HomeMy WebLinkAbout20160673 Ver 1_Application_20160707Carpenter,Kristi
From: Murray, Christopher A
Sent: Thursday, July 07, 2016 12:06 PM
To: Alsmeyer, Eric C SAW; Ridings, Rob
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Eric and Rob,
Carpenter,Kristi
NCDOT Division 5 Permit application package for Bridge 340026 over Crooked Creek
on NC 98 in Franklin County (WBS: 17BP.5.R.50)
Bridge 340026 Permit package cover info.pdf; Bridge 340026 FInal Permit Package.pdf
Follow up
Completed
NCDOT Division 5 is submitting a permit application for the replacement of Bridge 340026 over Crooked Creek on NC 98
in Franklin County. This project is part of the NCDOT Division 5-- State Funded Year 4 program. Please contact me if you
need further information.
Sincerely,
Chris Murray
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Transportation
July 7, 2016
USACE
Raleigh Regulatory Field Office
3331 Heritage Trade Drive
Suite 105
Wake Forest, NC 27587
Attention
Subject:
Dear Sir:
Eric Alsmeyer
Project Manager
PAT McCRORY
Governor
NICHOLAS J. TENNYSON
Secretary
Project Number (aka WBS number): 17BP.S.R.50
Structure No. 340026 over Crooked Creek on NC 98 in Franklin County
The North Carolina Department of Transportation (NCDOT) proposes to replace this bridge. This project
is similar in nature to projects processed under the Low Impact Bridge Replacement Program (LIBRP).
Accordingly, the LIBRP format has been utilized in the permitting of this project. A site visit was
conducted by USACE on June 26, 2014.
The following are attached to this cover letter:
Low/Minimal Impact Bridge Data Sheet
Attachment L: LIBRP impact data sheet
Stormwater management plan
Riparian buffer permit drawings
Stream/Wetland permit drawings
USFWS Concurrence letter
If you have any questions or need additional information, please contact Mr. Chris Murray at (919) 220-
4633.
Sincerely,
C.� �`' `�`�.
J. Hopkins, P.E.
Division Engineer
c: Division 5 file, NCDOT
Rob Ridings, NCDENR-DWR
�Nothing Compares��_
State of North Carolina j Department of Transporlation � Division Five Office
2612 North Duke Street � CS # 17-27-03 � Durham, North Carolina 27704
919-220-4600 Telephone � 919-560-3371 Fax
Petric : L ��^Crory
GaveE r ,�
Q°���
�
1NCDENR
P.ort{ � Carolina D�partment of Environment and Na`arul ResQurcEs
G;vis an cf V�later Q�al ;
Cc. � �� H. Sullins
C' ;tor
Attachment L: Low Impact Bridge Replacement Process
Project Number (aka WBS number): 17BP.5.R.50
Bridge No. 340026 over Crooked Creek on NC 98 in Franklin Co.
Donald R. van der "aart
�ecreta,
This project can be characterized as meeting the parameters associated with the Low
Impact Bridge Process as agreed to on October 6, 2009. Accordingly, this project
meets the documentation requirements and approval procedures under NEPA, as
defined by FHWA, for Low Impact Bridge Replacements. This project meets the
standards of NCDOT Minimum Criteria Rules.
Date: July 7, 2016
Applicant Name: Joey Hopkins, P.E.
Applicant Address: 2612 N. Duke Street
Durham, NC 27704
Primary Contact for Project: Chris Murray, PWS
Phone Number: (919) 220-4633
Is this an after-the-fact application:
River Basin: Tar-Pamlico River
Yes X No
Stream Classification: C; NSW with DWR Index Number of 28-30
Regulatory Authorization Options for this Activity
Federal: Stream and Wetland
State: Stream, Wetland and Riparian Buffer Authorization
Local: None
Project Description: See attached spread sheet for project-specific information.
Permanent Impacts: See attached permit drawings and summary sheets. Note
stream, wetland and riparian buffer impacts.
Stormwater Infor ation: See attached stormwater management plan.
��Signature:
Print Name: Christopher A. Murray, PWS
Title: Division 5 Environmental Supervisor
Tra por;af��n � . l,'nit
1 0`�il Se. .;e Cc- "'�.ieigh, Na€1'. Ca: ;�, 27699-; �5J
Locatan: 2321 Cr�h_r e B:�d., R< <gh, , th Caroi' 2;,�;.�
P.c _: �,; 733-i7F:i'; F..X: _ 33.';9�
'�`orr :: �`-: -?_a.er sta,:.�c.t��(nc vE ar.d: ,
. i r, . .. t �,f:r. ., v A._ _ 'c .
