Loading...
HomeMy WebLinkAbout20081562 Ver 1_Application_20160711PAI® ' LMG �° �- LAND MANAGEMENT GROUP INC Environmental Consultants July 711, 2016 TO: Mr. Chad Coburn NC Division of Water Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Asset Storage; Belville, NC (Brunswick County) 401 WQC Application (GC 3890) DWQ Project# 08-1562 Dear Chad: Enclosed is a 401 WQC application for your review. This application is submitted on behalf of Anne Sorhagen with Asset Storage, LLC for the construction of Phase 2 of a mini -storage facility located off of Blackwell Road in Belville, NC. The applicant is proposing to construct two mini -storage buildings, an outdoor storage area, and associated access ways. Because of the extent and location of wetlands within the site, impacts to 0.31 acre of wetlands are needed. To mitigate for these impacts, the applicant proposes to buy 0.3 acre of non -riparian wetland credits from the Lower Cape Fear Umbrella Mitigation Bank. Note that the applicant obtained a NWP 39 in 2009 and in 2011 for the project. However, because of the economic downturn, Phase 2 was not constructed and no impacts occurred. Enclosed are the PCN form, site maps, site plan, and previous permits for your review. The DWR application fee has been submitted to your Raleigh office. Please let me know if you have any questions or need additional information. Thank you for your assistance with this project. Sincerely, _ lim Williams(^, Environmental Scientist Encl. cc: Ms.� Anne Sorhagen, Asset Storage Ms.'Jennifer Burdette, NC DWR www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Avenue, Suite 15 • Wilmington, NC 28403 OHO, WAr!99 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: -7 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name of project: Asset Storage 2b. County. Brunswick County 2c Nearest municipality / town: Belville 2d. Subdivision name: I M01 2e NCDOT only, T.I.P. or state project no, N/A UL 1 1 Z�js 3. Owner Information 0EQ- M1 w. A7ER OFSP 3a. Name(s) on Recorded Deed: Asset Storage LLC R pRcE 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable)* Anne Sorhagen 3d. Street address- 9820 Blackwell Road SE 3e. City, state, zip: Leland, NC 28451 3f. Telephone no. 3g. Fax no.. 3h Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from ow" ne"r)' �,4a.- Applicant is:, �' - Agent E] Other, specify: J ,� ame: 4c -:Business name' " ,','(if applicable); 4d. address:- : h -"Street 4e. City �oqa ,-" zip: „- 4f. Telephone;no , � 4g Fax'no.., 4h. Emaikaddress:, 5. Agent1co'nsuliantIni rmation;(if,applicable)' . - _ 5a. Name:`` T,,: 5b. Business name: .'Land"Management Group;,lnc,� (if applicable): _ ,, 5c. Street add're'ss':."',380511 ddhtsville Avenue, Suite 5d. City; state, zip. ' �4,±';�, v, -W lmington, NC 28403 5e Telephone `no::' (910),452-0001 ` 5f Fax no. �, ti r „. (910) 452-0060 , 5g Email address ry rkwi7IIij9mi@lmgr6up'.neV," Page 2 of II •Y I)�... ��'� _r V__t"` - _.f �; _' � �,�_ �� � 'rte , �-" .o, -.f i � �. -r o-.i,�.. ,-}',.��- �`'- B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0380003002 1 b. Site coordinates (in decimal degrees): Latitude- 34.223372 Longitude: -78.007879 (DD DDDDDD) (-DD DDDDDD) 1 c. Property size, 6.4 ac 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Jackeys Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C; Sw 2c River basin: Cape Fear 03030005 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site currently supports a mini -storage facility. 3b. List the total estimated acreage of all existing wetlands on the property: 0.5 acre 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to construct Phase 2 of the existing mini -storage facility by adding two buildings and access ways in order to meet the storage needs of the residents of Belville. 3e. Describe the overall project in detail, including the type of equipment to be used: Phase 2 of the project consists of the construction of two additional mini -storage buildings (11,970 sf and 17,050 sf), an outdoor storage area, and associated access ways. An existing stormwater pond located in the northern part of the site will also be expanded. Track hoe, loader, dump truck, bob cat, and other standard construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property 1 ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ preliminary ® Final of determination was made? 4c. if yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Paul Farley Land Management Group, Inc. 4d If yes, list the dates, of the Corps jurisdictional determinations or State determinations and attach documentation. John Policarpo of the USACE verbally approved the wetland line on 5/24/16 (Action ID# SAW -2008-2987). This was a renewal of a previously approved line for a larger site 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. In 2009, the applicant obtained a NWP 39 and 401 WQC to impact 0.31 acre of wetlands to construct two storage buildings. An extension to the NWP was issued in 2011. The economy slowed down and only the first building was constructed, which did not require wetland impacts. The site plan has been modified slightly from one additional building to two smaller buildings. Wetland impacts remain the same. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a Is this a phased project? ® Yes ❑ No 6b If yes, explain. The proposed project consists of Phase 2 of the Asset Storage project. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply): ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ®P ❑ T Fill/Grading Non -Riparian ® Yes ❑ No ® Corps ® DWQ 031 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 031 2h Comments. 3. Stream Impacts N/A If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Open Water Impacts N/A If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 0. Total open water impacts 4g. Comments: 5. Pond or Lake Construction N/A If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no. 5i. Expected pond surface area (acres): 5j Size of pond watershed (acres), 5k. Method of construction: 6. Buffer Impacts (for DWQ) N/A If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse El Tar -Pamlico ❑Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ❑ PEI T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization - 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts were minimized as much as possible through careful site design. The extent of wetlands within the site made avoiding all wetlands impossible. Impacts are limited to the construction of one of the mini -storage buildings and access ways, which will impact 0.31 acre of wetlands. During the first NWP application for this project, the site plan showed 0.46 acre of wetland impacts. However, the project engineer reduced the size of the second building and associated vehicular access ways This reduced wetland impacts to 0.35 acre. The site plan was revised again to include the construction of retaining walls, which further reduced wetland impacts to 0.31 acre This was a 33% reduction in impacts 1 b. Specifically descnbe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fencing will be used during construction to reduce sediment from eroding into adjacent wetland areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ® Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Lower Cape Fear Umbrella Mitigation Bank 3b. Credits Purchased (attach receipt and letter) Type: Non -riparian Quantity: 0.3 ac 3c Comments: 4. Complete if Making a Payment to In -lieu Fee Program N/A 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only): square feet 4e Riparian wetland mitigation requested: acres 4f Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments. 5. Complete if Using a Permittee Responsible Mitigation Plan N/A 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ N/A 6a. Will the project result in an impact within a -protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b.' If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact - Multiplier Required mitigation (square feet) (square feet) Zone 11, 3 (2 for Catawba) Zone 2 1.5 - 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,' permittee responsible riparian buffer restoration, payment into,an approved in -lieu fee fund) ; 6h. Comments - Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan N/A 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 77% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Project engineer obtained a stormwater permit from DWR in 2012 (SW8 071002). ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Brunswick County ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ® Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply)- ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review N/A 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9of11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project will not provide access or utilities to adjacent properties. No additional wetland impacts are expected within the site. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater generated by this project ties into the local municipality's system. Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program GIS layer was used to determine the presence of federally-listed species. No federally-protected species are known to occur on or within a one mile radius of the project area. 6. Essential Fish Habitat (Corps Requirement) 6a Will' this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat. The project area is not considered EFH or HAPC for any species. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS mapping resource was used to determine the presence of cultural or historic resources. No cultural or historical resources were noted within the site 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100-year floodplain. Kim Williams f- 7/7/2016 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 AGENT AUTHORIZATION FORINT TO WHOM IT MAY CONCERN: 1/we, the undersigned, hereby authorize Land Management Group, Inc. (LMG) to act as our agent in the determination of jurisdictional wetland boundaries on the subject property, 9820 Blackwell Road . By way of this form, I/we additionally authorize access to the site by representatives of the US Army Corps of Engineers (COE) and the NC Division of Coastal Management (NC DCM) for the purpose of reviewing the flagged wetland boundary and providing a final jurisdictional determination. Any questions regarding the jurisdictional determination should be directed to LMG. Please provide the following information: Property Address and Parcel ID Number: 0380003002 Current Property Owner Name: Owner Address and Phone Number: Asset Storage, LLC 9820 Blackwell Road; Leland, NC Please answer the following questions (circle Yes or No): 1. Are you the current owner of the property? Yes or No 2. If you are not the current owner, do you have a option to purchase or a contract to purchase that allows for environmental due -diligence including the determination of wetlands? Yes or No 3. If you answered no to the questions above, do you have an existing easement? Yes or No Name of Individual/Entity: -5:!:- Signature :!:-Signature of Authorized Representative: Date: wAw.lingroup.net o Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington. NC 28403 )Lorme, USGS, Intermap, increment P Corp., TI, Esri China (Hong Kong), Esri (Thailand), ),OpenStreetMap contributors, and the GIS User Boundaries are approximate and are not meant to be absolute. Map Source: ArcGIS World Street Map Asset Storage LMG Brunswick County, NC I _ www .lmgroupnet July 2016 3805 Wrightsville Avenue LMG # 40-15-107 Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 SCALE 1" = 1 mile Figure 1 Vicinity Map 0 Boundaries are approximate and are not meant to be absolute. Map Source: USGS Brunswick County GIS Mosaic I SCALE 1" = 800' Asset Storage LMG 1 A'I' NIAN 11,i %11 N Brunswick County, NC I— �"V , , " , , Figure 2 www.lmgroup.net USGS Topographic Map July 2016 3805 Wrightsville Avenue LMG # 40-15-107 Wilmington, NC 28403 1 1 Phone: 910.452.0001 Fax: 910.452.0060 Legend Lo: Leon fine sand Mu: Murville mucky fine sand To: Torhunta mucky fine sandy loam arm q.,,4 are not meant to be absolute Map Source: NRCS Soil Survey JLar Geagraphics, CNESiAir�Ls rid, iGN, IGP, swisstopo, a,r. SCALE 1" = 200' Asset Storage LMG Brunswick County, NC _ Figure 3 www.lmgroup.net Soils Map July 2016 3805 Wrightsville Avenue LMG # 40-15-107 Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 � PP V yya _ G� JLar Geagraphics, CNESiAir�Ls rid, iGN, IGP, swisstopo, a,r. SCALE 1" = 200' Asset Storage LMG Brunswick County, NC _ Figure 3 www.lmgroup.net Soils Map July 2016 3805 Wrightsville Avenue LMG # 40-15-107 Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 v Im Potential jurisdictional wetlands Map Source: 2010 GIS World Imagery SCALE 1" = 200' Asset Storage LMG Brunswick County, NC z Figure 5 www.lmgroup.net Upland/Wetland Sketch July 2016 3805 Wrightsville Avenue LMG # 40-15-107 Wilmington, NC 28403 Phone: 910.452.0001 Fax: 910.452.0060 1 r a L a 0 S 5733'06" W 33 21' BOUNDARY FOR MINI STORAGE SITE (6 3 ACRES) — m Z 0 \ \\'� \\ = v 7 g° m I m �' r 3 Z z D m BELVILLE, NORTH CAROLINA 3503 WRiGHTSVILLE AVENUE, SUITE l0 WILMINGTON, NORTH CAROLINA 28403 PHONE 910-313-2882 FAX QLEI_91A_4RRs I I I I I ' Z -n CT z> Xc)OU r G p W p N N o j Z �o I m C L F a O 1p IF I � rnorosrne' � K oHKltrn rno I \+ m \\\\\ O \I i i>i I Cf0'p n% \ � ri 10 10'L aY \ I' I ,.�•. I y I I 15' WAMWNE EASEMENT L \a +20\ \ ,� \ Sjy I I I SIREN A0RVAW0 \ \ \ S 9 GA IF -r- �z I I �� I • � o� ma S raoroPA VINOPH.IL I -- 73 —+ -- BELVILI F 20' AGC 838 LASEM6NT 10'MIN -- -- _-- - — _ 5 54'b7'59" W 569 42' a r r0' SIGN (20' TOTAL HPIGHT) PICKET FENCE WIH BRICK C0.' UMNS (T' X 2' X Y)_, —_--- VACED EVERT TNENTY (20) FEET --- — ---- _- ec' 207 BLACKWELL ROAD - S R 1551 ("� g° m I SITE PLAN FOR ASSET S'I"ORAGE ADDITION BOWMAN DESIGN FA& ENGINEERING i SERVICES PA m BELVILLE, NORTH CAROLINA 3503 WRiGHTSVILLE AVENUE, SUITE l0 WILMINGTON, NORTH CAROLINA 28403 PHONE 910-313-2882 FAX QLEI_91A_4RRs I I I I I � z> Xc)OU r G p z > �o m 1p IF I � rnorosrne' � K oHKltrn rno I \+ m \\\\\ O \I i i>i I Cf0'p n% \ � ri 10 10'L aY \ I' I ,.