Loading...
HomeMy WebLinkAbout20130223 Ver 6_Approval Letter_20160714PA"l MCCRORY ;, l�ONAI,U R. VAN DER VAAR"I' Water Resources ENVIRONMENTAL OUALITY July 14, 2U16 Mr. Phi:ip S. Harris, [[I, P.E., CPM Natural Env:ronment Sectio:� Head Yroject Development and Environmental Analysis North Carolina Department of'I'ransportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1598 _-�,��-��„��,� S. JAY ZIMMERMAN Subject: Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CCNDIT:ONS for the proposed Greensboro Western Loop from north of SR 2175 (Fsryan Bouievard) to SR 23u3 (Lawndale Drivej in Guilforu County, Division 7; Federal tiid Project No. STP-NHF-124(1), WBS Element 3482G.1.2, TIF Project No. U-2�24 C and D. NCDWR ?roject Iv`o. 20t30223 v.b Dear Mr. Harris: Attached hereto is a modification of Certification No. 3965 issued to The North Carolina Department of Transportation (NCDOT) dated July 2, 2013 and subsequent modifications dated April 15, 2014, June 25, 2015, October 12, 2015, and July 8, 20I6. If we can be of further assistance, do not h?sirate to contact us. Sineerely, /���� �l , S. Jay Zimmerman, Director Division of Water Resources Attachments Electronic copy only distribution: David Bailey, US Army Corps of Engineers, Raleigh Field Office Jerry Parker, Division 7 Environmental Officer Rodger Rochelle, NC Department of Transportation Erin Cheely, NC Department of Transportation Dr. Cynthia Van Der Wiele, US Environmental Protection Agency �ary Jordan, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resources Commission Beth Harmon, Uivision of Mitigation Services File Copy State of North Caro�ina 'iF.mironmental �ivality � bVater Aesources �51� h"ail Ser�;ce Cent�r Raieiyh.'uoith Caro!ina;'7B99-iGi7 Pnone:919-8G7-6300 Modification to the 40f Water Quality Ceriification Pursuant to Section 401 of the �'ederal Clean Water Eict with AUDITIONELL C�NllITTONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95- 217 of the United States and subject to the North Carolina Division of Water Resources (NCDWR) Regulations in 15 NCAC 2H A500. This cerrification authorizes the NCDOT to impact an additional $;� !inear feet oi j�isdictioiial strear�zs in Guiiford �our,ty. Tiie project sha=1 be �onstructed pursuant to the application dated received Ju�y 11, 2016. The authorized impacts are as described below: T'able 1. Site L`�umber Y�e Site liTumbei Originai Application Modification (July 2, 2013) Application a 12, 2016) 1 -- 1 2 1 2 3A -- 3A 3 2 3 4 3 4 5 4 5 ---- 6 -------------- 5 --- -- 6 --- 7 6 7 g -- — __ — 8 9 7 9 10 -- 10 Table 2. Stream Im acts in the Ca e Fear River Basin Permanent Temporary Fill Permanent Fill Temporary Total Stream Site Number F��� 1° in Intermittent in �'erennial F��� �° Stream Impacts Int�rsn;ttent Perennia! :diq•�;ring Stream Stream � Impaet S±rca.n S±: ea:. IVIi�iga±ia� '��np:er ii) (iinear f€j �iisiear fc; (linear ft) ` (linear ft) I (linear ft) 1 15 I S -- -- 30 -- Original approved __ __ 393 10 403 393 impacts at Site 1 * New additional im acts at Site 2 -- 21 -- 21 21 Total Impacts with this approval -- -- 414 10 424 414 at Site 2 Original approved impacts at Site 2* " 919 10 929 919 New additional 158 -- -57 -- 1G1 -57 impacis at Site 3 - Total Impacts with this approval 15g -- 862 10 1,030 862 at Site 3 3A 96 -- — -- 96 -- Original approved __ __ 1,488 10 1,498 1,488 impacts at Site 3* New additional __ __ 93 2 95 93 impacts at Site 4 _____ ______ ___ __ ____ _____ Tota: I�npacts — — - - � — with this approval -- -- 1,5�1 12 1,593 � 1,581 at Site 4 I Original apj�c'�ved I � — I I irnpacts ai Site 4* j '� 1,253 20 i 1;273 i,253 i Permanent Temporary Fill Permanent Fill Temporary Total Stream Fil: in FAII IR Im�aets Site Number Intermittent' �D intermirtent in Perenn�a6 perennial � �tream Requiring Stream Stream Stream Stream a�pact Mitigation (linear ft) ���near ft) ` (linear ft) (�inear ft) ���near ft) ��inear ft) New additional -61 23 -38 -61 impac+s at Site 5 Ti otal Impacts with ihis approval � -- -- 1,192 43 1,235 1,192 at Site 5 Qriginal approved 141 10 -- -- 151 -- impacts at Site 5* I�Tew additional 1� 6 _ __ 23 __ im acts at Site 6 Total Impacts with this appraval 158 16 — -- 174 -- at Site 6 Originai approved __ __ 311 10 321 311 im acts at Site 6* ivew addi'cional __ ; __ 3 3 im acts at �ite 7 iotal Impacts with this approval -- -- 314 10 324 314 at Site 7 8 __ -- 46 18 64 -- Original approved __ __ 99 . 