Loading...
HomeMy WebLinkAbout20140404 Ver 1_W-5203L REVISED Permit Drawings 071116_20160715� 0 N � I s-p See Sheet �-A For I ndex of Sheets 1�OT TO SCALE T 0 US l7 4025 MILES �s .� �G BRIDGE `� 1515 � Ferrv Q.,, ����� � ����� ������I ����� ��� ���� �, LOCATI01�: ���� ���� P e rm i t D raw i n g S h eet 1 of 4 Revi sed 7/ 11 / 16 SR l�18 /SR l�19 (OLD FOLI�ST01�E R OAD /CO U11 tTR Y CL UB R OAD) FR OM 1�1C 210 TO SR 1515 (S1�EADS FERR Y R OAD) TYPE OF WORI�: GRADII�G, DRAII�AGE, WIDEI�II�G FOR PA T�ED SHOULDERS, A11tD THERMOPLASTIC PROFILED PA VEME11tT MARI�II�G LI11tES, ETC. PROJECT W -5203L WETLANDANDSURFACEWATERIMPACTS PERMIT 1�OTE: METHOD III CLEARII�G SHALL BE USED 01� THIS PROJECT SITE 4 20386 = STQo 21+35038 � l ,LIo �.� fUUoUU COIUSTRUCTlOIU 1�OT TO SCALE GRAPHIC SCALES ADT 5,100 — 2013 PROJECT LEI�GTH Prepared i� the OffTce of: STATEI OF 1VORTH GCAROLIIVA MAP 11t0.1 = 0.540 MI. DI VISI01� OF HIGHWA YS 0 50 �oo DESIGI� SPEED = �qP 1110. 2= 0.150 MI. 5501 Barbados Blvd., Castle Hayne, xc 28429 � � SO-60 MPH 7�,�A n 7�� ,,,," ",,,, _. �� � LYll1l- 1�( 0. 3 = 1.696 MI. 2012 STANDARD SPECIFICATIONS ����,'�H �qRO,����� PLANS FU1�C. CLASS = MAP 1�0. 4= 0.182 MI. DAVID B. LEONARD PE :•'`,,�°�°��SS�o�9�9,'-•': MAP 1�0 S= 0 087 MI ' .:�� �. . Q ZO 4O MAJOR COLLECTOR � _ � � RIGHT OF WAY DATE: PROJECT DESIGN ENGINEER ' SEAL � _ _ - MAP 1�0. 6— 0.047 MI. : 037439 ; MAP 1�0. 7= 0.234 MI. CARLA M. SCHOONMAKER �'�,°q� FNGINE���'��.�`' PROFILE (HORIZONTAL) L►��P L�(O. O = 0.286 MI. PROJECT DESIGN TECHNICIAN ���i���.•8����EO;���, 5 10 MAP 1�0. 9= 0.205 MI. LETTIII�G DATE: ���"'���� � % JONATHAN W. MITCHELL MAP 1�0� 1 0 � 0.165 MIi � O /� 0� � DIVISION DESIGN ENGINEER PROJECT DESIGN TECHNICIAN PROFILE (VERTICAL) TOTAL = 3.592 MI. IMPACTS LEGEND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY I M PACTS I N S U R FAC E WATE R TEMPORARY IMPACTS IN SURFACE WATERS - RETAIN � � " P '�/ C .�6�00 �--� �� ,,�� l`�.t � _��� �l ) �`A) �� � TEMPORARY IMPACTS IN SURFACE WATERS l" 20' �llXl�� �IIoO�S � NV=� 4025'� �� - �� �-� � �J ��a�� ;_��, 0504> � �IIOODS �? 0 � � �� � �� � �' �� �� ���-'� � � Ex�s � ��� Ri�v Pe rm it D rawi n g S h eet 2 of 4 Revi sed 7/ 11 / 16 �" =��C PqSSED QROU�ID CU��ERT W T � % i� % �:� 19 � LC% iL �Lh� � � U%'�� � /�(�,�I L� ( �� �>` �� .�� �00 .�� . ���- '— �v=��o4�� _ -- _- -- _- -- -- � ��" �MP � �xisTi�� �i�v CO��Co MONo � � j�--�__ � \ �� �� < ���050 MPACTS IN �'URFACE WATERS �� � � �- 0 � � o � �=2���I0 ' SPECIAL CUT DITCH GRASS LINED SEE DETAIL 'A' WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 2 Sta. 36+57 to 36+63 8.00 14.00 Collar and extend existing 24" crossline pipe and add additional 24" crossline pipe 4 Sta. 64+41 to Sta. 64+48 Collar and extend existing 24" <0.01 * crossline pipe and add additional 24" crossline pipe TOTALS*: <0.01 8.00 14.00 *Rounded totals are sum of actual impacts NOTES: * Approximately 70 sq. ft. of permanent suface water impacts to the tributary 2013 10 24