C3,lc .
1 ��?l'�i? ��it"G!lIla`�
��l %rtt�r�Tri�l�
Low/Minimal impact Bridge Project Data Sheet
WBS 17BP.5.R.50
Coun Franklin
Bridge Number Bridge 340026
Description Bridge No. 26 over Crooked Creek on NC 98
Basin Tar-Pamlico River Basin
Classification C; NSW
Stream SIN
28-30
TYPe rennial stream
Size 60 linear feet wide
.TYPQ RC Floor on I-Beams, TIM. CAP/TIM Piles
Existing Structure Size 1 22'9, 1 22', 1 22'1, 1 22'9
Suff. Retin
Proposed Structure Type
Stream USACE Impacts (LFj
Non 4041mpacts {LF
USACE Impacts (AC;
Wetlands Non 404 Impacts (AC
CAMA Imnacts tAC1
Buffer Application Required (>40 f
NC DWQ StormWater Permit Requ
Habitat (yln)
T8�E
Species Present
Bio Conclusion
Moratorium '��"
Dates
Native
Trout Waters Trout
Trout
WRCI
CAMA AECs
Essential Fish' Habita
Nav_' �oenii
Tribal Lands
4(� Resources
6(� [LWCF] Resources
Wiid and�Scenic Rivei
Forest Service Lands
NA Area
FEMA Buyout
FEMA Flood Study
USTs Haz Mats
Relocatees
Location �T
LONG
;t Comments
Completed by:
7/5/2016
19.6
_ 54" Prestressed Concrete Girder wi 4' Caps
1 40' 1 110' 1 40
0.0 ac
Permanent: 79 linear feet permanent stream imapct of (79
temporary is concurrent within this limit)
N1A
0.01 ac
OA acre
Not Applicable
7,032 sf BZ1; 3,720 sf BZ2
Yes
No
bald segle: No
dxeA uetlgemussel: Maryinal
Tar River spinymussel; Marpinal
Michauz'a wmac: Nc
NortMm b •eared bat Poasible
beld eaple; No
dwarl wedgemussW �� No
Tar Rivx spinymussel: No
Michauri3 wmac: No
Northem bng•eareA bal: Por.s�ble
bald eaple� No ENect
dwarf v�edgemuseel: MANLTAA
7ar River spinymussM; MANLTM
Micha�ix's wmac: No EHect
NortM1ern bng-eared ba1: MANLTAA
_ Not Appiicable
Not Applicable
Not Applicable
__ Not Applicable
Not Applicabie
Not Applicable
_ Not Applicable
No
__ _ Not Ao�iicable
t' i �
�� ���
on Bridge Program M
l � ^ L��i
\_J � �
3
No Survey Required
No
No
No
No
Limited Detailed Study - MOA Type 2B approved 4J9J2015
No
No
35.938649 deg.
78.208812 deo.
Division Environmental Officer
i�nit�:d �t��t�s I)�;�artmr'nt �►f Xhe IntLrit�r°
i�i„H �4NL� �1'��7Li�' �° 5���'t1I��
�ais:i,�k� :' �Ed C3:'. :�
�` yst C#�ice �io� �:;7�d
ilaiei�;;�, �ortl� �.w.c�Ii��<.'�7�3�-37?�5
r r,<
Christopt�er .A. Murr�ay
Aiar�h Carolina Uepar�nent c�f Tr�nspor�aiian
26I2 Nort.h Duke Street
Durbarzt, Nc�rth Carolina 277�4
11:1ear Mr. iVlur�ay:
This letter is in respons� t€� your letter ofJuly 1, 201b which provided the U.S. Fish and WiIdiife
Service (S�rvice) ,vith tlae bioia,�ical canclusic�n of t�e hiorth Carolina D�epartment �f
Transpnrtation (N�CD{)T) th�t the repIac�ment of Bridge Nc�. 26 on NC 9$ over Croaked Creek
in Franklin �ouniy may �`f'ect, but is not lil�eiy to ��verseiy affect the federally endanger�ed
dwarf wed�amussei ��11rrs.nidotxta heterodot�} and Tar River spinymussei (Elliptio
steinstatrsanu}. Tn additian, the N�D�T has c�etermined that the project �vilI ha°�e no ef�ect on
the federaliy endangered �Iichaux's sumac (Rh�ts michrruxii}. 'i'hese comments are provided in
ac�ordance with �ection 7 ofthe �ndangered Spec�es �Act �ESA) of I973, as atnemded {16 U.S.C.
