquid level gauge calibrated to read in increments not larger than 50 gallons (190 liters) over the entire range of the tank capacity, mounted so as to be visible to the nozzle operator. The container or tank shall also be equipped with a mechanical power-driven agitator capable of keeping all the solids in the mixture in complete suspension at all times until used. The unit shall also be equipped with a pressure pump capable of delivering 100 gallons (380 liters) per minute at a pressure of 100 pounds per square inch (690 kPa). The pump shall be mounted in a line that will recirculate the mixture through the tank whenever it is not being sprayed from the nozzle. All pump passages and pipe lines shall be capable of providing clearance for 5/8 inch (15 mm) solids. The power unit for the pump and agitator shall have controls mounted so as to be accessible to the nozzle operator. There shall be an indicating pressure gauge connected and mounted immediately at the back of the nozzle. The nozzle pipe shall be mounted on an elevated supporting stand in such a manner that it can be rotated through 360 degrees horizontally and inclined vertically from at least 20 degrees below to at least 60 degrees above the horizontal. There shall be aquick-acting, three-way control valve connecting the recirculating line to the nozzle pipe and mounted so that the nozzle operator can control and regulate the amount of flow of mixture delivered to the nozzle. At least three different types of nozzles shall be supplied so that mixtures may be properly sprayed over distance varying from 20 to 100 feet (6 to 30 m). One shall be a close-range ribbon nozzle, one amedium-range ribbon nozzle, and one along-range jet nozzle. For case of removal and 2101-0602 T-901-4 Revised 12/21/2006 cleaning, all nozzles shall be connected to the nozzle pipe by means of quick-release couplings. In order to reach areas inaccessible to the regular equipment, an extension hose at least 50 feet (15 m) in length shall be provided to which the nozzles may be connected. c. Mixtures. Lime, if required, shall be applied separately, in the quantity specified, prior to the fertilizing and seeding operations. Not more than 220 pounds (100 kg) of lime shall be added to and mixed with each 100 gallons (380 liters) of water. Seed and fertilizer shall be mixed together in the relative proportions specified, but not more than a total of 220 pounds (100 kg) of these combined solids shall be added to and mixed with each 100 gallons (380 liters) of water. All water used shall be obtained from fresh water sources and shall be free from injurious chemicals and other toxic substances harmful to plant life. Brackish water shall not be used at any time. The Contractor shall identify to the ENGINEER all sources of water at least 2 weeks prior to use. The ENGINEER may take samples of the water at the source or from the tank at any time and have a laboratory test the samples for chemical and saline content. The Contractor shall not use any water from any source that is disapproved by the ENGINEER following such. tests. All. mixtures shall be constantly agitated from the time they are mixed until they are finally applied to the seedbed. All such mixtures shall be used within 2 hours from the time they were mixed or they shall be wasted and disposed of at locations acceptable to the ENGINEER. d. Spraying. Lime, if required, shall be sprayed only upon previously prepared seedbeds. After the applied lime mixture has dried, the lime shall be worked into the top 3 inches (8 cm), after which the seedbed shall again be properly graded and dressed to a smooth finish. Mixtures of seed and fertilizer shall only be sprayed upon previously prepared seedbeds on which the lime, if required, shall already have been worked in. The mixtures shall be applied by means of ahigh-pressure spray that shall always be directed upward into the air so that the mixtures will fall to the ground like rain in a uniform spray. Nozzles or sprays shall never be directed toward the ground in such a manner as might produce erosion or runoff. Particular care shall be exercised to insure that the application is made uniformly and at the prescribed rate and to guard against misses and overlapped areas. Proper predetermined quantities of the mixture in accordance with specifications shall be used to cover specified sections of known area. Checks on the rate and uniformity of application may be made 2101-0602 T-901-5 Revised 72/2 7/2006 by observing the degree of wetting of the ground or by distributing test sheets of paper or pans over the area at intervals and observing the quantity of material deposited thereon. On surfaces that are to be mulched as indicated by the plans or designated by the ENGINEER, seed and fertilizer applied by the spray method need not be raked into the soil or rolled. However, on surfaces on which mulch is not to be used, the raking and rolling operations will be required after the soil has dried. 901-3.4 MAINTENANCE OF SEEDED AREAS. The Contractor shall protect seeded areas against traffic or other use by warning signs or barricades, as approved by the ENGINEER. Surfaces gullied or otherwise damaged following seeding shall be repaired by regrading and reseeding as directed. The Contractor shall mow, water as directed, and otherwise maintain seeded areas in a satisfactory condition until final inspection and acceptance of the work. When either the dry or wet application method outlined above is used for work done out of season, it will be required that the Contractor establish a good stand of grass of uniform color and density to the satisfaction of the ENGINEER. A grass stand shall be considered adequate when bare spots are one square foot or less, randomly dispersed, and do not exceed 3% of the area seeded. If at the time when the contract has been otherwise completed it is not possible to make an adequate determination of the color, density, and uniformity of such stand of grass, payment for the unaccepted portions of the areas seeded out of season will be withheld until such time as these requirements have been met. METHOD OF MEASUREMENT 901-4.1 The quantity of seeding to be paid for shall be the number of acres] measured on the ground surface, completed and accepted. BASIS OF PAYMENT 901-5.1 Payment shall be made at the contract unit price per acre or fraction thereof, which price and payment shall be full compensation for furnishing and placing all material and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. Payment will be made under: Item 901-5.1 Seeding-per acre 2101-0602 T-901-6 Revised 12/21/2006 MATERIAL REQUIREMENTS ASTM C 602 ASTM D 977 FED SPEC A-A-1909 FED SPEC A-A-2671 Agricultural Liming Materials Emulsified Asphalt Fertilizer Seeds, Agriculture END OF ITEM T-901 2101-0602 T-901-7 Revised ~ 2/21/2006 Project No. bWQ. ~~- /~/ / ` , DIVISION OF WATER QUALITY ~ ; ~N 401 EXTENDED DRY DETENTION BASIN WORKSHEET AWQ stormwater Manaaement Plan Review At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name : Q UR~~.J(a7pN ~ ~ c ~ ~TAn~c~ ~EGioNAt- Y 6-z ~ ~.r~~~vs~o~/ Contact Person: ~2 I c 5 7'U ^~ H Phone Number: ~~ 7 c 3 ^ S- 3 sv T4-~-~3~~-r ~ g~ i~T YB~o Sfr~~t ~ ~~, G~i~ ~ ~,,~ Irv n~ N~ 285°d For projects with multiple basins, specify which basin this worksheet applies to:_ Dr2 ~ ~~~~.