�•. I y I I 15' WAMWNE EASEMENT L \a +20\ \ ,� \ Sjy I I I SIREN A0RVAW0 \ \ \ S 9 GA IF -r- �z I I �� I • � o� ma S raoroPA VINOPH.IL I -- 73 —+ -- BELVILI F 20' AGC 838 LASEM6NT 10'MIN -- -- _-- - — _ 5 54'b7'59" W 569 42' a r r0' SIGN (20' TOTAL HPIGHT) PICKET FENCE WIH BRICK C0.' UMNS (T' X 2' X Y)_, —_--- VACED EVERT TNENTY (20) FEET --- — ---- _- ec' 207 BLACKWELL ROAD - S R 1551 ("� g° m I SITE PLAN FOR ASSET S'I"ORAGE ADDITION BOWMAN DESIGN FA& ENGINEERING i SERVICES PA m BELVILLE, NORTH CAROLINA 3503 WRiGHTSVILLE AVENUE, SUITE l0 WILMINGTON, NORTH CAROLINA 28403 PHONE 910-313-2882 FAX QLEI_91A_4RRs I I I I I Action ID: SAW -2008-2987 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT County: Brunswick USGS Quad: Winnabow GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner/ Authorized. Agent: Mr. Dan Cameron c/o Asset Storage, LLC Address: 3504 St. Francis Drive Wilmington, NC 28409 Telephone No.: (910)344-2270 Size and location of property (water body, road nametnumber, town, etc.): The 5.4� 9 acre parcel is located along the north side of Blackwell Road (SR 1551). south of US Highway 17/74/16 Interchange, in wetlands adiacent to unnamed tributaries to Jackev's Creek. in Leland, Brunswick County, North Carolina. Parcel # 0380003002. Description of projects area and activity: The proposal includes the placement of fill material into Section 404 wetlands to construct the road and second storaize building for Asset Storage, LLC . There is one authorized impact area as depicted on the attached plans This impact area is authorized for 031 acres of wetland fill for the construction of the roadway around the building and the buildin ad. -No temporary impacts are authorized. Applicable Law: N Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number. Nationwide Permit Number. 39 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 395-3900. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regar ' thus vert ation, any th 3269 nd of the Permit, or the Corps of Engineers regulatory !ret !lease contact Ms.) imb Garve . orY_ ecia ,0t 910 2514482 or kimberl .l. arve usace.army.mil. Corps Regulatory Expiration Date of V The Fribnington District is committed to providing the highest level bf suppdrt to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at hnp: //reeula;Z-v.itsacesurvev.corn/ to complete the survey online. Determination of Jurisdiction: ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued 8/21/2007. Action ID 22006-32731. Basis of Jurisdictional Determination: %his si e�bits w4tland-Enteri n escn'bed in the 1987 Corns of Engineers Wetland Corps Regulatory Date: March 26.2009 SURVEY PLATS, FIELD SKITCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: Chad Coburn, DENR-DWQ, Wilmington Regional Office, 127 Cardinal Drive Ext., Wilmington, NC 28405 Kim Williams, LMG, Inc., PO Box 2522, Wilmington, NC 28402 SAW -2008-2987 SPECIAL CONDITIONS: 1. In order to compensate for impacts to 0.31 acres of non -riparian wetlands the permittee shall make payment to the North Carolina Ecosystem Enhancement Program (NC EEP) in the amount determined by the NC EEP, sufficient to perform the restoration of 0.62 acres of non -riparian wetlands in the Cape Fear River Basin, Cataloging Unit 03030005. Construction within jurisdictional areas on the property shall begin only after the permittee has made full payment to the NC EEP and provided a copy of the payment documentation to the Corps, and the NC EEP has provided written confirmation to the Corps that it agrees to accept responsibility for the mitigation work required, in compliance with the MOU between the North Carolina Department of Environment and Natural Resources and the United States Army Corps of Engineers, Wilmington District, dated November 4, 1998 2. The Permittee shall execute and cause to be recorded in the Brunswick County Register of Deeds the Declaration of�Restrictions (attached) for the purpose of maintaining the remaining wetlands on Parcel number 0380003002 (approximately 0.3 acres of wetlands) in their natural and/or mitigated state in perpetuity, prior construction within jurisdictional areas on the property. At the time of recordation of the Covenants, the Permittee must also record with the Brunswick County Register of Deeds, a final survey map of the development, sealed by the licensed surveyor, which clearly depicts the surveyed areas of Conservation and lot/infrastructure layout. These provisions relating to wetlands cannot be amended or modified without the express written consent of the U.S. Army Corps of Engineers, Wilmington District. *This includes changes as a result of any local government drainage easement requirements*. The permittee shall enforce the terms of the Covenants and, prior to conveyance of the property, shall take no action on the property described in the Covenants inconsistent with the terms thereof. The permittee shall provide a copy of the recorded Covenants and recorded Survey to the Corps of Engineers within 15 days of recording. 