IS31-15�3}.
Accordin� �o infc�rmation provide�3, a rnussel survey was conducted at the project sits on Octaber
1 I, 2013, The survey extencied from approxin�at�ly 4fl4 meters cl�wnstream of the brid�e to i0�
meters a�pstrearn fl� the bridge. Althott�h ft�ur cvmmon species of musseIs v��ers observec€,
neither af tkle £ederaily i�stcd specivs was f�und. I�revious surveys canducted in July 20I 1 had
�imilar results. Althou�h d�rrari ��aedg�rnus�els ha�re nuver be�n observ ;�i ne�: the prc�ject area,
the species has histarically been abserved far�her upstream and downstream. The Tar Iiiver
sp�nyrnussel has ���v�r �een record�d fr�m Crooked Creek, but �:as i�een histaricai4y observed in
thp Tar River, ta�e receiving stream for �roc�ked Creek. A plant suruey ofthe p%�vet are�. was
conducted on Februaxy 25, 201�. N� specimens of any su�ac (Rhtts) sper,ies were t�bserved.
Baspd an the mussei survey resuits and otlrer �vailPsble inforrnGtion,1.he �ervice cc�ncc�rs with
yo�r c4nclusio� tha� �iie prc�pas�c� �rc�}��t may aff4cis bt�� i5 �iot lik�Iy tt> adve�sely �ffe�t the
dw�rf wedgemussel �nd �"ar itiver spinyzanussel. ���e a.�s�r cc�ncur �.hat the pro�ject will have no
ef%ct on Niichaux's sumac. The feder�tlly threatened northern l�rng-eared bat �Ivlyatas
se�tentr�iana�is} }�as been ��re•��iously addres��d throu�h a�rc�graa�ma�ic fc�rmal cc�nsultatic�n. We
�mliev�; that ii�e recuirements Q��Wction 7{a)(2} of �i�e �SA hav� b�en satisfed. �Ve r�mind ys��
tiiai obli;��itions un�ir:r Sect�on 7 consultation m�zs� be rec�nsider�d if•. (1 } new in.�°t�rrnati�n
reveals irnp�acts t�f this i�entified actit�n th�,t may affect iist�d spec?es c�r criti�al habitat in a
manryr not pr:�vic�zasly consid�red in tl�is r�view; {2) #�ais a,i?or� �s subs�q��ntiy modi�ed in a
rnanner that was not c�nsider�d �n this review; ar {3j a new species is iist�ci or criti�al h�bitat
det�rm�n�u t�1ai may be affe�teci t�y t�is icientif ed �aiion.
The Service appreeiates the apportunity to review this proJect. If you have any questic�ns
regarding our response, please contact Mr. Gary Jardan at (9 i 9) $56-4520 (Ext. 32}.
Sincerely,
Pete Benj in
Field Supervisor
Electronic copy:
Eric Alsmeyer, USACE, Wake Forest, NC
Travis Wilson, NCWRC, Creedmoor, NC
Hi�;hWay North Carolina Department of Transportation �
Stormw�ter M
,,,,,�„�,,, Highway Stormwater Program �_�
STORMWATER MANAGEMENT PLAN
(Version 2.02; Released April 2015) FOR NCDOT PROJECTS
WBS Element: 17BP.5.R.50 TIP No.: County(ies): Franklin Page 1 of 1
General Project Information
WBS Element: 17BP.5.R.50 TIP Number: Project Type: Brid e Replacement Date: 9/23/2015
NCDOT Contact: W. Galen Cail, PE Contractor / Designer: Brandon Barham, PE - Ecological Engineerin
Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway
Ralei h, NC 27610 Suite 101
Car , NC 27518
Phone: 919-707-6711 Phone: 919-557-0929
Email: cail@ncdot. ov Email: bbarham@ecolo icalen .com
Cit /Town: Ralei h Count (ies : Franklin
River Basin(s): Tar-Pamlico CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet): 021 Miles Surroundin Land Use: Rural area with forest and agricultural landuses
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 1.00 ac. 0.50 ac.
