Re: Reply to the Division of Water Quality's February 12, 2004 Request for Further
Information for the proposed Ballentine Subdivision (Phase 5-7), Wake County, North
Carolina
Dear Ms Karoly:
This letter is in response to the letter from your office dated February 12, 2004 (copy
attached), which requested additional information for the proposed Ballentine Subdivision.
The following restates your questions as shown on your letter and then provides our
response.
1. Please provide the location of any proposed stormwater management procatices
as required by GC3402, in particular, indicate the location of all level spreaders
on the plan and provide the calculations.
I thought this item was addressed in our initial application. We provided your office Poi
t
with a full scale drawing of the stormwater drainage and outfalls as well as the
calculations. Please call if you need additional explanation.
2. Please specify the percent impervious based on estimated built out conditions.
See the attached calculations from the engineer.
3. Please indicate all stormwater outfalls on the site plan, especially at the road
crossing. \
Again, we provided your office with a set of full scale storwmwater drainage plans for
the site and felt that this item was addressed in our initial application.
Charlotte Office:
236 LePhillip Court, Suite C
Concord, NC 28025
Phone: (704) 720-9405
Fax: (704) 720-9406
Greensboro Office:
3817-E Lawndale Drive
Greensboro, NC 27455
Phone: (336) 540-8234
Fax: (336) 540-8235
Hickory Office:
622 Coon Mountain Lane
Taylorsvilte, NC 28681
Phone: (828) 635-5820
Fax: (828) 635-5820
FILE CUPY March 9, 2004
S&EC Project # 3651.W1
DWQ# 04-0165
4. Please indicate whether the proposed headwalls are included with the proposed
total .....
y
11
The proposed impacts include the headwalls and any disturbance to the channel itself 1. `r'
due to culvert or rip-rap. ? ? SV tj
5. Please indicate location of previous impacts........
We included an 8.5x11 of the entire site depicting all of the previous impacts for the G
earlier phases. r ., p
Please call if you have any questions or require further explanation.
Sincerely,
Todd Preuninger
Attachments: 1) DWQ letter dated February 12, 2004
2) Impervious Calculations
2
Ballentine Farms - Phase 5, 6 & 7
W&R Project # 203175.00
Impervious Surface Calculations
Total area within Phase 5, 6 & 7 52.34 AC
30% max impervious 15.70 AC
683,979 SF
Subtract Planned Impervious Area
Area within Curb & Gutter 177,842 SF
Area within sidewalk 33,176 SF
Remaining Impervious Surface Area 472,961 SF
Impervious Surface per lot (156 Lots) 3,032 SF