Loading...
HomeMy WebLinkAbout20160642 Ver 1_More Info Received_20160711Strickland, Bev From: Norton Webster <nwebster@palustrinegroup.com> Sent: Monday, July 11, 2016 8:48 AM To: Smith, Cherri L Subject: Carolina Lake, Raleigh, Wake County, NC Cherri, I hope you had a great weekend. Below are the temporary buffer impacts for the stream stabilization. Please let me know if you need any additional information. Also, thank you again for responding so quickly to this permit request. Norton 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Neuse Tar -Pamlico Other: Project is in which protected basin? Catawba Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Permanent (P) or Reason Buffer Zone 1 impact Zone 2 impact Temporary (T) for mitigation (square feet) impact Stream name required? (square feet) B1 P T Stream UT to Crabtree Creek 27,000 18,000 access No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 27,000 18,000 6i. Comments: Channel will be stabilized thus protecting the existing herbaceous riparian buffer. Permanent seeding as well as native woody vegetation will be replanted once stabilization work is completed. Norton Webster Palustrine Group P.O. Box 603 Pittsboro, NC 27312 Phone: 919-548-0949 nwebster(2d.palustrine=r�oup.com www.palustrinegroup.com Palustrine Group Economic sense. Ecological success.