Typical Cross Section Description: 2@ 12 ft lane, 8 ft shoulders, with total bridge width of 43.0 ft and total bridge length of 2@ 12 ft lane with total bridge witdh of 30 ft and total bridge length of 90 ft.
190 ft.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 2200 Year: 2015 Existin : 2200 Year: 2015
General Project Narrative: State Project 178P.S.R.50 involves the replacement of the existing NCDOT Bridge #340026 on NC 98 over Crooked Creek. Bridge #340026 consists of 1@22' - 9", 1@22'-0",
(Description of Minimization of Water 1@22'-1 ", 1@22" - 9" timber floor on I-Beams with timber caps on timber piles with timber abutments. The proposed bridge at #340026 will be a 1@40', 1@110 1@40'
Quality Impacts) prestressed concrete girder bridge with 4'-0" caps and sloping abutments. The proposed bridge is located in Zone AE of FIRM Map number 3720273099J and was studied by
"Limited Detailed" methods. The proposed bridge will provide more hydraulic opening than the exising bridge. Tow stormwater outfalls are proposed which will be placed at a
distance to minimize disturbance to adjacent wetlands. A Rip Rap pad will be utilized to dissipate the energy at each oufall.
Waterbod Information
Surface Water Body (1): Crooked Creek NCDWR Stream Index No.: 28-30
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Su iemental Classification: Nutrient Sensitive Waters (NSW)
Other Stream Ciassification: None
Impairments: None
A uatic T&E S ecies? Comments:
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Project Includes Bridge S anning Water Bod ? Yes Deck Drains Discharge Over Buffer? Yes Dissi ator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
�
.,
�
V
W
O
�
�
•�
�
V
�
�
O
V
OFFSITE DETOUR ROUTE
See Sheet 9-A For Index of Sheets
See Sheet 9-B For Conventional Symbols
����� ��° ������ ������r���
��������� �� �����.���
FRA1�ll�LI1� COUI�TY
LOCATI011i: BRIDGE 1V0.26 OVER CROOKED CREEK
O1V NC 98
BUFFER DRAWING �R�LIl`'bIN.�R� �t,.�Ns
SH E ET O F DO NOT [15E FOR CONSTRIICTION
TYPE OF WORK GRADI11lG, DRAINAGE, PAVING, A111D STRUCTURE
BUFFER IMPACTS PERMIT
BEGIN BRlD6E
—L— POT STA/4+5/
B�N�
�
BE�IN STATE PROJECT l7BP.5.R.50
—L— POT STA10+50.00
CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
—L—
NC 98
�:�':;:':�:�'.�
�
END BRIDGE
�41tl L►y/_� �L:Yil��l�:
SPRING HOPE -
END STATE PROJECT l7BP.5.R.50
—L— POT STA/8+/0.00
�,,-
STEWART�
NC FIRM LICLNSL No�. F-1199
1 t� l SL Cnry Park�+�y S�i tc t nl
�Ca�y NL 2J518
� 1919) 55'1-0929
ECOLOGICAL
ENGINEERING
Prepared �� �he o��e ot� HYDRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH STEWART, Inc.
LENGTH ROADWAY STATE PROJECT 17BP.5.R.50 = 0.108 mi. F��
SO ZS O SO �OO ADT = 2200 NOXTH CAROLINA �� Q�����
DEPARTMENT OF TRANSPORTATION
LENGTH STRUCTURES STATE PROJECT 17BP.5.R.50 = 0.036 mi. �� �`�.�
_ V= SS MPH 20/2 STANDAI2D SPEC7FICAT/ONS �P ��
PLANS TOTAL LENGTH STATE PROJECT 17BP.5.R.50 = 0.144 mi. �.E. � $
CLAS$ = MINOR RIGHT OF WAY DATE: � a
ARTERIAL MAY 18, 2015 AND�YE TOUN G PE srcuaru�: �
50 25 0 50 100 ROADWAY DESIGN ENGINEER � �
REGIONAL TIER R7GHT OF WAY MICHAEL BURNS, EI ��, �e
PROFILE (HORIZONTAL) COMPLETE: reoJscr nss,cN En�cr,vErn �p, ��
PENDING �� v�Ae���
l0 5 0 l0 20 LISA GILCHRIST, EI
LETTING DATE: Ncnoz coxracz
PROFILE (VERTICAL) JANUARY 11, 2017 P�
SIGNATURE:
�-
e,
_"Y / ' / � /A /� /A�
DETAIL 1 DETAII 2 DETAIL 3 /�/ �� �i
SPECIAL CUT DITCH SPECIAL CUT DITCH BANK STABILIZATION � � �
�N ��o s�aiei �N r�o s�aie� �Ho�ro s�oiai � �/� / A/ \/ A/ \
� pc��' rm��. �Q / � \ �\/ \ �\
,,,oi ti� �e� °ioa� How�oi d�` Ne< s oP r �Q � / /\ � /\ �
Grou�d ?/ p F\o Gmund z'! D F\o Gro�nd 10'min. � �
d d `�'I'ti � �� � x%� ��T�'��'� �
�,o�„��e �eo�e.��e s,p(� / r / i� � i� i `
M'n. D-�1 Ft M'n. D 1 Ff. GEOTE%TILE !