-c g.4-s ~,~ ,~ Drainage Area:: acres Percent Impervious Area: - % ; II. REQUIRED ITEMS CHECKLIST ~ ~,G ~ ~~ The following checklist outlines design requirements per the stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Apalicants Initials Either capture runoff ftom 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. ©~ ~ 3 ,~ Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain The basin length to width ratio is greater than 3:1. ©• Z S Ac • Fz- The basin side slopes are no steeper than 3:1. A small permanent pool at outlet orifice is provided to reduce dogging. w fTH in/ P~c~ r- ,~q,vya riE An emergency drain to completely empty the basin is provided. ~ ~ ~ ~ 7~'2E . Vegetation plan prepared is spedfied on plans.. Basin to be stabilized within 14 days of construction is specified. Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85% TSS removal efficiency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompaded natural soils are utilized to promote vegetation and reduce sedimentation. PER G~-A ST,~/r7A~ Seasonal high water table is at leas# 1 foot below bottom of basin. sr''E~rP~~~2 ~,-+-5 ~ ~ S~~' If used as a temporary sediment basin, plans indicate dean-out prior to final operation. A'ti` mod' ~ "'~ ~ ~~ A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. Project No.10WQ ~~- /~/ / ~( // DIVISION OF WATER. QUALITY ~' 1-~ j~ ~( 401 EXTENDED DRY DETENTION BA51N WORKSHEET DWQ Stormwater Management Plan Review At a minimum, a complete sormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BIu1Ps and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay find! review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name : Q v;Pu~UTa~v - A c. ~ ~t~aNC~ ~EGioNA~- Contact Person: ~ 1 c S 7v ^-r ~+ Phone Number. f °l ~o) 7 c 3 - ~ s s-v T4-~-F3~-n-r ~ gamic,-r-rT YB~a Sfs~-qty tea, f.~li~~n ~nrcrun~ nr~ z.85~~ For projects with multiple basins, spedfy which basin this worksheet applies to:_ Dr2 ~ ~~~~ ,g.¢-s ~~ -y Drainage Area: aae Percent Im envious Area: - °~ II. REQUIRED ITEMS CHECKLIST ~-~ j~ ~ i~.2~ The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 4$ hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. „ Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain °~ ~ 7 The basin length to width ratio is greater than 3:1. ~ ' Ac • ~T The basin side slopes are no steeper than 3:1. ' A small permanent pool at outlet orifice is provided to reduce dogging. w rrNinl P~e~ c.~ r ,~r~,q,~~a t.E An emergency drain to completely empty the basin is provided. ~ ~ ~ ~~ . Vegetation plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. _Sediment storage {20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°~ TSS removal effidency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-0ut problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. PEA GAa4 .STJ~/Df}~ Seasonal high water table is at leas# 1 foot below bottom of basin. s~'E~~G~~i-17Z~'S ~ ~ ~ ~ If used as a temporary sediment basin, plans indicateclean-out prior to final operation. /~ ~ °' ~''"t ~ ~ A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. Project No. DWQ ~-~-` /~/ / 11 .,J~~ DIVISION OF WATER QUALITY ~~ ~ N ,•(f ` 401 EXTENDED DRY DETENTION BASIN WORKSHEET AWQ stormwater Management Plan Review:. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed- operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name : Q ~~~-in/UTaN - A Contact Person: ~ I c 5TV M -~4n~cE ~rG/oN~K- l~irPPo4~ ~dNwAy 6-2'~ ~X7~"7~S~Jn/ Phone Number. ~°1<~) 7 c 3 - ~ 3 sv T4-~-r3C-n-r ~ ~32ic~,T YSia .Sfi~-~C~ tea, f.~!/~~n ~nrcrvr~ n~~ z8~~ For projects with multiple basins, specify which basin this worksheet applies to:_ fj~ ~,,,,,~~..~ ,si¢5,,,, 3 Drainage Area:: aces Percent Impervious Area: - °~ , ~ ~ ~~ °~ II. REQUIRED ITEMS CHECKLIST ~~ ~-~ - 7> 7 ~ !3. The following checklist outlines design requirements per the stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NGAC 2H .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been mef, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. ,~ Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain ©~ ~ ~U The basin length to width ratio is greater than 3:1. ©~ ~ ~-~ Ac • FT- The basin side slopes are no steeper than 3:1. _A small permanent pool at outlet orifice is provided to reduce dogging. w ~ ~r•.r PeF~~s r rr~q,//~a !-E M emergency drain to completely empty the basin is provided. ~ ~"~'~ . Vegetation plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. _Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°~ TSS removal effidency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. If used as a temporary sediment basin, plans indicate clean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. PER ~~ 57'jM/afl-/t~ i~ sPFG/~/~'72~n-S ~ /A'' ~~ Protect No. DWQ DIVISION OF WATER. QUALITY 401 EXTENDED DRY DETENTION BASfN WORKSHEET DWQ Stormwater Manaaement Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance. agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name : !3 vR~i~/, ~'l~NCE /~r G/on/!~k- /-~/RPo/L~ ; ~ Contact Person: ~ ~ S Tv ^^ /'f+ Phone Number: ~v 7 c 3 ~- ~ s s~ T4-~-/3cYLT / ~~/e7-rT ~Sld SHE~~.E~ IJQ, W/~.vl ~NGTUN For projects with multiple basins, specify which basin this worksheet applies to:_ Drainage Area:: acres Percent Impervious Area: - °~ ~~ l II. REQUIR~D T+EMS CHECKLIST ~-!~b k~ ~ ~'~f a ,~ N~~zb'YJ 112 Q H/~4c-~ ~.4-s ire The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, affach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. f ~,/ -Please provide routing for 1 yr. 24 hr. event or volume from_ 1 inch rain °~ = The basin length to width ratio is greater Phan 3:1. ~ ~ ~ p A~ • Fr- The basin side slopes are no steeper than 3:1. 