Loading...
HomeMy WebLinkAbout20080347 Ver 1_More Info Letter_20080229O?0F W AT ?RQG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 29, 2008 DWQ Project # 08-0347 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Carolyn J. Edwards c/o Brookwood Capital Attn. Mr. Lindsay Sewell P.O. Box 6242 Raleigh, NC 27628 Subject Property: Brookwood Capital Site Ut to Crabtree Creek [030402, 27-33-(10), C, NSW] REQUEST FOR MORE INFORMATION Dear Ms. Edwards: On February 25, 2008, the Division of Water Quality (DWQ) received your application dated February 22, 2008, to fill or otherwise impact 148 linear feet of perennial stream, and 7,925 square feet of Zone 1 Neuse River basin protected riparian buffers, and 6,445 square feet of Zone 2 Neuse River basin protected riparian to construct the proposed commercial development. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide the location of any proposed stormwater management practices as required by GC3704. 2. Please provide plans and profiles for all the stormwater management devices as required by GC3704. 3. Please indicate all stormwater inlets and outfalls on the site plan. 4. Please provide an inventory of proposed project imperviousness area based on the estimated built-out conditions. Please include all proposed building footprints, roads, driveways, sidewalks, gravel-surfaced areas, amenity areas, etc. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.ne.us/newetlands None Carolina Ntura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Brookwood Capital Page 2 of 2 February 29, 2008 5. Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure worksheets and signed and a notarized Operations and Maintenance Agreement. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to disgt*s this matter. CBK/ijm SincerelW- /L,:- C yndi Karoly, upervisor Supervisor 01 Oversight/Express Review Permitting Unit cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Jeff Harbour, ESI, 524 S. New Hope Road, Raleigh, NC 27610 080347B rookwoodCap italS ite(Wake)On_Hold