Type ofLner= Class B Rip-Rap Max.d-1 Ft. Type o(liner= Class I Ri�Rop Max d=1 Ft. / V� / �/ / X�\/�X/\ /\
FROM STA.11+94 TO STA.13+45 -L- RT FROM STA.12+50 TO STA.73+48 -L- LT TVPe °}�'^er= t6o ooTF�criiER�P-R90 s O,� �/ � � /\ vx
FROM STA.16+65 TO STA.18+00 -L- RT FROM STA.14+94 TO STA.15+12 -l- —� 1� �� ��/� /�/
FROM STA.15+79 TO STA.15-99 —L— ���\ �% �\
� ALLOWABLE IMPACTS ZONE 1 �'�� xV
BUFFER DRAWING
SHEET OF �, �---�" -
\������ ALLOWABLE IMPACTS ZONE 2 — — �
�
BEGIN STATE PROJECT 17BP5R50
—L— POT STAlOt50A0
SITE 3
/� /'/�i
/�/
//
�/
/
/
.. 1 GRAU 350
SPECIAL CUT DITCH
W/CLASS I RIP RAP
SEE DETAIL 2
/\ DDF = 12 CY
\
I � CLA55 B RIP
/ EST 3 TON
� 1 EST 70 SV
. . GEOTEXTILE
C �_^.-... - . �
e.i� ,�_� �_----_.
F
C �15` W"-
\ \:
SITF I \, � ,\
A \
CLASS II RIP RAP �. $
BANK STABILIZATION `. o
SEE DETAIL 3
E5T 110 TONS
EST 125 SV GEO7EXTILE m
(STRUCTURE PA ITEM)
C SS II RIP RA
F // �
� , �/ i
SI T E I NDOBENTLANDRPIOCE BANK S I T E L
/ j j �///� l
, �/� ELBOWS
J � �� i � << u,
C1A55 B RIP RAP IN 1\
EST 3 TON
E5T 10 SY CLA55 B RIP RAP
GEOTEXTILE � E5T 3 TON ��\ CL4S5 II RIP RAP
E5T70 • ' `.�• ' �.�• s, BANK STABILIZATION
GEOTEy1L�'.�• ','.�� ',�.� SEEDETAIL3
-SPECIAL CUT DITCH • EST 50 TONS
W/CLASS B RIP RAP • �'\ EST 65 SY GEOTE%TILE ;
SEE DETAIL 1 , (STRUCTURE PAV IZEM�„j
�
DDE = 28 GY ,'-� `\
SITE 3 � �
\ \
SITE 4
�STABALIZATION WITH CL4$$ II
RIP RAP TO AREA SHOWN ON
STREAMBANK (DETAIL 3) USE
IMPERVIOUS DIKE NCDOT STANDARD
BMP ALONG $TREAMBANK TO
DEWATER AND ISOLATE ADIACENT
WORK AREA TO REMOVE ExISTING
END BENT AND INSTALL STABAIIZATION
IN THE DRY. THE PLACEMENT OF
IMPERVIOUS DIKE IS CONSIDERED END STATE PROJECT (IBP5.R.50
NDDBENTLAND RNST�ALLATOFNTOF -L- POT STA/S"fIO.00
THE BANK STABALIZATION.
� S I T E 2 —L— POT Sta.18+5p,0p
JI4.41Ny , ..
A55 II RIP RAP
Fi F
/
� �
�T� �* ��
R �
GLA55 B RIP RAP
PROJECT REFERENCE NO. SHEEf NO.