0 A small permanent pool at outlet orifice is provided to reduce dogging. w rrts ir.1 PzFCMs T MaNka GE An emergency drain to completely empty the basin is provided. ~?''2u ~~ . Vegetafion plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. _Sediment storage (20°r6 of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°~ TSS :removal effidency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. DER ~-,~ S~}7,,/D~ Seasonal high water table is at least 1 foot below bottom of basin. s~'~~~/~~'S 7v r' `f ~~ If used as a temporary sediment basin, plans indicate clean-out prior to final operation. '~'~` N0j ~' `"~ P ~.~ • A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. Burlington-Alamance Regional Airport Runway 6-24 extension Stormwater Management Plan Calculations 1. Size Extended Drv Detention Basin Basin Drainage Area (Acres) Existing Impervious Area Acres Proposed Impervious Area Acres Total Impervious Area Acres 1 12.65 0.21 2.39 2.6 2 10.28 0.18 1.16 1.34 3 13.14 0 0.72 0.72 4 7.16 0 0.73 0.73 2. Determine 1" Storm Volume (as required by NCDENR for 83%Total Suspended Solids Removal) Equations: Shuelers Equation: Rv = .009*I + 0.05 Volume: Rv*1in*drainage area*(1/12) Sediment Storage Volume: Rv =Runoff Volume I = % Impervious Basin % Impervious (1) Runoff Volume (Rv) Acre-Feet (AGFT) Total Required Storage (Runoff+ Sediment)- (AC• 1 20.6 0.23 0.25 0.30 2 13.0 0.17 0,14. 0.17. 3 5.5 0.10 0.11' 0.13 4 10.2 0.14 0.08 0.10 3. Determine Orifice Area to Completely-Drain Pond In 48hrs. Hr-Second Conversion- 48hrs - 172,800 Seconds Equations: Q=C*A*SQRT(2*g*H) Basin Volume in Acre-Feet AC-FT Volume in (CF) Flow Rate (Q) in Cubic FeeUSecond CFS Average Head in (Ft) Area of Orifice in square feet Diameter irr ,in T 0.30 13,068 0.08 1.8 0.007. 1.13 2 0.17 7,405 0.04 1.8 0.004 0.85 3 0.13 5,663 0.03 1.8 0.003 0.75 4 0.10 4,356 0.03 1.8 0.002 0.86 1,4' DWQ Project No, bS- ~'~// DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: (3y2L/n!G-7vN-~{-L,QN'/~-N~ R~~io~yA-t ,~1r~2~'~2"l-; ~~N~,//~y 6-z~CxTtr/sraAl Contact Person: ~R Ic S rv ^~ l'/> Phone Number: j !o l 76 3 - S3 sv SwalelD; Tim-~3~ ~ BQ~~iT ¢•B~o S/~~u-C~y p~2, w~~n,N~~•.~ Nc 28~or~ DRS/ N ~~ rN ~ % : skr4t,~ iq Grass Swale Length ' ~ _ ~ ~ ~ ft. (at least 100 ft. per tribu#ary acre) Tributary Drainage Area • ~ -O ac. (on-site and off-site drainage to the swale) Impervious Area ~ .~To ac. (on-site and off-site drainage to the swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop 11. REQUIRED ITEMS CHECKLIST p) • fps -~ ' s ~P 3: / ratio -~ y- ,OV~2~ ftlft "7"•4-tom DES cvE~ (2 fps max.) (3:1 min.) (check dams may be used) Kor3E L ESPFD E z,e(. ~Spf-c/frcq~-7r~ T 90/) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submiftal .package wail result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan. provided on plans The underlying soils are permeable and non-compacted F/.{A- STU sP~rFr ~i~ C'-/~ 2 Swale carries only stonnwater flow ~~° Y ° .vo T 6 .Ko.~~'ta~ Water table depth is greater than 1 foot Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized by the responsible party is provided. D1/VQ Project No. bS- /'7 / ~ DIVISION OF WATER QUALITY • GRASSED SW;4LE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project N ame : 6 u rz c /.J ~- ~„ ,v - s~ ~,4 wl ~ ~v cE' /zt-zs-i o niA-~ 1~ ,4 /2~'~ 2?- ' ~C dn/ ~/A y 6~'~ ~ ~ Xl-r n/sr~N Contact Person: ~!2!c ST~~ l'/> Phone Number:_(`~~o l ~ 76 3 -5s su Swale ID: __ - _ - T _ _ _ -- _ ~ `_ _ -- ~~~/ ~ iN ~-t"g~tea- ~ ,BQ~~-jr~ ~S/~ S/~~tc~Y D•2, !.`/~~n,v ~-7'~ /~ 28 ~for- Grass Swale Le- hgtti ^ ~~ 'Cif' ~ l'7 tt. (at least 100 ft. per tributary acre) Tributary Drainage Area ~ ac. (on-site and off-site drainage to the swale) Impervious Area . !~ ~ ac. (on-site and off-site drainage to the swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop H. REQUIRED REMS CHECKLIST (, 0 p .~ ,.b'7 fps fps 3~ / ratio J J Z ~~ ft/ft ,4-t,e..1=~ S cyE~ (2 fps max.) (3:1 min.) (check dams may be used) Koi3~ L ESP~D E Z,e~ \ ~Sj~~G/FlC~Jd'N T ~O! ) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attar~ed. If a requirement has not been met, attach an explanation of w1ry. At a minimum, a complete stonnwater management plan submittal includes . a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement Arr incomplete submittal package vri11 result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan. provided on plans The underlying soils are permeable and non-compacted ~~A- STD sP~rFr ~i~C'-~~ 2 Swale carries only stormwater flow ~P Y ~ .vim i 6 nn-4-c~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice C~ annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No. bS- /'7/ j !)IVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET L PROJECT INFORMATION (please complete the following information): Project N ame : Q v Q ~ i.J ~- rv iv - ,¢ L,q w/ q- ~vCE' ~ t-~-i o niA-cr I~ Contact Person: ~~~c ST~^~/'/> Phone Number: (9lv) 763-53 So SwalelD: TkK-/3~ ~ BQ~~,-~ ~S'/~ S/~eu-cry ve l~/~~h~N~~...~ N~ 28S~o~ Gralss Swale eng>;hE , G ' ~ 7 D ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~-.-(v ac. (on-site and off-site drainage to the swale) Impervious Area ,~. ~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop II. REQUIRED REMS CHECKLIST .~/ ~s ~'ZrJ fps 3~ / ratio ,. , o v_ ~S~ ft/ft ~¢Lt-~E$CV~g (2 fps max.) (3:1 min.) (check dams may be used) Ko~3E L ESPED E Z~4 ~Sp~clficq~-7rrJ T 9oI) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal incudes a worksheet for each BMP, design calculations, plans and spedfications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/-FA- STD sP~Fr ~v^'' P ~~ z- Swalecarries only stormwater flow ~~° Y k .~"~ i a n P.¢~~ , .Water table depth is greater than 1 foot. Plan details for the swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQProjectNo, bS- /'7/ t71VISION OF WATER QUALITY -GRASSED SW;4LE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: Qv2Gi.J~.Tro,~_~L,gwi~-NcE 2t~-ioniA-cr !~ 6- z ~ ~ xr'r n/sr~+V Contact Person: ~~2 ~c S 7-v•~a PH Phone Number: j9'!~ 1 76 3 -S3 sv Swale ID: Tic-/3~ ~ BQ~~if ¢S~o S/~~y v~2, r~Jf~n,N ~~~ /~~ 'z-BYoar' DR.~i,v ~~ ~N ~ Y °s~a-ice i~ Grass Swale Length o ~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~~~ac. (on-site and off-site drainage to the swale) Impervious Area _ ac. (on-site and off-site drainage to the swale) Max. Velocty from 2 Yr. Stone Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop h. REQUIRED REMS CHECKLIST ~~ ~ fps 6 GPs 3~ / ratio -. d0-~ ft/ft `T-,q.-u-~EScy~E (2 fps max.) (3:1 min.) (cheek dams may be used) KOl,E L ESPFD E Z~ ~Sp.FC~F,~q,~Q~ T 90~~ Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been mef, attach an explanation of why. At a minimum, a complete stonnwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted 7~/.