Loading...
HomeMy WebLinkAbout20041526 Ver 1_Staff Report_20061019Staff Report Project Num: 20041526 Name: NCDOT - Sr 1322-A County: Caldwell Location: Ut Husband Creek Gamewell Latitude: +35°52'49" SW Plan Location: Owner: NC DOT Division 11 Contact Person: Tippett, Lyndo Inspection Date: 10/19/2006 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Phone: 828-296-4500 Question Areas: Site Visit Inspection Summary: NCDOT is requesting a modification to WQ Certificatin No. 04-1526. They are asking for an additional eight (8) feet of impact and dewatering of an unnamed tributary to Husband Creek Class "C" waters. It is recommended that WQ Certification Nos. 3366 and 3404 be issued. The 401 Certification was issued on October 23, 2006. ?550 P-,)c0 Version: 2 Status: Issued Project Type: Pipe extension Region: Asheville Longitude: -81°38'15" Title: Phone: Entry Time: 09:40 AM Exit Time: 10:15 AM Inspection Type: Staff Report Page: 1 Project Num: 20041526 Owner: NC DOT Division 11 Inspection Date: 10/19/2006 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Yes No NA NE Do impacts described in the application differ those seen in the field? ? M ? ? If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ? 0 ? ? If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ? 0 ? ? If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ? M ? ? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? 0 ? ? ? Are there additional stromwater conditions that should be required due to the following classifications: ? M ? ? # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ? 0 ? ? # If yes, what phase is this? Are there prior impacts from prior phases? ? M ? ? If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: Page: 2