Loading...
HomeMy WebLinkAbout20050196 Ver 1_Application_20050128D WQ_ Cop 05019 6 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: FAVI" ls???s I t ?_t. Division of Water Quality Wetlands Unit 1650 Mail Service Center n Raleigh, NC 27699-1650 D BkOWWR 5 1. Applicant Information JAN 2 8 2005 1. Owner/Applicant Information DENR - WATER QUALITY WETLANDS AND sTORMWATER BRANCH Name: MR. SCOTT OSTEEN Mailing Address: 107 MOUNTAIN STREET BLACK MOUNTAIN, NC 28711 Telephone Number- _828-669-5341 Fax Number: E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: MRS. SUE HARMON Company Affiliation: PERMITS, ETC. Mailing Address: POST OFFICE BOX 234 BOILING SPRINGS, NC 28017 Telephone Number: _704-434-0706 E-mail Address: -Permitsetc@carolina. rr. com, H. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. Fax Number: 704-434-7100 1. Location SCOTT OSTEEN County: MCDOWELL Nearest Town: NEBO Subdivision name or site address (include phase/lot number): LAKEVIEW HILLS / PHASE 1/ LOT #7 Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): FROM MARION TAKE HWY 70 EAST / TURN LEFT ON HWY 126 EAST / TURN LEFT ON CEMETERY RD. / TURN RIGHT ON WILDLIFE RD. / TURN LEFT INTO LAKEVIEW HILLS / FOLLOW SIGNS TO OWNER'S LOT 2. Describe the existing land use or condition of the site at the time of this application: THIS IS A VACANT, SOMEWHAT WOODED LAKE LOT. 3. Property size (acres): 0.38 ACRES 4. Nearest body of water (stream/river/sound/ocean/lake): LAKE JAMES 5. Describe the purpose of the proposed work: TO STABILIZE THE ERODING BANK ALONG THE ENTIRE SHORELINE OF THIS LOT WITH RIP RAP. THE SHORELINE LENGTH, APPROXIMATELY 95 FEET, WILL HAVE RIP RAP APPLIED TO IT. THE RIP RAP WILL BE APPROXIMATELY 7 FEET IN HEIGHT. 6. List the type of equipment to be used to construct the project: A BARGE, A BACKHOE AND HAND TOOLS 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: 2 FT. X 95 FT. = 190 SQUARE FEET_ 8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: NONE. 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance): NO TREES WILL BE REMOVED. NO EQUIPMENT WILL BE USED IN THE BUFFER AREA. Applicant/Agent's Signature 4 Daft 0 (Agent's signature is valid only if an authorization letter from the applicant is provided.) Sr Ot 05feen Ldeyiete galSlPh, I / W4 7 Nebo N J 20 Lake (Full Pond) Full Pond Shoreline Please approximately sketch the following information on this plan (please provide dimensions for each item, such as 10 ft. x 100 ft.): 1) All proposed vegetation clearing (provide dimensions) 2) Location of rip rap or fill to be placed above the "Normal Pool" elevation 3) Location of rip rap or fill to be placed below the "Normal Pool" elevation 4) The location of any proposed structures such as buildings, retaining walls, docks, etc. 5) The location of any excavation or dredging below the "Normal Pool" elevation 6) Location of construction access corridors R t V ap \? Lakeward ?cal? I inch = 35 feet' 5catf O sten La&vie,w Bills / Ph.I ILDr Nebo, NIC X8'14! -- 'ecf will be, d ono X'S• Show 16 ca#3on of aWrom mattly 95 liocor . b bay ? s ?4 ' '-Fcc+ of tips n hc?9ht 12 t f ry 7 r ` i? 7 T +V 1V??tA? \v^ \+ n t?, iaq C C - T; a J ?41 r. / 4L © T r ,I Cu \1 Z? ?^ D f w :)C ?1 ? ^? J V' l \ r d di0:21) SO E2 Uer Nebo area, NC Scott Osteen / Lakeview Hills / Lot 7 ?4 5L, 3 Copyright O 1888-2001 Microsoft Corp. and/or its suppliers. All rights reserved. http:!/www.microsokoomisfrsets O Copyright 2000 by Geographic Daft Technology, Inc. All rights reserved. O 2000 Navigation Technologies. All rights reserved. This data includes information taken with permission from Canadian authorities 0 Her Majesty the Queen in Right of Canada. 0 Copyright 2000 by Compusearch Micromarksting Data and Systems Ltd. 5c0++ Osten Lat. i-'v?e-w MIS / Ut 4f I To: North Carolina Division of Water Quality I give Sue Harmon, of Permits, Etc., permission to sign as my agent on my application for shoreline stabilization. Signature (s) Date / /6 ?S Sco+t O s+ee n La*view NillS / Lot *I Lot 7 Ok Duke Powen January 5, 2005 Ms. Cyndi Karoly NCDENR Division of Water Quality 2321 Crabtree Boulevard Raleigh, North Carolina 27604 RE: Scott Osteen Lakeview Hills subdivision / Lot #7 Nebo, NC 28761 McDowell County Dear Ms. Karoly: DUKE POWER P.O. Box 1006 Charlotte, NC 28201-1006 At the owner's request for shoreline stabilization, I have made a site visit to the above referenced lot. This proposed project meets the guidelines of Duke Power's Shoreline Management Plan. I will be happy to review this application for shoreline stabilization. The application must include approval from your agency and the U.S. Army Corps of Engineers. Please call me if you have any questions at 704-382-8577. Sincerely, ?L'°--L 1CLUM? J. Wade Harmon Lake Management Representative www.dukepower.com N N N N N N N N N N N N N N N N N N N 0000000000000000000 0000000000000000000 Cn Ul Cn Ul CT7 Ul Ui CJl 0 N m N Ul A A Cn +1 Cn A j 0111 j- O 0 ?ONN-,x101 NO- Dh ?Ul"K) "Ol-s000COCO CA W? W W CIR CA -+ -4 " OD p 44, W M 0 )0 0 1 0 0 NWUlCO-4 M W CT W M M M M iCANO c7) cn 3 c m chi n o cDD o o 03w003 LD•w<<N 90 -.0 0 MODG)a KC CD Z- 53 0 (n (m =3 m w m c ?? m? CD <.? =3 90 Q CD MCC D o CL cn cn mcD ° °ca CD CO ?o CD 0 CD QDCD pc -o -n OU CD ;Z 0 O ?'_ CD Cn n ai cn _0 O O N N N O CO O r w r 0 < CD -n O CD C 0 < O c D CD - CD M CL M =r 3 0-0 =r cc CD O w w CD << < O n < C- C/) 0 CD CA ;rN M j C = Q CD 0 CD ... cn :3 Z N n w 0 N sv X M D cn 1 O Cn -1 V O O Cp 1 N N CA Cn CO -4 M N N N N i N N N -• N N CJICDCrto W-4 W W W M W-M-40Cn?J N N N N N N N N N N N N N N N N N N N 0000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V l Cn Cn cn (n cn U7 cn Ul cn U, N cn .0, A Cn A Ul A 0M-a ?M_<cn to cn ?O y 5 cn MMcn ' O O C C C C C C C C C _ C'p D 0 Q Q Q Q Q Q a a 3 3 Q O N N CD a CD CD O Q? T?Q COD QQ Con 0 m 0 N 0- CD c(n CD a CD 7 n n 2 0 0 7 3 3 QQ 3 3 n "a 'a , - O CD CD D CD CAD N CD CD O CD CD a' a a -• CD ? X