DWQ# 0 3 133c1 Date ?S Qty Who Reviewed: ftW.&k AWJI -'
Plan Detail Incomplete
? Please provide a location map for the project. -."U-] ?
Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan
Provide inl^orin-Ron eoncernlr-I -the s17-earn -{eahure- deptcicd at Ae North •casl eot'ne" Of I-Ae
? .
Please show all wetland impacts including fill slopes on the site plan. s tic plan W
? Please indicate all buffer impacts on the site plan. \
? Please indicate proposed lot layout as overlays on the site plan. Zp
? Please indicate the location of the protected buffers as overlays on the site plan. ?1Y'eD??r` Y?C ?`S
? Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan. (?? N fi Ic D ???.
Please provide cross section details showing the provisions for aquatic life passage:(W 1-k Cb'Q of vz)' )
Please locate any planned sewer lines on the site.plan.
? Please provide the location of any proposed stormwater management practices as required by GC
? Please provide detail for the stormwater.mmagement practices as required by GC
? Please specify the percent of project imper: iousness area based on the estimated built-out conditions.
JR Please indicate all storm,vater outfalls on the site plan.
14 Please indicate the diffu-c flow provision measures on the site plan.
? Please indicate whether or not the proposed impacts already been conducted.
Avoidance and/or Minimization Not Provided
? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional
information as to why it is necessary for this project.
? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the
Please revise 0,,e plans to avoid the impacts.
? This Office believes that the labeled on the plans ascan be moved or reconfigured to minimise the impacts to the
Please revise the plans to minimize the impacts.
? The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because
Please revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If it
is not possible to achieve diffuse flow through the entire buffer then it may be necessary to provide stormwater management
practices that remove nutrients before the stormwater can be discharged through the buffer.
Other
? The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please
provid: $ . This additional fee must be received before your application can be reviewed.
? Please complete Section(s) on the application.
? Please provide a signed copy of the application.
? Please provide copies of the application, copies of the site plans and other supporting information.
Mitigation
? of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The
plan must conform to the requirements in 15 A NCAC 2H.0500 and must be appropriate to the type of impacts proposed.
? Please indicate which 404 Permit the USACE would use to authorize this project.