{A- ~7D sG~Fr ~ri~ P i~ 2- Swalecarries onty stotmwater flow ~P Y k No i a ~v-4-~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at leas# twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No. bS- ~ r7 DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following. information): Project Name: 6vQ~i~~r~N-~L,gwi~-NCE /Z~-z=-ioniq-c. Contact Person: ~~21c S w^~ /'/> Phone Number: ~~ 6- 2 Y- ~ X1"'t NSl del '63-sssv Swale ID: T~-c-g~~a- ~ .l3Ql~,yT 4~5~ ~ S/f~c.cry vim, G/! L ~'t ~.v G-7~N N~ 28 Sao r' DR.~iN~rri Gra~ Swale L g~ 2~ ~S ~ ~ ft. (at least 100 ft. per tribu#ary acre) Tributary Drainage Area 3. • ac. (on-site and off-site drainage to the swale) Impervious Area =+ ~- ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop II. REQUIRED ITEMS CHECKLIST ~ f Z fps fps 3: / ratio . , , O Z ~~ it/ft %4-u-F~~vEE (2 fps max.) (3:1 min.) (check dams may be used) 1~oQE L ESPED E Z.rt Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached: ff a requirement has not been met, attad- an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/-fft STD sP~rFr ~.A~ri~ P-~~ i Swale carries only stormwater flow ~P y ¢ ,vv ~- c~.~v~, Water table depth is greater than 1 foot Plan details for the swale provided. Plan details for the inlets and outlets are provided. Check dams provided. .The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. A /~P!'~ 2T DII11QProjectNo. b~- /r7/ DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET L PROJECT INFORMATION (please complete the following. information): Project Name : b v Q L /.J (r yv N - ,~ L,Q N9 /.~- N~ Rt-~-i o niA-c.. Contact Person: ~12l~ S7v•tit/'r`1 Phone Number: (9l01 763-S3.SU SwalelD: Tye-c-~3~- ~ L3Q~~.iT ¢8~o S~~-u.~y DQ, t~/f~M,,,~~~ N~ 28~{~.~- OR,~, •y ~~/~.~,~i~~ Grass Swale L gtfi - - Z~ - ~-~-f ~ t~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area -2 ~, v ~r ac. (on-site and off-site drainage to the swale) Impervious Area =. ~S~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from. l0 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop II. REQUIRED ITEMS CHECKLIST l' Z~ fps -". ~ ; ~/-fps 3: / ratio D U ?~)~ft/f# A-u.-rES~vE£ 26 ,ri l~P~~ 27- ' 2dN ~/A Y 6- ~. ~ t Xr"r NSroN (2 fps max.) (3:1 min.) (check dams maybe used) Kog~ L ESPFD E z,e~ ~Sp~clFicgq-7a•J 'T 901) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attadted: If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing a8 BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a reques# for additional information and will substantially delay final review and approval of the project. Vegetation Plan. provided on plans The underlying soils are pem~eable and non-compacted 7~~,4 s~-D sP~Fr u}~i~r~" P-~~ 2- Swalecarries only stormwater flow ~'°P Y 4 Nn i a .Kl~.F~7~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice ~~ annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No.__. bS- /'7/ 1. PROJECT INFORMATION (please complete the following information): Project Name : (,~ v Q L /.J (r 71t N - ~ L,¢ 1M /.{- N~ R~-~-i o niq-t,. DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET 3~ 6- ~- ~ t XTt n/S/ dal/ Contact Person: ~~2l~ ST~^~~H Phone Number: ( ~y1 763'S3sv Swale ID: ~~ T~g~ ~ BQ~~.if ¢8/ o .Si~~c-C`Y D.Q, w~ c. ~c,N ~-~•..~ N~ 28 5~0.~ OR~iN~ ~~/i.~ Gra3 Swale Le gfh-- 3~ ` ~~ ~~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area 3 = ~ ~ ac. (on-site and off-site drainage to the swale) Impervious Area = • ~> l ac. (on-site and off-site drainage to the Swale) Max. Velodty from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes (, 33 fps ( ~'b fps 3~ / ratio (2 fps max.) (3:1 min.) Steepest Effective Slope Cover Crop H. REQUIRED ITEMS CHECKLIST ..~ ± Ora Z~~ ft/ft "~~3-L~ DES c v~~ (check dams may be used) Ka!sE G ESPED E z,e~ ~Sp~clFicq~'7a~ T 90~) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. ff a requirement has not been met, attach an explanatron of why. At a minimum, a complete stormwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package wail result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/-FA- S7D sGeuFr ~~ P-/~ 2- Swalecarries only stormwater flow ~~° Y F No i a ~o~~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. 13WQProjectNo. bS- /~/ I. PROJECT INFORMATION (please complete the following information): Project Name : 1s v Q L /n/ /r7ro N - ~ L,4 W//~- NGE Rt-~-, ~,vq-c. DIVISION OF WATER QUALITY - GRASSED SW;4LE WORKSHEET 3~ Contact Person: ~R /c STv.tir ~'i/ dN~/A y 6--z ~ ~ XTr n/s~aN Swale ID: Phone Number: (`llo ~ 76 3 ~ S3 sv OR.~ rJ~~J/N T~Q-c-g~T ~,BQ~Gt/T ~C8/~ S/~~uc*y ~.2~ G/Ith~~vU7~n/ NL 28~oY' Gra3 Swale e g ~~ '~ ~ • ~7 fl ft. (at least 100 ft. per tribu#ary acre) Tributary Drainage Area -> v ac. (on-site and off-site drainage to the swale) Impervious Area _ - : ~-a ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Stone Max. Velocity from 10 Yr. Storm Min, side sbpes Steepest Effective Slope Cover Crop M. REQUIRED ITEMS CHECKLIST . ~~ ~ 5~ fps. - ~ fps 3: r ratio use zS/ft/ft q-c~c~ ~~ c vE~ (2 fps max.) (3:1 min.) (check dams may be used) Ko!$E LESf'EDEZ,~{ SP~c ~ fi c q~-7 r~ ?- 9 0 ~) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached: !f a requirement has not been met, attach an explanafion of why. At a minimum, a complete stomtwater management plan submittal incudes a worksheet for each BMP, design calculations, plans and spedfications showing afi BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package wi11 result in a reques# for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are pem~eable and non-compacted ~/~~ sT p sP~z.rFr c.A-~~ P-i~ 2 Swale carries only stormwater flow ?aP y F ,Vo ; 6 n p.¢-c~~ Water table depth is greater than 1 foot. Plan details for the swaleprovided. -- Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized by the responsible party is provided DWQ Project No. bS- /~/ DIVISION OF WATER QUALITY -GRASSED SWi4LE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : ~v2 ~ i~~~ N -q-L,Q wi~NcE- /Zt-~-iunii}-c. Contact Person: ~R /~ STv^1 ~'/> Phone Number: Swale ID: T~-c-l3E~ ~ BQ~~T 4'g~o ,stioEi,.c~Y DR~i N ~,!N t~ S Gras Swalele g h~ ~~ ~(b ff. Tributary Drainage Area • , ac. Impervious Area = ~ ac. Max. Velocity from 2 Yr. Storm ~~ 3 ~o fps. Max. Velocity from 10 Yr. Storm ~' ~. < ~ ~' fps Min. side slopes 3~ / ratio A i~2('~ izT_ '~o ~~ 3-S3Sv ~Q~ G/i~~~v~-~N N~ 28`fos~ (at least 100 ff. per tribu#ary acre) (on-site and off-site drainage to the swale) (on-site and off-site drainage to the swale) (2 fps max.) (3:1 min.) ~i Steepest Effective Slope ~ `O v_Z~ ftlft (check dams maybe used) Cover Crop '7-~4-u-rEScvE~ ~ogE L ESP~D E z~ L'Sp~c~~,cg7-7r~ T 90~) h. REQUIRED REMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. ff a requirement has not been met, attach an explanation of why. At a minimum, a complete storrnwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a reques# for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are pem~eable and non-compacted F/.fi>- STD sP~-rFr ~n~ P ~~ 2 Swale carries only stormwater flow ~P 5~ F Nd i Q ~ r'~ Water table depth is greater than 1 foot Plan details for the swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. t311VQ Project No. bS- l r7 DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following. information): Project Name : (; u Q. c l~r ~. r, ~v - ,¢ L,4 r~ r.