10 109 ' 99 im acts at Site 7* New additional 289 10 299 289 impacts at Site 9 _ _ 'I'ot�l Impacts I with this apgrovaf -- � -- 388 �0 � 408 � 388 at Site 9 10 __ __ 34 20 54 -- TotalOriginal 141 10 4,463 70 �,684 4,463 Im acts Total Additianal 286 21 36S 73 748 � 288 Im acts � Totallm acts 427 31 4,831 1Q3 �,432 4,751 'i'otal Stream Impact for R-2524I�: 5,755 [inear feet. Notes: * See Table 1 for explanation of site numbers. �' Impacts reflect the sum of impacts at site 4 in the original certification. Table 3. Utilit Ian acts to Streams in the Ca e Fear River Basin Permanent Impacts Temporary Impacts .�l�C '•---- ^--�� na_..._.. r ..a� U1 U2 U3 U4 U5 U6 � � � � � � L Total irn�acts __l_ -- Total iJtility Ier.pacis for I�odiiication: 901inear feet. 15 15 15 15 15 15 90 Impacts Requiring :itigation (linear feet � m m � m � The application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River Basin in conja�ictior� with the nrapo;e� development will not res��lt in a vic�lation of applicable Water Qaality Standards and �ischarge g�idelinPs. Theref�i•e, the State of North Carolir.a certifies that this activity wili nat violate the applicable portions of Sections 301, 302, ?03, 306, 3Q7 of PL R2-500 and PL 95-217 if c�nducted :n accordance with the apulication and c�n_ditians l�ere:nafter set fort��. This approval is oi�iy valid for the pur�ose and design that you submitted in your applicaiion daied received May 12, 2016 and additional information dated received June 16, 2016. Should your proiect change, you are required to notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre ar 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7}. Fer this approva! to remain valid, yo�: are required to comply ��v:th al: the con�it�ans listed bPlow. Ir. a�ditior_, you sh�iuid ebiain ail �iher ipderal, s�ate or luc�l penr.its beiore proceeding witli your pro;ect i.ncludir_g (but tiut iin�ited to) Sediment and Erosion control, Coastal Stormwater, Non-discharg� and Water Supply watershed rPgulations. This Cert�fica±ior_ shal? expire on the same day as the expiration date of the coiYespendin� �orps of Engineers Permit. �ond'etion(�) of Certi�acation: �roject Speeifi� Condi.*ions 1. This me�ification is applicable only to the additional proposed activities. All of the authorized activities and conditions of certification associated with the original Water Quality Certification daied Ju1y 2, 2013 and subsequent modifications dated April 15, 2014, June 25, 2015, October 12, 2015, and July 8, 2016 still apply except where superseded by this certification. 2. The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre-construction meeting with all appropriate staff to �nsure that the proj�ct supervisar and essential staff �mderstand the potentiai issue� with• cne�m and pipe alignment at the permitted site. NCDWR staff shall be invited to the pre-construction meeting. f 15A NCAC 02H.0506(b)(2) and (b)(3)] 3. Two copies of the final construction drawings shall be furnished to the NCDWR Central Office prior to the pre-construction meeting. The permittee shall provide written verification that the final construction drawings comply with the permit drawings contained in the application dated May 12, 2016 and additional information dated received June 16, 2016. Any deviations from the approved drawings are not authorized unless approved by the NC Division of Water Resources. 4. Channel relocations shall be completed and stabilized, and approved on site by NCDWR staff, prior to divPrtLng wa±�r into th� r_e�h� chanr+el. Stre�m banks shall L�e mat±�d with coir-fh�r matting. ��egetation used f�J:' �J^o:'i�: SiB.