HomeMy WebLinkAbout20150579 Ver 1_FERC Notice_2014091020140910-3011 FERC PDF (Unofficial) 09/10/2014 Mr. Ray F. Ward UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Project No. 9842-006 NOTICE OF APPLICATION TENDERED FOR FILING WITH THE COMMISSION AND SOLICITING ADDITIONAL STUDY REQUESTS AND ESTABLISHING PROCEDURAL SCHEDULE FOR RELICENSING AND A DEADLINE FOR SUBMISSION OF FINAL AMENDMENTS (September 10, 2014) Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor New License b. Project No.: 9842-006 c. Date filed: August 28, 2014 d. Applicant: Mr. Ray F. Ward e. Name of Project: Ward Mill Hydroelectric Project f. Location: On the Watauga River, in the Township of Laurel Creek, Watauga County, North Carolina. The project does not occupy lands of the United States. g. Filed Pursuant to: Federal Power Act 16 U.S.C. §§ 791 (a) - 825(r) h. Applicant Contact: Andrew C. Givens, Cardinal Energy Service, Inc., 620 N. West St., Suite 103, Raleigh, North Carolina 27603, (919) 834-0909 i. FERC Contact: Adam Peer at (202) 502-8449, adam.peer@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item 1 below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC T 61,076 (2001). 20140910-3011 FERC PDF (Unofficial) 09/10/2014 Project No. 9842-006 k. Pursuant to section 4.32(b)(7) of 18 C.F.R. of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. 1. Deadline for filing additional study requests and requests for cooperating agency status: October 27, 2014 The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission's eFiling system at http://www.ferc.gov/docs-film /e fiiing.asp. For assistance, please contact FERC Online Support at FERC OnlineSupport (a.,ferc. Dov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The first page of any filing should include docket number P-9842-006. in. The application is not ready for environmental analysis at this time. n. The Ward Mill Project consists of. 1) an existing 130 -foot -long by 20 -foot -high dam; (2) an existing 4.6 acre reservoir with an estimated gross storage capacity of 16.3 acre- feet; (3) a 14 -foot -long, 5 -foot -wide, and 7.5 -foot -tall penstock made of rock, concrete and reinforced steel; (4) a powerhouse containing two generating units for a total installed capacity of 168 kilowatts; (5) existing transmission facilities; and (6) appurtenant facilities. The project is estimated to generate from below 290,000 to over 599,000 kilowatt-hours annually. The dam and existing facilities are owned by the applicant. No new project facilities are proposed. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at http://www.ferc.gov%docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. 20140910-3011 FERC PDF (Unofficial) 09/10/2014 Project No. 9842-006 3 p. Procedural schedule and final amendments: The application will be processed according to the following preliminary Hydra Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Acceptance or Deficiency Letter October 2014 Request Additional Information October 2014 Issue Notice of Acceptance January 2015 Issue Scoping Document 1 for comments February 2015 Comments on Scoping Document 1 April 2015 Issue Scoping Document 2 May 2015 Issue notice of ready for environmental analysis May 2015 Commission issues EA January 2016 Comments on EA February 2016 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. 20140910-3011 FERC PDF (Unofficial) 09/10/2014 Document Content(s) P-9842-OO6Notice.DOC.................................................. I-3