~ ~vt~E /~~-z-i ~:yA-c. ,d /~P!'j 2T ; ~'c dni ~//~ Y 6- 2 ~ ~ XTr n/sr~N Contact Person: ~>? !C S 7v.tit PH Phone Number: (9lo i ' 76.3 - S3 Sv SwalelD: T~-c-g~~r ~ BQ~~f ¢"S~o S/~~c.~y vQ~ t~/~~n,N~-7~~r N~ z85~or~ OR /,y ~fl-J!N Gra~ Swale ngth y~ ' ~ ~ ~~ ft, (at least 100 ft. per tributary acre) Tributary Drainage Area ~•~'~ ~ ac. (on-site and off-site drainage to the swale) Impervious Area _ =r ?i~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop It. REQUIRED (TENS CHECKLIST . f~_~-S~ ~p~. 't . `f fps 3: / /ratio v~u ~s ft/f# (2 fps max.) (3:1 min.) (check dams may be used) Ko!$E L ESP~D E Z~4 Initial in the space provided to indicate the following design requirements- have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why.. At a minimum, a complete stonnwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~~fi STD sPEzrFr ~i~" P-~~ z. Swale carries only stormwater flow ~p f F ,vo; c3 .~ P,¢-c~tv~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarizedby the responsible party is provided. O !? L Q !_ .~ N N ~ U d (6 ~ m (B ~ Q S_ ^ O ~ ~ ~ C N L (~ m (~ O ~ cfl l` o r~ ~- ~- o ~ ~t r- Q r- o r~ cg cfl ~ ~ cfl ~ ~ 4- r- ~ ~ ~ ~ r- r- ~ ~ ~ N to ln O ~ l` N ~ M ~ CO ~A ~ Q O O ~ cF ~ N M ~t M N ~ ~ t~ N ~ O ~ tf~ tr? M O G~ ' a U r r I~ O to M ~ CO Ln M N ~ ~- 00 0O M h N dO O ~ N (~ ~ O d' ~ M N N M M N ~ _ U tr7 ~ ~ ~ O CO ~ ~t f~ In Q U ct tt lf~ ~ ~t ~ M M M M 0 0 0 0 0 0 0 0 0 0 O U N ~ ~ C U ~~ 0 0 0 0 0 0 0 0 i Q In N Lf~ N ~ ~' N d' I~ N I` N 0 0 ~- 0 a O ~-+ lf) ~ to ~ ~ tt7 ~ ~ L1') ~ Q LI N N N N N N N N N N O . ~ 0 0 0 0 0 0 0 0 0 0 ~ ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 iT 0 0 0 0 0 0 0 0 0 0 X Gfl O I~ O 00 O to ti ~- In J ~ '~t ~ ~ ~F ~ d' M CO C~ ~t (~ ~ Q ~ ~ M ~ t~ I~ ' ~ O ti O In -O i Q 0 ~- f~ O C4 M M M ~ M O N ~ M O tC) CO M f~ N LL L O Q m 0 0 0 m Q m Q m r' ~ ~ ~- N N M M d' ~ U Z~ C (Q i O O O I I U L ~ ~ -~ ~ ~ C O O I I C ~ ~ ~ `'- ~ M f N ~ ( Q U t II ~ ~ II O U O U U CV ~! I I U ~ Rating Curve for Triangular Channel - 1 Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Discharge Rating Curve Plot 1.15 1.1 1.65 1.6 1.55 .~ 1.5 ~ 1.45 .. . 1.4 0 1.35 j 1.3 1.25 1.2 1.15 1.1 1.05 Manning Formula Normal Depth 0.030 0.00250 ft!ft 3.00 ft/ft (H:V) 3.00 ft/ft (H:V) 10.00 ft'/s V~lorksheet: Triangular Channel -1 Velocity (ftls) vs Discharge (ft31s) 1 2 3 4 5 Discharge (ft3Js) ~~ ~ ~ 3~'~ ~~ 6 7 8 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 12/21/2006 4:33:30 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project No. DW4 ~~- l ~/ DIVISION OF WAFER QUALITY ~/~ f /~/ 401 EXTENDED DRY DETENTION BASIN WORKSHEET AWQ stormwater Manaaement Plan Review. At a minimum, a complete stormwater management plan submittal includes a worksheet. for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project PROJECT INFORMATION (please complete the following information): Project Name : Q vQ~~n~C~7niv-~ ~ p ~-7~4NC~ ~c GioNA~ /-~iRPo4~ • ~~~vwAr Contact Person: ~ l c 5 7V ^~ f+ Phone Number: ~~ 7 c 3 T4-~-f3~-nr ~ ga2 ~s~rr 4~S~o SHED-L.e ~ IJR, Gvi~~n ~n~ cro ni 6-2 ~ ~,rr~-n~s~~~ 3 S'i~ ~V~ 28~f J For protects with multiple basins, specify which basin this worksheet applies to:_ pR ~,~,,~~ ,s,~s,,,, Drainage Area:: acres Perc~n# Impervious Area: - °k ; I~~tS ='~ ~ = ~/ f o~a II. REQUIRED ITEMS CHECKLIST ~ 2,~ ~ h~ The following checklist outlines design requirements per the stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafion of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. ©~ ~ 3 ,~ Please provide roufing for 1 yr. 24 hr. event or volume from 1 inch rain The basin length to width ratio is greater than 3:1. ©. 2 ~ Ac • FT- The basin side slopes are no steeper than 3:1. A small permanent pool at outlet orifice is provided to reduce dogging. w ~ ~nr P~c~s r- ,~q,/Ka ~E An emergency drain to completely empty the basin is provided. ~ ~ ~ ~~ . Vegetation plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. Sediment storage (20°~ of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. .Additional treatment to meet the 85°k TSS removal efficiency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. PE.~C Gr1-A ST,~/DA~ , Seasonal high water table is at least 1 foot below bottom of basin. sP~rG~~~Z ~n-S ~ P 5~ ' ,If used as a temporary sediment basin, plans indicate clean-out prior to final operation. ~ tidj ~'`t ~ A~L~ A site speck operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. Project No. DWQ ~~- / ~/ / ~( ~/ DIVISION OF WATER.QUALITY ~`'~ 1~ ~( 401 EXTENDED DRY DETENTION BASIN WORKSHEET UWQ stormwater Management Plan Review At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet stnacture details, a detailed drainage plan and a fully executed operation and maintenance. agreement. An incomplete submittal package will result in a request for additional information and wiN substantially delay Bnal review and approval of the project RROJECT INFORMATION (please complete the following information): Project Name : t3 ~~~-r~U?~N ` A Contact Person: ~ / c S 7'v ^~ rv1 ~4NCE" ~EG~ o N<K- ~irP~ 04~ • ~~~vwA y 6-2 ~ ~xr~~vS~onJ Phone Number: ~~ 7 c 3 3 S`O T~t3~n-r ~ gQ ~c~rT YB~a Sfr~-ter ~ tea, G~i~~n ~ni crv n~ .V~ z 85~ u For projects with multiple basins, spedfy which basin this worksheet applies to:_ fji2 ~,,,.~,~c-~ ,S,¢5,,,, y Drainage Area:: aces Percent Im rvious Area: -- fo. ~~ ~~ 3~ ~ ~~ fll II. REQUIRED ITEMS CHECKLIST k~ ~ t13I a /v~Z~' The following checklist outlines design requirements .per the stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. a~ ~ 7 „ -Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain The basin length to width ratio is greater than 3:1. ~ ' a ~ • FT The basin side slopes are no steeper than 3:1. ' A small permanent pool at outlet orifice is provided to reduce dogging. w ~ i~ ~~~c.f ~s T ~1 ~4~//ra r~ An emergency drain to completely empty the basin is provided. ~ ~ ~ ~'~ . Vegetation plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. Sediment storage {20°~ of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°~ TSS removal effidency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimise clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. DER G~'~ ST,~/a~ , Seasonal high water table is at least 1 foot below bottom of basin. s~~~F~~y1 u,-3 ~ ~ ~ ' jf used as a temporary sediment basin, plans indicate dean-out prior to final operation. '~` mod' fi''`t P ~~ A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. Project No. tiWQ ~-~- / ~/ / / • 1 DIVISION OF WATER QUALITY i' 1 J l N 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ stormwater Manaaement Plan Review At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the projed PROJECT INFORMATION (please complete the following information): Project Name : Q vR~i~ Contad Person: ~/~ 5 7v ^~ ~ti Phone Number. ~~ 7 c 3 - s- 3 sv T~-~-f3c-nr ~ ~3Q icn-rT YB~o Sfs~~r 1~ ~~, G~i~~ micro n~ .