Loading...
HomeMy WebLinkAbout20160299 Ver 1_Yadkin impacts R-2536_20160610 (3) Carpenter,Kristi From:Wrenn, Brian L Sent:Friday, June 10, 2016 1:00 PM To:Dilday, Jason L Subject:RE: Yadkin impacts, R-2536 Great! Thanks for looking through the numbers. I’ll just wait to hear from you about the rounding before I get the correction out. Thanks, Brian Wrenn 919-707-8792 From: Dilday, Jason L Sent: Friday, June 10, 2016 12:43 PM To: Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: RE: Yadkin impacts, R-2536 Brian, I’ve found all but 1 foot of the discrepancy in the mitigation values by HUC. There was one other stream (SBB-B) that was mistakenly put in the Cape Fear that should have been in Yadkin 04. That accounts for 330 of the 331 feet difference between your total and ours. I’m scratching my head about the dangling 1 foot. I’m going to ask the consultant for the Excel spreadsheet so I can look at the raw numbers. Noticing on the total line, he has it totaling 31,991.66, but adding the whole numbers throughout its 31,993. So my guess is it’s a rounding issue. We just need to figure out which of the HUCs most deserves the hanging decimal points. Jason From: Wrenn, Brian L Sent: Friday, June 10, 2016 8:33 AM To: Dilday, Jason L <jldilday@ncdot.gov> Subject: RE: Yadkin impacts, R-2536 Jason, I hate to drag this out, but I’m having problems getting the Yadkin 04 and Cape Fear 03 totals to line up with yours. We have the same total impacts for the project, but there seems to be some differences between Yadkin 04 and Cape Fear 03. I’ve attached a spreadsheet with individual site impacts and totals for Yadkin 03, Yadkin 04 and Cape Fear 03. I’ve gone site by site comparing the impacts to the permit impact tables in the application and to the excel spreadsheet the consultant put together, but I keep coming up with different totals. Can you take a look at my spreadsheet and see if you see anything out of line? Thanks, Brian Wrenn 919-707-8792 From: Dilday, Jason L Sent: Thursday, June 09, 2016 2:12 PM 1 To: Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: RE: Yadkin impacts, R-2536 From the permit drawings: Site 44 = 231 lf Site 45A=202 lf Site 45B=264 lf Site 46=23 lf Site 47A=77 lf Site 47B=163 lf Total= 960 lf From: Wrenn, Brian L Sent: Thursday, June 09, 2016 2:07 PM To: Dilday, Jason L <jldilday@ncdot.gov> Subject: RE: Yadkin impacts, R-2536 Jason, Do you have a breakdown of those impacts by site that you can send me? Thanks, Brian Wrenn 919-707-8792 From: Dilday, Jason L Sent: Thursday, June 09, 2016 1:37 PM To: Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: RE: Yadkin impacts, R-2536 Brian, What I came up with was we needed to shift 960 lf from Cape Fear (03030003) to Yadkin (03040104). So the totals that were requested are as follows Cape Fear (03030003)=13,929 lf Yadkin (03040103)= 11,650 lf Yadkin (03040104)=6,413 Let me know if you need anything else. Jason From: Wrenn, Brian L Sent: Thursday, June 09, 2016 1:30 PM To: Dilday, Jason L <jldilday@ncdot.gov> Subject: Yadkin impacts, R-2536 Jason, I saw Beth Harmon this morning. She indicated that you had sent her the revised impacts for the Yadkin 03 and 04. Can you send those to me so that I can give her the DWR mitigation totals? Thanks. 2 Brian L. Wrenn Transportation Permitting Unit Division of Water Resources 919-707-8792 Brian.wrenn@ncdenr.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3