�'i:��Zc�:`1Lln S�18�1 .�P �1i�i±C.`j t� r��t�vL r:p:aT'iBTa tivL,_,T?i�t:0�7, 3ilu S}?Ga�� :IlC��,iC�O E:.�,t���1S�iP=�S?t �f .�. vegetated huffer on both sides of the relocated channel to the maximum extent nracti�al. Also, rip-rap may b� aliow�� if it is necsssary to mair�tair_ the physicat i�tegrity ai the str�am, but the applicant must Yrovide writfen jusiification and any calculations used to determine the extent of rip-rap coverage requested. Once the stream has been t�irned into tlie new channel, it may be necessary to relocate stranded fish to the new channel to prevent fish kills. [15A NCAC 02H .0506(b)(3)] 5. No drill slurry or waier that has been in contact with uncured concreie shail be ailowed to enter surface waters. 1 his water shall be captured, treated, and disposed of properly. [15A NCAC 02H .OSU6(b)(3)] 6. Unless atherwise approved in �his certification, placenzent oi culverts and aiiier srizictutes in opeu waters and sireams, shail be placed below the elevation of the streambed by one foot for all culveris with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, te allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures sl-,all not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream 3f the above structures. The applicant is required to provide evidence that the equili�rium is being maintained if requested in writir.g by the TdCDV�IR. If this condition is unable to be met due to b�drock er ather ?imiting features encountered during construction, please contact the NCDWR far guidance on how to proceed and to determine whether or not a permit modification will be required. [1SA NCAC 02H.0506(b)(2)] 7. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as clasely as possible including pipes or barrels at flood p1'ain elevation and�o: sills where appropriate. JVidening the stream channel should be avoided. Stream channel �videning at the inlet or outlet end of st�-�ct��: es ;�� �al?y decreases ,x��re: veloci*y ca�s�ng sedime,_r.t ��positi.�r_ that re�nires inerease3 ma:nt.•nance and disrupts aquatic lite passage. [15A NCAC 02H.0506(b)(2)] 8. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aqaatic ;i;e p�ssage. Bioe:►g:i5eerin� boulders or st�uctur�s shouid �e pz�a��e�?y d�si��n�d, s:ze� �nd 'znstalled. �is�Nc�� c2x.esob(b)(2)] 9. The stream channel shall be excavated no deeper than trie naiural bed material of the stream, to the inaximum extent practicable. Efforts must be made to minimize imnacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species. [15A NCAC 02H.0506(b)(2)] , 10. Compensatory mitigation for 4,751 linear feet of impact to streams at a 1:1 ratio is required. We understand that yau have c1�.osen to perfoni compensatary mitigation ioi iinpacts to stream's tl,rough the 1�`orth Carolina Division of Mitigation Service (DMS) (formerly NCEEP), and that the DMS has agreed to implement the mitigation for the project. The DMS has indicatecl in a letter dated May 9, 2016 that they will assume resnonsibiliry for satisfying the federa: Clean Water Act compensator� mitigation requirements for the ab�vz-referznced project, in accordance with �he DMS Niitigation Bankuig Instrument si�rted Jur�e 14, 2016. 11. In accordance with commitments made in your application, all clearir�g of vegetatian for purpose of relocating overhead power lines within� jurisdictional wetiands shall be performed without the use of mechanized equipment. [15A NCAC 02H.0506(b)(3)] 12. The permittee shall use Design Standards in Sensizzve Watersheds [15A NCAC 4BA124(b)-(e)] through the entire project. However, due to the size of the project, the NCDOT shall not be required to meet 15A NCAC 4B .0124(a) regarding the maximum amount of uncovered acres. 13_ 'Che NCDOT shall design, �onstruGt, and operat� and maintain bazar�ous snill catch b�sins (HSCBs) for cross�ngs in the Lake Brandt Critical Area watershed. The HSCBs shall he Iocated at Station numbers — RPDY4- STA. 1+70 to STA. 5+00 LT and —L- STA. 443+75 to STA. 446+00 LT. General Conditions 1. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equili�rium of wetlands or streambeds or hanits, adjacent t� or upst.rPam ar_�i �ownstream of±he ab��e SCt''.3Cyures, Th� ap�':icart is re��aire�? io pTv^i'IC:P wV?�rll�e i�'I�t the eq�:1�1�s1i11T1 :S i;edT?g 1:1c�iT?i3'•iZCG� ;f;2i1','<�3?Cfi in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiiing featw�es encoeu►tered during constructi�n, please contact NCD�✓R for guidance �n how to proceed and to detzrir�ine whether or not a permit modification will be required. [15A NCAC 02H.OSG6(b)(2)] 2. If concrete is used during consfiac±ion, a dry work area shall be maintair.ed to prevent d�rect contact bPtween curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 3. Bu,ring the construction of the project, no staging of equipment of any kind is perniitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. T'he dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0505(b)(2)] 5. The use of rip-rap above the Narmal High Water Mark sha11 be minimized. Any rip�rap placed for stream stabilization shall be placed in stream channels in such a maiuier that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 6. The Permittee shall ensure that the fmal design drawings adhere to the permit and to the permit drawings submitted for approval. [ 15A NCAC 02H .0507 (c) and 1 SA NGAC 02H .0506 (b)(2) and (c)(2)] 7. All work in or adjacent to strea�ri waters shall be conducted in a clry work area. Approved BMP measures from the most current versian of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shali be used to preveni excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 8. Heavy equipment shall be operated fram th� b�nks r�ther than in tne sream cr�a�nei ir, orcier to minirlize sedimentatiorz and reduce the introductioa af other pallutants in�o the stream. [15A NC::�� 02H.Q�06(b)(3)] 9. All mecrianized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [ 15A NCAC 02H.0506(b)(3)] 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] 11. Discharging hydroseed mixt�res and washi:�g eat hy�irosee�ers and other equipr.ler_t in ar adjacent to su:face waters is prohibiied. [ISA NCl�C 02H.O�Ob(b)(3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirernents resalti.�g from compliance with §303(d) of the Clean Water Act) and any other approp�iate requirements �f State and Fede;al law. If the NCDWR deternines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that Sfate or federal law is being violated, ar that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, anless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14. A copy of this Water Quality Certi�cation shall be maintained on the construction site at all times. In addition, the Water Quality Certificaiion and all subsequent modifications, if any, shall be maintained with the Division Bngineer and the on-site �nroje�t manager. [15A NCAC 02H .OSU7(cj and I SA NCAC �72H .OS06 (b)(2) and (c)(2)] 15. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regula�ions, or ord'uiances tliat may be im�,osed by other government agencies (i.e. l�cal, state, and fe�eral) having jur:sdiction, including but not lli•nite� to applicable buffer rules, sto:mwater management ; rules, soil erosion and sedimentation control requirements, etc. 17. The Per�nitiee shall report any viol�tions of this cer�ifi_cation to the Division of Wate,r Reso�ir•ces within 24 hoiu•s of discovery. [ 13A ?1CAC 02B.0506('a)(2 j] 18. Upon completion oi the project (including any impacts at associated borrow or waste sites), the NCDGT Division Engineer shall complete and return the enclased "Certificatior. of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502( fl] 19. Native riparian eegetation must be reestablished in the riparian areas within the constnction limits of �he project by the end of the growing season fcllowing completion of construction. [15A NCAC 02B.0506(b)(2)] 20. T'here shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this pennit without appropriate modification. Shoul�i waste or boirow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)] 21. Erosion and sediment control �ractices must be iri full compliance with all specifications governing the proper design, installation and operation and maintenance of such Besi Ma.