~~ zb'Y~ For protects ~nnth multiple basins, spedfy which basin this worksheet applies to:_ fji2 ~,,,,,~~ ,s,¢s „~ 3 Drainage Area:: ~p acres Perce~n/t Impervious Area: - °~// , II. REQUIRED ITEMS CHECKLIST !3 c~ h~ - 7%7 The following checklist outlines design requirements per the stormwater Best Management Pradices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requi-ement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch stone and draw down over a period of 2 to 5 days. ,, Please provide routing for 1 yr. 24 hr. event or volume from 1 inch rain °~ ~ ~U The basin length to width ratio is greater than 3:1. ©• ~ ~-• Ac • FT The basin side slopes are no steeper than 3:1. A small permanent pool at outlet orifice is provided to reduce dogging. w rn-s ir•~ P~c.t's r- ,~r~q,/Ko /-E An emergency drain to completely empty the basin is provided. ~ ~ ~ ~~ . Vegetation plan prepared is spedfied on plans. Basin to be stabilized within 14 days of construction is specified. -Sediment storage (20°~ of detention volume) in addition to detention volume is provided. .Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°~ TSS removal efficiency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-0ut problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. If used as a temporary sediment basin, plans indicate clean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. ~dwl~tNCE ~EGioNAt /~irt'Po4~• ~QdNWAj' 6-2~ ~,rT~7vSlon/ PER ~?A STEM/DfM-~ ii sPEGIP~c~i~-S ~ /' `f l.~ ~,j -- ~ ~/ Project No. DWQ DIVISION OF WATER. QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET pWQ Stormwater Manaaement Plan Review: At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance. agreement. An incomplete submittal package will result in a request for additional information and will substantially delay Bnal review and approval of the project I. PROJECT INFORMATION (please complete the following information): Project Name : Q v~u~/G~N ~ A ~ p DANCE ~t Gi o n/AL Contact Person: ~ / c 5 Tv "~ /~~+ Phone Number: ~°f <~ 1 7 c 3 ~- .~ 3 sv T4-t-F3~-nT ~ ~3~e ~c~-rT ~f8~o S~s~-~C !~ ~2, f.~1i~~n ~nr cru ~v nr~ ~z 8 5' ~ ~~' For projects with multiple basins, spedty which basin this worksheet applies to:_ Dr2 ~ ~~A-u-~ ,g.4-s ~.~ Drainage Area:: acres Percent Impervious Area: - °k , 'f ~--~ II. REQUIRED ITEMS CHECKLIST o.~b ~~- ~`~ o ~ 7 The following cheddist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of F~vironment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 211 .1008: Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. ,~ Please provide routing for 1 yr. 24 hr, event or volume from 1 inch rain °~ = j The basin length to width ratio is greater than 3:1. ©• 0 $ Aa • Fr- The basin side slopes are no steeper than 3:1. ' A small permanent pool at outlet orifice is provided to reduce dogging. w m~~rJ ~~~-c~>- r>7q,~Ka ~ M emergency drain to completely empty the basin is provided. ~ ~ ~ ~'~ . Vegetation plan prepared is spedfied on plans, Basin to be stabilized within 14 days of construction is specified. Sediment storage (20°~ of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85°A TSS removal effidency is provided. Access for dean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. If used as a temporary sediment basin, plans indicate dean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. The 0&M agreement is signed by the responsible party and notarized. ~irPPa2~": ,Q~.vwAr 6_Z~ F,r12:'~tiS~~~/ E'ER G~~1 STJM/Dft~j K"'~ ~ d ~ CJ r~t ~ ~© . Burlington-Alamance Regional Airport Runway 8-24 extension Stormwater Management Plan Calculations 1. Size Extended Drv Detention Basin Basin Drainage Area (Acres) Existing Impervlous Area Acres Proposed Impervious Area cres Total Impervious Area Acres. 1 12.65 0.21 2.39 2.6 2 10.28 0.18 1.16 1.34 3 13.14 0 0.72 0.72 4 7.16 0 0.73 0.73 2. Determine 1" Storm Volume tas required by NCDENR for 85% Total Suscended Solids Removall Equations: Shueler's Equation: Rv = .009"I + 0.05 Volume: Rv"1in"drainage area"(1/12) Sediment Storage Volume: Rv =Runoff Volume I = % Impervious Basin % Impervious (1) Runoff Volume (Rv) Acre-Feet (AC-FT) Total Required Storage (Runoff + Sediment) (AC- 1 20.6 0.23 0.25 0.30: 2 13.0 0.17 0.74 0.17 3 5.5 O.i0 0.11 0.13 4 10.2 0.14 0.08 0.10 3. Determine Orifice Area to ComuletelvDraln Pond In 48hrs Hr-Second Conversion- 48hrs -172,800 Seconds Equations: Q=C"A"SQRT(2"g*H) Basin Volume in Acre-Feet Volume in (CF) Flow Rate (D) in Cubic Average Head In (Ft) Area of Orifice in square Diameter In AC-FT FeeUSecond CFS feat .in 1 0.30 13,068. 0.08 1.8 0.007. 1.13 2 0.17 7,4015 0.04 1.8 0.004 0.85 3 0.13 5,863 0.03 1.8 0.003 0.75 4 0.10 4,358 0.03 1.8 . 0.002 6.66 1~' DWQ Project No. bS- ~ ~ l DIVISION OF WATfR QUALITY • GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following. information): Project Name: ~vQLl~J(r7vN-~-L,~1M~-N~ R~-~-ioniA-c. _ dN ~/A y 6- Z ~ ~ xr"r lvs~afv Contact Person: ~R lc STv^~ ~ti Phone Number: j`~"~o 1 76.3 -S3 Sv Swale ID: ~ Tim-/3~r ~ BQ~~yT ¢~8~ o S/~~u~ DQ~ tom/ r ~ ~ ~ N ~~...r N~ `z-8 Sao ~ OR~IN ~i Le ~ ~ ~ a s S ' ~ -' ~ ~ 0 Gr s wal g ft. (at least 100 ft. per tributary acre) Tributary Drainage Area -~ O ac. (on-site and off-site drainage to the swale) Impervious Area J ~ .~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop 11. REQUIRED ITEMS CHECKLIST r . C ~ fps .~ ~ fps 3~ / ratio -r O J 2'S ftlft ~cvE`~ (2 fps max.) (3:1 min.) (check dams may be used) Kog~ L ESPED E Z,~ ~Sp~clf~cq~-7a~ T-col) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fulty executed operation and maintenance agreement. An incomplete submittal .package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan. provided on plans The underlying soils are permeable and non~ompacted 7~/~,4 sTp sP~ rFr ~A~ri~ P-~~ 2 Swale carries only stormwater flow ~P y F ,pro; c3 nP.t-~~ .Water table depth is greaterthan 1 foot. Plan details for the swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetaton repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized by the responsible party is provided. DWQProjectNo._ bS- /%l DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. .PROJECT INFORMATION (please complete the following information): Project Name : f; v 2. G /.J (r 7y N - ,~ L,q w1 ~ NGE' /fit-Z,-i o n/A-~ ,i1 ~2~'~ 2?