178P.5.R.50 4
WW SHEEf NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
1DRELIMIN RY PLANS
DD NOT U56 PO CONSTRUCTiON
INC�MPLE E PL.�NS
DO NOT V56 FOR /W ACUVLSI7TON
�EC0�,90GICAL
—� ENG[NEERING
50' 0' 100'
GRAPHIC SCALE
I50' 0' 300'
WSET GRAPHIC SCALE
E%IST��;
.,Z----_ --_—__.
p H o'
aU p. '°___ NC HNY 98 :_�
EST 3 TDI� . ..�;.rw. .,�_
EST 10 5Y
GEO7E%TILE
, � �. _ '- . . -.. .rY. r±"�_..
SPECIAL CUT DITCH
W/CL45S B RIP RAP
SEE DETAIL 1
ODE = 24 CV
SITE 4
V J
� CL/�
% J
vAR. .s.
TYPE B-77
-
> N O �
U
TYPE 8-77
61
S
��
'F L7C/'/�/ RL
�
�
; � PROfILE.SEE SHEET 5
TYPE B-77 GRAU 350
c�i N n i �
TYPE B—�� �� GRAU 350
VAR. PeSe �'
—L JIU.I`tT;JIeVU
PAVEMENT—BRIDGE RFl_ATIONS�HIP SO�CTCI��f �NOT TO SCl1LE)
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
ROAD PARALLEL ZONE1 ZONE2 TOTAL ZONE1 ZONE2 TOTAL ZONE1 ZONE2
SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ftz) (ft2) (ft2) (ftz) (ftz)
1@40', 1@110',1@40', 54"
1 PRESTRESSED CONC. 14+81 TO 15+49 -L- LT X 1518.8 790.3 2309.1
GIRDER
1@40', 1@110',1@40', 54"
2 PRESTRESSED CONC. 15+89 TO 16+44 -L- LT X 1386.1 809.7 2195.8
GIRDER
1@40', 1@110',1@40', 54"
3 PRESTRESSED CONC. 14+27 TO 15+07 -L- RT X 1604.8 734.7 2339.5
GIRDER
1�D40', 1@110',1@40', 54"
4 PRESTRESSED CONC. 15+09 TO 16+29 -L- RT X 2522.2 1385.4 3907.6
GIRDER
TOTAL: �osi.s 3720.1 10752.0 0.0 0.0 0.0
Rev. May 2006
.,
�
V
W
O
�
�
•�
�
V
�
�
O
V
OFFSITE DETOUR ROUTE
See Sheet 9-A For Index of Sheets
See Sheet 9-B For Conventional Symbols
����� �� ������ ������ ���
�JI��`I�I[��� �1F I�II[�I�I�.��S
FRA1�ll�LI1� COUI�TY
PERMIT DRAWING �R�LIl`'bIN.�R� �t,.�Ns
SHEETOF DO NOT [15E FOR CONSTRIICTION
LOCATI011i: BRIDGE 1V0.26 OVER CROOKED CREEK
O1V NC 98
TYPE OF WORK GRADI11lG, DRAINAGE, PAVING, A111D STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN BRlD6E
—L— POT STA/4+5/
g�N� �
�
BE�IN STATE PROJECT l7BP.5.R.50
—L— POT STA10+50.00
CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
-L-
NC 98
�:�':;:':�:�'.�
�
END BRIDGE
—L— POT STAl6+4/.00
SPRING HOPE -
END STATE PROJECT l7BP.5.R.50
—L— POT STA/8+/0.00
� �.
STEWART�
NC FIRM LICLNSL No�. F-1199
1 t� l SL Cnry Park�+�y S�i tc t nl
�Ca�y NL 2J518
� 1919) 55'1-0929
ECOLOGICAL
ENGINEERING
Prepared �� �he o��e ot� HYDRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH STEWART, Inc.
