Loading...
HomeMy WebLinkAbout20120821 Ver 3_Notification of Mod of Impacts_20160706Strickland, Bev From: Beasley, Troy <TBeasley@withersrave nel.com> Sent: Wednesday, July 06, 2016 4:04 PM To: James Lastinger Qames.c.lastinger@usace.army.mil); Smith, Cherri L Subject: South Lakes Subdivision - Fuquay, Wake County - Notification of Modification of Impacts for Sewer Crossing in Phase SF -7 (SAW-2012-2012-01484)(DWR Proj # 12-0821) James/Cherri, Per our phone conversations, I have attached the notification for the revised impacts associated with the relocation of the sewer crossing (Sheet D — Impact 5) in Phase 7 of the South Lakes Subdivision. The relocation of the sewer crossing is necessary to match the design of the Wake County high school design on the property to the east. I have provided the previously approved impact maps, as well as a revised Sheet D that shows both the previously approved sewer crossing within Phase SF -7, as well as the revised location/impacts for the relocated sewer crossing. The relocation of the sewer crossing has resulted in a reduction of the temporary wetland impacts for this crossing, as well as the elimination of 48 If of temporary stream impacts and 4,538 sf of permanent buffer impacts. Per our conversations, since the relocation of the sewer crossing will minimize impacts, submittal of the notification of the relocated crossing and updated impact exhibit is sufficient, and issuance of modified 404/401 permits is not required. Please respond to this email concurring that this is correct so that we have documentation for our files. Thanks for your help with this project. Troy Beasley a 1410 Commonwealth Drive, Suite 101 1 Wilmington, NC 28403 Office: 910.256.9277 1 Direct: 910.509.6512 Mobile: 910.622.0122 tbeasleykwithersravenel.com CONFIDENTIALITY AND NONDISCLOSURE