- ~ ~~N ~//~ Contact Person: Er2l~ S7'~^~P~/ Phone Number: Swale ID: _ __ Tye-c-g~~ca- ~ BQ~~iT ~S~ ~ .S~~c.~. l3 6~ Z ~ ~ X/-t NS~sN !01' 76 3 - Ss Sv 1~.~, G/ f ~ M iN G-~...r Nc- 'Z--B Sao r~ Grass Swale Le gth ' i~ O t~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~ ac. (on-site and off-site drainage to the swale) Impervious Area . !,~ ~ ac. (on-site and off site drainage to the swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop It. REQUIRED REMS CHECKLIST _ ~~ rJ ~ ~ ~.~'? ~ fps 3: / ratio JJ L~~ ft/ft q-t c.- r~ cvE£ (2 fps max.) (3:1 min.) (check dams may be used) KogE L ESPFD E Z~4 ~sp~~iF«q~7d.~ T 40~) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached: If a requirement has not been met, attach an explanation of why. At a minimum, a complete stonnwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan. provided on plans The underlying soils are permeable and non-compacted 7~/-fil• STU sP~fr ~n~ ~ ~~ 2- Swalecarries only stormwater flow ~P Y k No i a ~«~~~ Water table depth is greater than 1 foot. Plan details for the swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized by the responsible party is provided. ~~ !DWQ Project No, bS- /'7/ t)IVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: ~;vQL/.J~~vN-,¢~An~q-~vCE /ztT-io:yAti ,~~~P!'+2~; ~JNU/AY 6-2~~Xr-tn/S~atl/ Contact Person: ~~2lc S7'v^~P/> Phone Number. (`~~o) X763-SS.sv Swale ID: T~-c.-g~ ~ BQ~~-i~ ~Si~ S/~~c.~y v~2~ c./~c.k,N ~-~•.~ nip z8~{or- p/~~~ry~f!'jrN Gra`jss Sw~fe L ng~hE ~ G ~=F ~ ~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area 3~.-w ac. (on-site and off-site drainage to the swale) Impervious Area _ ~. ~' ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop II. REQUIRED ITEMS CHECKLIST ~`.~/ fps ~. ~ 7J fps 3: / ratio ,, .o v_ ~s~ fl/fl ~--4-u..rEs~vE~ (2 fps max.) (3:1 min.) (check dams may be used) KolSE L ESpED E Z,q. ~Sp~cl~icg77ar~ T 90!) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing aN BMPs and outlet structure details, a detailed drainage plan and a fulty executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Ptan provided on plans The underlying soils are permeable and non-compacted 7~~,4 sT-p sP~fr ~ri~ ~ ~~ 2 Swale carries only stormwater flow T'°P Y 4 ~a i c~ n v,~-cn~ .Water table depth is greater than 1 foot Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No. bS- ~%/ DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : (~ v ~ c l.J ~ ~, iv - ~ L,g w/ ~- ticE /.fit-y-i u rvA-c- A 1~~~ 27- ' ~t JN~/I-I !~ 6- ~1. ~ ~ XTr n/S~sN Contact Person: ~R~c S7-v•~r~ir Phone Number: j`~'lo) 763-S3.Sy Swale ID: T~-c-/3~" ~ BQ~~.ir~ 4S~o S~EU.~y v.e, ~/~c.k,N ~~....r N~ 285~or~ DRxt/ N ~i~3-J.!N Grass Swale Length J ~ _ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~-~~ •~ ac. (on-site and off-site drainage to the swale) Impervious Area ac. (on-site and off-site drainage to the sw21e) Max. Velocty from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop 11. REQUIRED ITEMS CHECKLIST ~: ~ fps 6 fps 3~ / ratio •. d0~~ it/ft (2 fps max.) (3:1 min.) (check dams may be used) Ko6E G ESPED E Z~ ~Sp~cJficq~-7r•~ T 90!) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafion of why. At a minimum, a complete stormwater management plan submittal incudes a worksheet for each BMP, design calculations, plans and specifications showing all E3MPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~~1~ Srn sP~Fr ~A-~n~ P ~~ 2- Swalecarries onty stormwater flow ?1DJ° Y & Nn i 6 r. v,F~, Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice ~~ annual mowing. The operation and maintenance agreement signed and notarized by the responsible party is provided. 'DWQ Project No.___ bS- ~ %/ DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following. information): Project Name : b v Q L /.J ~- ~, iv - ~ L,4 w~ ~ nicE /Zt-i;-i o niA-c. Contact Person: ~r2lc STv^?~'f/ Phone Number: Swale ID: Tv~-c.-f3~c-T ~ ,CgQ/!rf-!Tj QS~ ~ S~iELtxrY ~OR~}~N~i~J.rN ~~ ~,. ~ ~ ~o ~dN~~ ZAP 6- 2 ~ ~ xTr Ns~aA/ lO) '763-53Sv Grass Swa a Leng ~~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area 3 • • ac. (on-site and off-site drainage to the swale) Impervious Area -=+ ~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from.10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop 8. REQUIRED ITEMS CHECKLIST ~~ `f 2 fps `f . ~ fps 3: / ratio . a (12 ~~ fi/fi "7`q-t~~ F~ cyE~ (2 fps max.) (3:1-min.) (check dams maybe used) KoN E L ESPE'D E z,r~ ~Sp~c/Ficq~-7~.J T ~Je/) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete storrnwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/-ff} s~-p sP~fr ~ri~"~ /~ z Swale carries onty stormwater flow ~P y 4 Nd ; c~ .-~ n.Fc~to, Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice ~~ annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. 'DWQ Project No. 6.S- /'7/ ~ DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: bUQci,J~-~~v-~~Av~~-NCF /Zt7-iuniA-L Contact Person: ~t2 ~c S 7v•tir ~H Phone Number: 26 RJN~/AY 6-~-~~Xf r n/5~~~/ '6 3 -5s sv Swale ID: T~}-c-g~ ~ B/2~'Gt,~T ¢8~ o S/~~--u.~y DQ, ~/~ ~ ~,N U~.... N~ 28 5~~.~ D~2,~,N~rN Grass Swale L gtfi - - Z~ ~ Lf y "C~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~•; v tir , ac. (on-site and off-site drainage to the swale) Impervious Area =. ~5~~ ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop II. REQUIRED ITEMS CHECKLIST f . 2-~ fps ~~/ . ~ fps 3: / ratio ~ U ti~'ft/ft Tq-u-(=~cy~~ ,d ~~2~'i rz7- (2 fps max.) (3:1 min.) (check dams maybe used) KoP.,E L ESP~D E Z,eE ~SP~c~ficq~7a.r ?-90~) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attadted. If a requirementhas not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing a8 BMPs and outie# structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~~i>• ~U sP~Fr ~°ri~r~" 6'-~~ 2- Swalecarries only stormwater flow ~p Y & ,vo i c~ .Kn~, Water table depth is greater than 1 foot Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized-by the responsible party is provided. DWQ Project No. _. bS- /'7/ ~ DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: bvQL/.JG-7roN-s~L,QWI/+N~ R~-y-ionic}-c- T ~ fh_ ~~ Contact Person: E~21c S7'v-''? r'H Phone Number: f9lo) 76 3 -53 sv Swale ID: Tyi-c_g~ ~ ,BQ~Gt-if ~8~ ~ S/~EU.~y 3 i, yQS-.rr~ 3~ Grass Swa a Leng ' '~ ~~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area 3 =!