Loading...
HomeMy WebLinkAbout20071843 Ver 1_Emails_20070608Stone Farm - macrobenthos monitoring Subject: Stone Farm - macro benthos monitoring From: Tammy Hill <Tammy.L.Hill@ncmail.net> Date: Fri, 08 Jun 2007 10:34:50 -0400 To: bmanning@lmgroup.net CC: Larry Eaton <larry.eaton@ncmail.net>, Eric Kulz <eric.kulz @ ncmail.net> Hello, Brent. I have looked into the macrobenthos monitoring that was suggested by DWQ for the Stone Farm mitigation bank. It is suggested that you have the monitoring done by someone who has earned a certificate of training through a course that covers the stream biology, identification, and monitoring methods utilized by DWQ. There are many people in the NC consulting realm (perhaps even at LMG) who have been through these courses. Minimum requirements for sampling points would be: 1 on Hunters Creek near the inlet to the project site 1 on Hunters Creek near the outlet from the project site 1 on the Main Stem near the outlet from the project site 1 in the stream reference reach, for comparison with data from the project site Minimum monitoring frequency would be: 1 pre-construction monitoring event 1 post-construction monitoring event 1 event annually during monitoring years 3, 4, and 5 Hope this is helpful. Feel free to contact me or Eric Kulz (919-715-9050) with aray questions. As part of the MBRT, we're looking forward to working with you toward success of this mitigation project. Kind regards, Tammy Hill Environmental Senior Specialist NC Division of Water Quality (401/Wetlands) 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 919-715-9052 (voice) 919-733-6893 (fax) Tarany,. L . Hi 11 @ncmai 1 . ne t I of 1 6/8/007 10:36 AM