~�agement Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3)]: � a. The erosion and sediment control measures f�r the project m��st be designed, installed, operated, and mauitained in accardance wiih the most i•ecent version of the North Carolina Sediment and Erosion Control Plan�zing and Design Manual. b. The design, installation, operatian, and maintenance of the sediment and erosion control measures.must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Controi I�Ianual. The devices snail t�e maintained on ail construction sites, borrow sites, and waste pile �spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites; the erosien and sediment control measures must be designecl, instalied, ope:aiec�, and maintained ir, acco�daace w;th tl:e nast recent version of the Nort;z Caralirta Surface Ivliszing Manual. d. T'he reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] 23. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. Th;s Certificatian shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearina. You may obtain the petition form from the office of �4dministrative nearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official staie holidays. The original and one (I) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Ot�ice of Administrative Hearings within five (5) business days following the faxed transmission. T'he mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Th�s the 14th d,ay of July 2.Q16 DIVISION OF WATER RESOiJRCES �A S. Jay Zimmerman, Director WQC No. 3965 =: ; � _��; - Water Resources ENVIRONMENTAL OUALITY NCDWR Project No.: Appiicant: Project Name: _ Date of iss��ance of 401 Water Quality Certification: COUIIt�': !'A"T MCCROFZ�� I)(�NAI,[) R. VAN DF?R VAAR7 �. JAY 'LIMMERMAN Certificate of Completion Upor compietion of all work approved within the 40 ] Water Quality Certification or applicable BuFfer Rules, and any subsequent r,iedificatio::s, the applicant is required to reiun� ti�is certificate to the 401 Transportation Permitting Uni±, Nart;� �aroiina Divisicn �f V✓at�r Resoarces, ��l' "�Ia�l Service Center, nal:,igh, P.C, 2?5R9-1517. .his forrn .<<ay be returried to PJCD'J�'R L-y thE applicar�t, thz applicant's authorized agent, or the �roject er,gineer. It is not necessary to ser.d certificates from all of these. App[icant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent �f the 401 W2ter Quality Certificatic�n and Buffer Rules, the approvPd plan� �.n.d specifcations, and other supporting materials. Signai.�r�: �aie: AgenCs Certijieaiio�r I, , hereby state that, to the best of my abiiities, due care and diliaence was used in the observation of ihe �onstruction such that the const►uction was observed io be buili within substantiai compliance and intent of the 401 Vdater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Enginee�'s Cereifrcation Partial Final I, . as a duly registered Professional Engineer in the State of North Carolina, having been au±horized to observe (periodically, weekly, full timel the construction of Ihe project,for the Permittee hereby state tiiat, to the best of my abilities, due eai�e and diligence was used in the observatfon of the construetion such that the construction was observe� to be bu;lt within substantial compliance and intent of the 401 Water Quality Certifcation and Buffer Rules, the Tpproved plans and specifications, and other supporting materials. Signature Regisiration No. Date State of'North Carolina IEnv�ronmentaE Q�.ia�iry � Water Resourees 16'? Mail Service Ce��ter, Raieign, fJnrt�, Ca_rol�na 2%599-16i % Phone:9t9-307-630G