HomeMy WebLinkAbout20050785 All Versions_Email_20061023[Fwd: Re: Temporary Barge/Impacts]
Subject: [Fwd: Re: Temporary Barge/Impacts]
From: "Jacqueline Emmaline Armstrong, EP <jearmstrong@dot.state.nc.us>
Date: Mon, 23 Oct 2006 17:30:49 -0400
To: "DCM - Thomas, Mike" <Mike.Thomas@ncmail.net>,
Steve.Sollod@ncmail.net, bill.h.brazier@uscg.mil,
william.wescott@usace.army.mil, brian.wrenn@ncmail.net.r
To all:
I sent the email below last week to our Contractor working on
R-2510B Washington Bypass. However, I did not email this to you
all. If I stated anything incorrectly, please let me know-and I
will notify the team. I apologize for the oversight.
Thanks!
Jackie Armstrong
-------- Original Message --------
Subject: Re: Temporary Barge/Impacts
Date: Wed, 18 Oct 2006 15:30:00 -0400
From: "Jacqueline Emmaline Armstrong, EI"
<jearmstrong@dot.state.nc.us>
Organization: North Carolina Department of Transportation
To: Flatiron - Paul Newman <PNewman@flatironcorp.com>,Flatiron -
Jamie Hampton <jhampton@flatironcorp.com>,"Earthtech - Shearin,
Tom" <Tom.Shearin@earthtech.com>,Earthtech - Ron Johnson
<ron.Johnson@earthtech.com>,LeiLani Paugh
<lpaugh@dot.state.nc.us>,"Ed Eatmon, PE"
<beatmon@dot.state.nc.us>,"Rodger Rochelle, PE"
<rdrochelle@dot.state.nc.us>,"Teresa Bruton, PE"
<tbruton@dot.state.nc.us>,"Anne D. Gamber"
<agamber@dot.state.nc.us>
References: <453647C9.BFODBE6B@dot.state.nc.us>
Paul,
I spoke with Brian Wrenn, William Wescott, and Steve Sollod
today.
They agreed it would be beneficial to include a narrative about
the
temporary water operation with the barges. They do not need a
sketch, but if you feel it is better to include it, then please
do so
(Steve indicated that the DCM might ask for a sketch if they
determined it was necessary). Additionally, William indicated
the
Coast Guard would be permitting the barge. I suggest we make
Bill
aware of the operation and verify the details he needs concerning
1 of 2 10/24/2006 11:16 AM
[Fwd: Re: Temporary Barge/Impacts]
the
barge. If you have any questions, please let me know.
Jackie
Jacqueline E. Armstrong, EI
Design Build Engineer
NCDOT Alternate Delivery Unit
919-250-4128 ext 230
2 of 2 10/24/2006 11:16 AM