Loading...
HomeMy WebLinkAbout20061909 Ver 2_More Info Letter_20070803W ATF9Q Michael F. Easley, Governor '0 G William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources O -? Coleen H. Sullins Director Division of Water Quality August 3, 2007 DWQ Project # 06-1909 vs2 Dare County CERTIFIED MAIL: RETURN RECEIPT REQUESTED #7007 0220 0003 1486 0806 Skyco Development, LLC Lee Tugwell 1 Sailfish Drive Manteo, NC 27954 Subject Property: Skyco Development, Ashbee Harbor Club Croatan Sound, 0301.51, 30-20-(2), SA, HQW REQUEST FOR MORE INFORMATION Dear Mr. Tugwell: On June 21, 2007 the Division of Water Quality (DWQ) received your application dated May 11 2007, to impact 0.072 acres of wetlands to construct the proposed residential subdivision and 46- slip upland marina. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 21-1.0506. and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Flushing Model The permit application information included a narrative and graphics about the flushing model that was generated by the consultant but failed to include the technical data for the resource agencies to review. Please provide all the technical data utilized during the modeling study so the DWQ can review that information to determine if that data is sufficient. North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarolina A -1?t_...-//.. 2. Submerged Aquatic Vegetation (SAV) Survey Please provide an SAV survey for the access canals A and B. This survey should be conducted for the entire length of the canals out into the Croatan Sound to a minimum of the -6 foot contour in the ingress and egress alignment of the proposed boating traffic. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information. Please contact me in writing and Ian McMillan of the DWQ Central Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands or waters of the State. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ian McMillan at 919-733-1786 or Kyle Barnes at 252-948-3917 if you have any questions regarding or would like to set up a meeting to discuss this matter. incerely, Al odge upervisor Division of Water Quality Surface Water Protection Washington Regional Office cc: 401 Oversight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy Central Files CAMA/ Morehead Brian Rubino, Quible and Asso. PO Drawer 870, Kitty Hawk, NC 27949 Filename: 06-1909 vs 2