HomeMy WebLinkAbout20080347 Ver 1_More Info Letter_20080229O?0F W AT ?RQG Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
February 29, 2008
DWQ Project # 08-0347
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Ms. Carolyn J. Edwards
c/o Brookwood Capital
Attn. Mr. Lindsay Sewell
P.O. Box 6242
Raleigh, NC 27628
Subject Property: Brookwood Capital Site
Ut to Crabtree Creek [030402, 27-33-(10), C, NSW]
REQUEST FOR MORE INFORMATION
Dear Ms. Edwards:
On February 25, 2008, the Division of Water Quality (DWQ) received your application dated February
22, 2008, to fill or otherwise impact 148 linear feet of perennial stream, and 7,925 square feet of Zone 1
Neuse River basin protected riparian buffers, and 6,445 square feet of Zone 2 Neuse River basin protected
riparian to construct the proposed commercial development. The DWQ has determined that your
application was incomplete and/or provided inaccurate information as discussed below. The DWQ will
require additional information in order to process your application to impact protected wetlands and/or
streams on the subject property. Therefore, unless we receive five copies of the additional information
requested below, we will have to move toward denial of your application as required by 15A NCAC 2H
.0506 and will place this project on hold as incomplete until we receive this additional information.
Please provide the following information so that we may continue to review your project.
Additional Information Requested:
1. Please provide the location of any proposed stormwater management practices as required by
GC3704.
2. Please provide plans and profiles for all the stormwater management devices as required by
GC3704.
3. Please indicate all stormwater inlets and outfalls on the site plan.
4. Please provide an inventory of proposed project imperviousness area based on the estimated
built-out conditions. Please include all proposed building footprints, roads, driveways, sidewalks,
gravel-surfaced areas, amenity areas, etc.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.ne.us/newetlands
None Carolina
Ntura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Brookwood Capital
Page 2 of 2
February 29, 2008
5. Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow
provision measure worksheets and signed and a notarized Operations and Maintenance
Agreement.
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to disgt*s this matter.
CBK/ijm
SincerelW- /L,:- C yndi Karoly, upervisor
Supervisor
01 Oversight/Express Review Permitting Unit
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Jeff Harbour, ESI, 524 S. New Hope Road, Raleigh, NC 27610
080347B rookwoodCap italS ite(Wake)On_Hold