3. The construction/presence of this fill (to which this Nationwide Permit (NWP) verification letter pertains) will not affect our review of any future proposed impacts. The presence of the roads and commercial buildings will not be an adequate justification for future impacts (e.g., additional roads/buildings must be built in jurisdictional waters of the U.S. because the location of this road/building necessitates the location of the other roads/structures). We will examine any future proposal to impact jurisdiction waters of the U.S. to ensure that you have avoided, minimized, and/or mitigated for unavoidable impacts. 4. A verification of the use of Nationwide Permit 39 for the currently proposed impacts does not imply that this office will necessarily approve any future proposal(s) to impact waters of the United States on this parcel or parcel 0380003001 also owned by Mr. Dan Cameron through the Noremac Enterprises, LLC. Corps Regulatory Action ID Number: SAW -2008-2987. County: Brunswick Permittee: Mr. Dan Cameron do Asset Storage, LLC Date Verification issued: March 26, 2009 Project Manager: Kimberly Garvey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WII.NDNGTON DISTRICT WILMINGTON REGULATORY FIELD OFFICE .69 DARLINGTON AVE WILMINGTON, NORTH CAROLINA. 28403 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date February 15, 2011 Regulatory Division Action ID No. SAW 2008-002987 Asset Storage, LLC Mr. Dan Cameron 3504 St. Francis Drive Wilmington, North Carolina 28409 Dear Mr. Cameron: Please reference the Department of the Army (DA) Nationwide 39 permit issued to you on March 26, 2009 for the Asset Storage, LLC project and your letter dated February 2, 2011 regarding time extension of the permit. The referenced permit authorized 0.31 acres of wetland fill for road crossing impacts pursuant to Section 404 of the Clean Water Act. There are no temporary impacts authorized by this permit. The project site is located along the north side of Blackwell Road (SR 1551), south of US Highway 17/74/76 interchange, in wetlands adjacent to unnamed tributaries to Jackey's Creek, in Leland, North Carolina. The expiration date for this permit is March 26, 2011. Based on the referenced letter, the anticipated completion date of this project is approximately one year. We have reviewed your request and have determined that the proposed new expiration date is consistent with applicable regulations and would not be contrary to the public interest. Therefore, your permit is hereby modified to extend the expiration date to March 18, 2012. All other conditions of your Department of the Army permit shall remain in full force and effect. Should you have any questions, please contact Ms. Emily Hughes, Regulatory Division, at telephone (910) 251-4635. Sincerely, FILENAME: SAW 2008-02987 Asset Storage Ext CESAW-RG/HUGHES/ldh/s qfA MAIL a-1 ln/ l t� CESAW-RG/FILE Emily B. Hughes, Regulatory Specialist Wilmington Regulatory Field Office NCDET�R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary April 15, 2009 Brunswick County DWQ Project M 08-1562 Mr. Dan Cameron Asset Storage, LLC 3504 St. Francis Drive Wilmington NC 28409 Subject Property: Asset Storage NO WRITTEN CONCURRENCE NEEDED Dear Mr. Cameron: You have our approval, in accordance with the attached conditions to permanently impact 0.31 acres of 404 wetlands in order to provide an access road and to build a second storage building as described in your application received by DWQ on February 20, 2009. After reviewing your application, we have decided these impacts are below the threshold for written authorization as long as all conditions of General Water Quality Certification Number 3705 (GC3705) are met. This certification may also be viewed on our website at http://h2o.enr.state.nc.us/newetlands. This Certification allows you to use the Nationwide 39 Permit when issued by the US Army Corps of Engineers. This approval is only valid for the purpose and design that is described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1) Upon completion of the project, the applicant shall complete and return the enclosed "Certification of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. , Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. 10aq. "V Wl.iu 1"Q North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Servicel-6771623-67• a(r(p(1��� Wilmington Regional Office Witunington, NC 28405-3845 FAX (910) 350-2004 Internet h2o enr.state.nc.us An Equal Opportunity/Affirmative Action Employer — 50% Recycied110% Post Consumer Paper F. S Asset storage Brunswick County 2008-1562 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a. hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan at (919) 733-1786 or myself at our Wilmington Regional Office at (910) 796-7215. Sincerely, Chad Coburn Senior Environmental Specialist Enclosures: GC 3705 Certification of Completion cc: Ian McMillan — DWQ 401 Oversight Unit Kim Garvey— Corps of Engineers Wilmington Kim Williams — Land Management Group, Inc., P.O. Box 2522, Wilmington, NC 28402 WiRO