Loading...
HomeMy WebLinkAbout20041246 Ver 3_Other Documents_20070309Michael F. Easley, Governor `-1 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Mr. Mike Pettyjohn, P.E. Division Engineer N.C. Department of Transportation Post Office Box 250 North Wilkesboro, North Carolina 28659 Alan W. Klimek, P.E. Director Division of Water Quality March 6, 2007 T ??OS44, ,s, .F . O1 ?Tc cy Subject: Inspection US Highway 321 DWQ Project No. 041246 TIP No. R-2237B Caldwell County Dear Mr. Pettyjohn: On February 28, 2007, I visually inspected the construction work on US Highway 321 in Caldwell County and the project appeared to be in good shape. It appears that the construction work is progressing mainly at both ends and at a small section near the middle of the project. The erosion and sedimentation control structures, vegetative covering, mulching and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828.296.4500. Sincerely, Michael R. Parker Environmental Specialist Attachment cc: Frank Gioscio, P.E. Heath Slaughter, Division 11, DEO Neil Trivette, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Internet; www.ncwaterquality.org OF W ATFR r ?G NorthCarolina Naturally Phone (828) 296-4500 Customer Service FAX (828) 299-7043 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer 10 DWO Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: February 28, 2007 County: Caldwell Region: Asheville DOT Division: Division 11 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401#:1 041246 NW Permit IP 3481 Project Name: Location of Project: U S Hi hwa 1321 Widening US 321 approx. 5 miles North of Lenoir to South of Blowing Rock, NC Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization X? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? Buffer Restoration ? Bank Stabilization X? Other Additional Wetland Impacts: ? yes If no, estimated date of completion: Water Ouality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Other X? no ? Zone 1 Est Acres Additional Stream Impacts: ? yes X? no Estimated linear feet of impact: Estimated Acres ? Zone 2 Est Acres Est Linear feet Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited ? ? Name of Waterway(s): Basin/ Subbasin: DWO Site Visits for DOT Proiects Background Info Rocky Cove Creek, Greenfield Branch, unnamed tributary to Puncheon Camp Creek, unnamed tributary to Right Fork Mulberry Creek, unnamed tributary to Left Fork Mulberrv Creek CTB -030531 Yadkin-030701 Wetland Type: ?Isolated Stream Class: ?Class B X?Class C X?HQW x?Non-Isolated (Waters of US) ?303d Listed ?WS-lI ?WS-V ?SB ?ORW X?Trout ?WS-III ?NSW ?WS-I X?WS-W ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: ?0 - 1/10th acre X?I/11th to 1/3`d acre 0.16 acres ? 1/3`dto 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet Additional comments: Compliance Issues Identified: ?Yes X? No Compliance issues identified: ?Yes ?No If yes, complete the section below: Project appeared to be in good condition. Sediment and erosion control program appears to be in good shape. Seeding, mulching and matting are progressing in construction areas that have been completed. All fill areas appear to be in good condition. The main work area is the large rock cut, at the S-curves, near the top of the project. A new fill area next to the roadside stand was being cleared of vegetation. Most of the fill in the middle of the project is complete except for the site near the Y line of Waterfalls road. The contractor is now working at the lower end of the project and is filling on the west side of US 321. Need to maintain sediment and erosion control devices and continue with seeding and mulching.