LENGTH ROADWAY STATE PROJECT 17BP.5.R.50 = 0.108 mi. F��
SO ZS O SO �OO ADT = 2200 NOXTH CAROLINA �� Q�����
DEPARTMENT OF TRANSPORTATION
LENGTH STRUCTURES STATE PROJECT 17BP.5.R.50 = 0.036 mi. �� �`�.�
_ V= SS MPH 20/2 STANDAI2D SPEC7FICAT/ONS �P ��
PLANS TOTAL LENGTH STATE PROJECT 17BP.5.R.50 = 0.144 mi. �.E. � $
CLAS$ = MINOR RIGHT OF WAY DATE: � a
ARTERIAL MAY 18, 2015 AND�YE TOUN G PE srcuaru�: �
50 25 0 50 100 ROADWAY DESIGN ENGINEER � �
REGIONAL TIER R7GHT OF WAY MICHAEL BURNS, EI ��, �e
PROFILE (HORIZONTAL) COMPLETE: reoJscr nss,cN En�cr,vErn �p, ��
PENDING �� v�Ae���
l0 5 0 l0 20 LISA GILCHRIST, EI
LETTING DATE: Ncnoz coxracz
PROFILE (VERTICAL) JANUARY 11, 2017 P�
SIGNATURE:
DETAIL 1 DETAII 2 DETAIL 3
SPECIAL CUT DITCH SPECIAL CUT DITCH BANK STABILIZATION
� N f �o Smle� � N t lo Scale) 1 No� b Smle�
o p�.°�� 5'min.
� o� oe�n �` � �,
c,o��d ?:/ p �p� �e� s�oa� cmo�d Z:! p bF�o e� siore G.00�d l.a'mio � z
d d i�
Georen��le Min. D-�1 Ft. GBo1xt1e Min. D=1 Ff. GEOTE%TILE
Type of Liner= Class B Rip-Rap Max. d-1 Ft. Type o( l'iner= Class I Ri�Rop Max. d=1 Ft.
Type o}Llner= 160 TONS,CL II Rip-Rap
FROM STA.11+94 TO STA.13+45 -L- RT FROM STA.12+50 TO STA.73+48 -L- LT GEOTF�crilE= �90 s
FROM STA. 16+65 TO STA. 18+00 -L- RT FROM STA. 14+94 TO STA. 15+12 -L-
FROM STA.15+79 TO STA.15-99 -L-
�DENOTES IMPACTS IN PERMIT DRAWING
SURFACE WATER
* • � � DENOTES MECHANIZED SHEET OF
•�"►'"+'. CLEARING
BEGIN STATE PROJECT 17BP5R50
-L- POT STAlOt50A0
W/CLASS B RIP RAP
SEE DETAIL 1
DDE = 28 CY
�
SITE 2
SEE DETAIL 3
EST 50 TONS
EST 65 SY- GEOTE%TILE ; `�� �
\STRUCTURE FAK; IZEMi„i
J
� \
\ ��
�"�O
8
�9` O�I
REMOVE ALL PORTIONS OF
END 6ENT AND PLACE BANK
STABALIZATION WITH CLA55 II
RIP R,4P TO AREA SHOWN ON
STREAMBANK (DETAIL 3). USE
IMPERVIOUS DIKE NCDOT STANDARD
BMP ALONG STREAMBANK TO
w aKTnR aNDos°EMove ezisTir"ic END STATE PROJ/E��CT (IBP5.R.50
END BENT AND INSTALL STABALIZATION —L— PV/ �A/S"fIO�
PROIECT REFERENCE NO. SHEET NO.
178P.5.R.50 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
FRE]LIMIN RY FLANS
DO NOT U5B PO CONSTRUCTION
i °"°` I�ECOLOGICAL
��IGNGIN��RING
50' 0' 100'
GRAPHIC SCALE
200' 0' 400'
INSET GRAPHIC SCALE
E%IST�'::
Z----_ --_-__.
a
p NC HNY 98 :.
EST 3 TDrI � �. .. . -.,.:�;.r�.,-,.,:,_.
EST 10 5Y
GEO7E%TILE
- � .. .. <-���.rvtr±"` .
SPECIAL CUT DITCH
W/CL45S B RIP RAP
SEE DETAIL 1
ODE = 24 CV
FOR -L- PROfILE.SEE SHEET 5 I
SEE SHEETS S-ITHRU 5-34 FOR STRUCfURE PLANS
�
—L— JIU.lbrt91.VU
�✓AR. P.S.
TYPE B-77 `�' TYPE B-77 GRAU 350
�,
o`� o�% � Q � o`� o 0
—�_� � ��� � �
TYPE 8-77 � TYPE B-77 GRAU 350
� �
s
� VAR. PeSe
o�
� BEGIN BRIDGE
-L- Sta.14f5/v00
PAVEMENT-BRIDGE R_Fl_ATIONS�HIP SO�CTCI��f �NOT TO SCl1LE)
DETAIL 1 DETAII 2 DETAIL 3
SPECIAL CUT DITCH SPECIAL CUT DITCH BANK STABILIZATION
� N f �o Smle� � N t lo Scale) 1 No� b Smle�
o p�.°�� 5'min.
