Loading...
HomeMy WebLinkAbout20061147 Ver 1_Approval Letter_20060713Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 6, 2006 Paul P. Struhar Banner Elk Vista Properties, L.L.C. Post Offive Box 1685 Boone, NC 28607 Subject Property: Vistas at Banner Elk Banner Elk, Avery County DWQ Project # 06-1147 Avery County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Philips: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 30 linear feet of streams for the purpose of property development at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 13, 2006, and modified information received October 5, 2006. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, stormwater, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the culverting activities described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands One NorthCarolina Natura!!rf An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Vistas at Banner Elk Page 2 of 7 October 6, 2006 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference UT to Whitehead Creek 50 Linear Feet New impacts (perennial) UT to Whitehead Creek 195 linear feet New Impacts (ephemeral) UT to Whitehead Creek -20 linear feet Culvert Removal UT to Whitehead Creek -75 Linear Feet Culvert Removal 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Vistas at Banner Elk Page 3 of 7 October 6, 2006 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream (intermittent or perennial). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 7. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. 8. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. Continuous monitoring by onsite, calibrated, continuous recording, equipment must be performed both upstream and downstream of any instream work. The results of this monitoring must be submitted along with the below required stability monitoring. Additionally, should the results indicate a violation of the turbidity standard, all work shall cease until such a point the measures are implemented to protect surface waters form further violations. I Vistas at Banner Elk Page 4 of 7 October 6, 2006 9. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 10. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCG010000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o. enr. state. nc. us/su/Forms Documents. htm. 11. Deed Restrictions Deed restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. 12. Temporary Fills All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed and bed profile after construction is complete or within 6 months of the establishment of the crossing, which ever is sooner, and the various sites shall be stabilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, additional written approval from this Office must be obtained to modify this condition. Vistas at Banner Elk Page 5 of 7 October 6, 2006 13. Culvert Installation Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plans with adequate details that indicate that the current stability of the stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. 14. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 15. Culverts that are less than 48 inches in diameter should be installed with 20% of the diameter of the culvert placed below the level of the stream bottom to allow the accumulation of stream bed materials and to facilitate aquatic life passage during periods of low stream flow. Larger diameter culverts should be placed 1 foot below the stream bottom. Culverts should be placed in the main flow channel (i.e. thalweg). Partial burial of culverts in this manner also may require increasing their size to accommodate flow requirements. 16. If concrete is used during construction (e.g., headwalls), a dry work area must be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts live concrete should not be discharged to surface waters due to the potential for water chemistry change and a fish kill. Vistas at Banner Elk Page 6 of 7 October 6, 2006 17. Rock, sand, or other materials should not be dredged from the stream channels except in the immediate vicinity of the crossings. Instream dredging has severe effects on aquatic life and disturbance of the natural form of the channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the channels adjacent to the crossings should not be modified by widening or changing their depths. 18. Sandbags, flexible pipe, or other diversion structures should be used to avoid excavation in flowing water. Materials used for flow diversions should be removed from the stream bed after completing the construction work. Any diversion channels must be lined with fabric and/or rock. 19.Any riprap placed for inlet or outlet stabilization should be clean and limited to the stream bank below the high water mark and vegetation should be used above. Rip rap must not be placed in stream channels in a manner that obstructs fish passage. 20.All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. 21. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 22.All jurisdictional waters on the site shall be inspected weekly for stability (longitudinal profile, cross sectional dimension, and pattern) and a monthly report submitted to the Asheville Regional Office within 15 days of the end of each month during the term of construction on site. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Vistas at Banner Elk Page 7 of 7 October 6, 2006 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Kevin Barnett in the DWQ Asheville Regional Office at either Kevin. Barnett(a-ncmail.net or at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW Klkhb Enclosures: GC 3402 Certificate of Completion M. Dale Pennell, McGill Associates, P.A. USACE Asheville Regulatory Field Office DWQ 401 Central Office Ron Linville, NC Wildlife Resources Commission File Copy Central Files Filename: 06-1147.VistasatBannerElk. approval