~ ~ ac. (on-site and off-site drainage to the swale) Impervious Area = • 3 I ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop H. REQUIRED ITEMS CHECKLIST . I.33 fps (,. ~'V fps 3.' / ratio .4-~.rEscvE£ (2 fps max.) (3:1 min.) (check dams may be used) Kog~ G ESPFD E z,e~ ~SP~clf~cq~-7~.~ T-9oI) Inifial in the space provided to indicate the following design requirements have been met and supporting documentation is attak~ed: If a requirement has not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. Arr incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted 7~.4ff STD sP~fr ~A-~n~ P ~~ 2 Swale carries only stomtwater flow ~P y 4 ,vo; 6.•.P.~~ Water table depth is greater than 1 foot. Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. 3~ 6-Z~~xr-r //siarv DWQ Project No. bs- / ~/ / DIVISION OF WATER QUALITY -GRASSED SW;4LE WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : /,~„Q c /.J(r7v N -,¢L,g w1~N~` R~ti-,~.vA-c.. Contact Person: ~R /c S fv•~ ~'H Phone Number: Swale ID: T~-c-~3~- ~ BQ~~-iT ¢g~J .S/~~u,t*~• D~.~~,~~~!N ~ 3 , : -5:,.~,q-~~ 3 ~ 3~ dniu/I~y 6-2~~.t-Tr n~si~N !oi '76,3~S35v DQ, rnJ/ L M ~v G-~ni NG 28 ~/O Y" Grass Swale Length , • ~7 ~ ft. (at least 100 ft. per tribu#ary acre) Tributary Drainage Area ~> ~ ac. (on-site and off-site drainage to the swats) Impervious Area _ ; 3-o ac. (on-site and off site drainage to the swats) Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop It. REQUIRED REMS CHECKLIST . /~ ~ S~ fps. l.:..~ ~' fps 3: / ratio u.s? yS/ftlft ,.4 /.e~~ 27- (2 fps max.) (3:1 min.) (check dams may be used) KogE L ESPFD E Z~ ~sP~~~f«a,~r,~ T 90~) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached: ff a requirement has not been met, attach an explanation of why. At a minimum, a complete storrnwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal .package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/~A- STD sP~zrfr c.A-n~ P-/~ z. Swale carries only stormwater flow ?°P Y ` Nd i a ~~'~~, Water table depth is greater than 1 foot. Plan details for the swats provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No. bS-- l ~/l DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT INFORMATION (please complete the following. information): Project Name : i~ v Q c /.J ~ ~„ ~v - ,¢ ~q w/.~ n~C~' ~P~-z=-i u niA-c_ ,4 i2~~ rzT_ Contact Person: ~R/~ STv~''~~'/> Phone Number: Swale ID: Try-c-g~- ~ .QQ~Gf-jT Qg~~ ,S"y~-Y '!o /N ~/A ~~ 6-Z~~XTr NSroN 3 -53 Sl7 ~Q~ G/i~.k/vim-7n^i N~ Z-85~o~ Gra s Swale ength Tributary Drainage Area ,i~ ~ b fl. - : ac. (at least 100 ft. per tributary acre) (on-site and off-site drainage to the swale) Impervious Area = ~ ac. (on-site and off-site drainage to the swale) Max. Velocity from 2 Yr. Storm f ~ 3 ~o fps. (2 fps max.) Max. Velocity from 10 Yr. Storm ~ ~. ~.) ~ fps Min. side sbpes 3~ / ratio ($:1 min.) Steepest Effective Slope :~ w ~ `o v_Z~ ft/ft ~ (check dams may be used) Cover Crop "7 ~t-i-~-r~cvE£ KogE L ESPED E Z,~ 11. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, affach an explanation of why. At a minimum, a complete stortnwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and ouflet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal .package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/-fA- sT~D sP~rfr ~A~ri~! P ~~ 2 Swale carries onty stomtwater flow ~p Y F Nn i 6 ~ o~~ Water table depth is greater than 1 foot Plan details for the Swale provided. Plan details for the inlets and outlets are provided. Check dams provided. ,The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. DWQ Project No. bS- /'7 / I. PROJECT INFORMATION (please complete the following information): Project Name: ~v2L/nf(r71tN-,~` Lf3iM/-~-N~ R~-~-i~NA-c- Contact Person: ~lQ~c ST~^?~'ti Phone Number: ~~le/D:.~i~-JiN T~-~3~T ~ BQ~~.if ¢S~~ S/~EU.~y ,~.~ yB DIVISION OF WATER QUALITY • GRASSED SWALE WORKSHEET ~g 6- ti ~ t xrr /vs~a~v 'l~) '763-s3su D~2~ G/~ ~ k /.~ G-~n.r Nc- 2Q 5/0~ Gra s Swale Leng , ~ ~ ~~ ft. (at least 100 ft. per tributary acre) Tributary Drainage Area ~,~~7 ~ ac. (on-site and off-site drainage to the Swale) Impervious Area _ ~ ~ ~~' ac. (on-site and off-site drainage to the Swale) Max. Velocity from 2 Yr. Storm Max. Velocity from. l0 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop . f ~ ~- ~ fps. .t . `fi fps 3~ / ratio .~ os) Zs ft/ft "T~A-~~- DES c vE~ (2 fps max.) (3:1 min.) (check dams may be used) Kor3E' L ESpE~ E Z,e~ Sic ~ fi cq~7 r.~ T 90 ~) M. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why.. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Vegetation Plan provided on plans The underlying soils are permeable and non-compacted ~/~{if STD sP~rFr~-A~ri~C'-/~ 2 Swale carries only stormwater flow 7'P 5' F No i 6 ~ ~.~~~ Water table depth is greaterthan 1 foot Plan details for the Swale provided. -- Plan details for the inlets and outlets are provided. Check dams provided. The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice annual mowing. The operation and maintenance agreement signed and notarized. by the responsible party is provided. O !Z L_ Q O .~ O O U C (6 fQ Q C O t~ C .L m a m O N (L o ~ co l~ o r~ ~ ~ o ~ ~ ~ Q ~ o l~ cO CO ~t ~n cs, ~n ~ N to ~ O r 1` N ~ M ~ CO ~ ~ Q O O t1~ ~ ~t N M ~t M N `'- .- r ~- ~- r r r r r r ~ 4~- ti N ct' O O l1~ M O O ' d U r r I~ O L(') M ~ CD Lf~ M N ~ ~ a0 CO M I~ N 00 0 ~ N (~f U r O ~ ~ M N N M M N ~ _ U O ~ ~ ~ ~ O O ~ ~ ti ~ (~ ~ ~ to lC) d' d' M M M M ~ 0 0 0 0 0 0 0 0 0 0 O U ~ ~ C U ~~ 0 0 0 0 0 0 i L(7 L(~ ~ ' N I` i~ o O o O ~ o O a Q N N d ~t N N ~ O ~-. ~ to ~ In LC') L(7 lf) ~ lf~ In ~ N N N N N N N N N N O ~ 0 0 0 0 0 0 0 0 0 0 ~ ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ O O O ti O o0 O ~ ti ~ to O LL d' et ~ ~ ~ d' M CO CO d' J (~ ~ Q ~ lt7 M ~ f~ f~ ~ O ' I~ O lC) ~ ~L L. Q O ~ !~ O O M M M ~ M O N ~ M O ~ O M ~ N N Q m U ~ Q m Q m Q m 3 r r ~ ~ N N M M ~ ~ U O C O O I I U .-. M L ~ O ~ ~ O ~ ~ M U M Q- ~ N Q U II ~ II O U O U U N e! I I ~ ~ T Rating Curve for Triangular Channel - 1 Project Description Friction Method Manning Formula Solve For Normal Depth frtput Data Roughness Coefficient 0.030 Channel Slope 0.00250 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 10.00 ft'/s Rating Curve Plot 1.75 1.7 1.65 1.6 1.55 .-4 1.5 ~ 1.45 1.4 0 1.35 j 1.3 1.25 1.2 1.15 1.1 1.05 ~/Vorksheet: Triangular Channel - 9 Velocity (ftls) vs Discharge (ft'Is) z~. .aa,.,..,<,x., . . a.e,A .,,,.. ~. <e>aW ,av>,,. .a,,,<. .,~ , ~ _ _,_.xu ., ., ~ti. ,6 1 2 3 4 5 Discharge (ft3Js) 6 7 8 .~ - `t! ~ 3 ~' ~ ~~ Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 12!21/2006 4:33:30 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1