� o� oe�n �` � �,
c,o��d ?:/ p �p� �e� s�oa� cmo�d Z:! p bF�o e� siore G.00�d l.a'mio � z
d d i�
Georen��le Min. D-�1 Ft. GBo1xt1e Min. D=1 Ff. GEOTE%TILE
Type of Liner= Class B Rip-Rap Max. d-1 Ft. Type o( l'iner= Class I Ri�Rop Max. d=1 Ft.
Type o}Llner= 160 TONS,CL II Rip-Rap
FROM STA.11+94 TO STA.13+45 -L- RT FROM STA.12+50 TO STA.73+48 -L- LT GEOTF�crilE= �90 s
FROM STA. 16+65 TO STA. 18+00 -L- RT FROM STA. 14+94 TO STA. 15+12 -L-
FROM STA.15+79 TO STA.15-99 -L-
�DENOTES IMPACTS IN PERMIT DRAWING
SURFACE WATER
* • � � DENOTES MECHANIZED SHEET OF
•�"►'"+'. CLEARING
BEGIN STATE PROJECT 17BP5R50
—L— POT STAlOt50A0
�Uel 145 PG��473
�� � /
��, ��� � � � � I I I I l�. �� _�o �,;r� �,r� �
`—SYtCIAL (;iUl UIICFi
i�� W/CLASS ;B RIP RAP
SEE DETqIL 1�
DDE 28 CY
�'�
SITE 2
�"�O
8
�9` O�I
REMOVE ALL PORTIONS OF
END 6ENT AND PLACE BANK
woaK nR a To'REMove Ezis`TiNc END STATE PROJ/E��CT (IBP5.R.50
END BENT AND INSTALL STABALIZATION —L— PV/ �A/S"fIO�
SEE DETAI� 3 / j �.
EST 50 TONS m / /
EST 65 SY GEQ TE%TILE `� � /
(STRl7CTlfRE PA`7��JEN��,J � � ( G \
. � .�/ . (�"��\
\ /
� -' /�rN\ RG.�C: E�WpBQS�
� \.. wo�7i7., .�
\ r� _
-SPECIAL� CUT DITCH
W/CL455 B RIP RAP
SEE DETAIL 1
ODE = 24 CY
LIVING TR[JSi
�
PROIECT REFERENCE NO. SHEET NO.
178P.5.R.50 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
FRE]LIMIN RY FLANS
DO NOT U5B PO CONSTRUCTION
i °"°` I�ECOLOGICAL
��IGNGIN��RING
50' 0' 100'
GRAPHIC SCALE
200' 0' 400'
INSET GRAPHIC SCALE
NC HNY 98 20' B57
�4,.r-:..._. .. ..
^�._rn��-' �..
w000s
FOR -L- PROfILE.SEE SHEET 5
SEE SHEETS S-ITHRU 5-34 FOR STRUCfURE PLANS
✓AR. P.S:
� TYPE B-77 `�' TYPE B-77 GRAU 350
i
O N O� � �Q � O N O �
—�_� � ��� � �
TYPE 8-77 � TYPE B-77 GRAU 350
� �
s
� VAR. PeSe
o�
� BEGIN BRIDGE
-L- Sta.14f5/v00
PAVEMENT-BRIDGE R_Fl_ATIONS�HIP SO�CTCI��f �NOT TO SCl1LE)
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac} (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1@40', 1�a 110',1@40',
1 14+95 - 15+14 -L- RT 54" PRESTRESSED < 0.01 32
CONC. GIRDER
1@40', 1�a 110',1@40',
2 15+20 - 15+70 -L- RT 54" PRESTRESSED < 0.01
CONC. GIRDER
1@40', 1�a 110',1@40',
3 15+78 - 15+87 -L- LT 54" PRESTRESSED < 0.01 47
CONC. GIRDER
TOTALS: < 0.01 < 0.01 79.00
Mechanized Surtace Water
Clearing In �mpacts
Wetlands (Sq. Ft)
Impacts: (sQ. F'�
Ske 1 0 126
Site 2 361 0
Ske 3 0 238
Total 361 364
3131/05
Rev.Jan 2009