Loading...
HomeMy WebLinkAbout20160299 Ver 1_Yadkin impacts R-2536_20160610 (2) Carpenter,Kristi From:Wrenn, Brian L Sent:Friday, June 10, 2016 8:33 AM To:Dilday, Jason L Subject:RE: Yadkin impacts, R-2536 Attachments:Yadkin 03 04 mitigation subtotals.xlsx Jason, I hate to drag this out, but I’m having problems getting the Yadkin 04 and Cape Fear 03 totals to line up with yours. We have the same total impacts for the project, but there seems to be some differences between Yadkin 04 and Cape Fear 03. I’ve attached a spreadsheet with individual site impacts and totals for Yadkin 03, Yadkin 04 and Cape Fear 03. I’ve gone site by site comparing the impacts to the permit impact tables in the application and to the excel spreadsheet the consultant put together, but I keep coming up with different totals. Can you take a look at my spreadsheet and see if you see anything out of line? Thanks, Brian Wrenn 919-707-8792 From: Dilday, Jason L Sent: Thursday, June 09, 2016 2:12 PM To: Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: RE: Yadkin impacts, R-2536 From the permit drawings: Site 44 = 231 lf Site 45A=202 lf Site 45B=264 lf Site 46=23 lf Site 47A=77 lf Site 47B=163 lf Total= 960 lf From: Wrenn, Brian L Sent: Thursday, June 09, 2016 2:07 PM To: Dilday, Jason L <jldilday@ncdot.gov> Subject: RE: Yadkin impacts, R-2536 Jason, Do you have a breakdown of those impacts by site that you can send me? Thanks, Brian Wrenn 919-707-8792 1 From: Dilday, Jason L Sent: Thursday, June 09, 2016 1:37 PM To: Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: RE: Yadkin impacts, R-2536 Brian, What I came up with was we needed to shift 960 lf from Cape Fear (03030003) to Yadkin (03040104). So the totals that were requested are as follows Cape Fear (03030003)=13,929 lf Yadkin (03040103)= 11,650 lf Yadkin (03040104)=6,413 Let me know if you need anything else. Jason From: Wrenn, Brian L Sent: Thursday, June 09, 2016 1:30 PM To: Dilday, Jason L <jldilday@ncdot.gov> Subject: Yadkin impacts, R-2536 Jason, I saw Beth Harmon this morning. She indicated that you had sent her the revised impacts for the Yadkin 03 and 04. Can you send those to me so that I can give her the DWR mitigation totals? Thanks. Brian L. Wrenn Transportation Permitting Unit Division of Water Resources 919-707-8792 Brian.wrenn@ncdenr.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 Permanent Temporary Stream F>» �n Fill in Total Stream Impacts Site Numbe Surface Surface Impact Requiring Water Water (linear ft) Mitigation (linear ft) (linear ft) (linear ft) 23A 10 38 48 10 23D,23E 905 30 935 905 24 86 - 86 - 26 53 40 93 - 27 982 11 993 - 29 971 13 984 - 30 1,161 26 1187 1,161 48 334 21 355 334 49 100 10 110 - 28 520 10 530 - 47B 163 14 177 163 46 23 11 34 - 47A 77 10 87 77 45A 202 16 218 - 45B 264 13 277 - 44 231 26 257 - Totals 6,082 289 6,371 2,650 Permanent Temporar Mechanize Hand Excavatio Site Fill y Fill d Clearing Clearing (ac) (ac) (ac) n (ac) (ac) 23B 0.03 - <0.01 - - 23C <0.01 - - - - 23D 0.07 - - - - 23D 0.04 - - - - 23D <0.01 - - - - 24 0.01 - - - - 25 0.47 0.18 0.3 - - 26 0.05 - - - - 48 0.96 - 0.17 0.09 - 31 <0.01 - <0.01 <0.01 - Totals 1.63 0.18 0.47 0.09 0 Permanent Temporary Stream Fill in Surface Fill in Total Stream Impacts Site Numbe water Surface Impact (linear Requiring Water ft) Mitigation (linear ft) (linear ft) (linear ft) lA,1B 237 22 259 - 2 523 11 534 - 3 205 14 219 - 5 258 25 283 - 4A 69 10 79 - 4B 563 - 563 - 4C 795 20 815 795 4D 11 21 32 11 4E 753 10 763 753 6A, 6B, 6C 651 40 691 - 8A,18B,18 419 32 451 - 19 312 20 332 312 7 1,355 20 1,375 1,355 8 267 10 277 - 9 1,091 21 1,112 1,091 21 547 27 574 547 22 585 33 618 585 10 759 49 808 759 11 378 10 388 - 13 782 22 804 782 14 84 10 94 - 15 322 36 358 - 16 564 27 591 564 17 121 - 121 - Totals 11,651 490 12,141 7,554 Permanent Temporar Mechanize Hand Excavatio Site Fill y Fill d Clearing Clearing (ac) (ac) (ac) n (ac) (ac) 2 0.09 - - - - 2 0.03 - - - - 3 - - <0.01 - - 6A, 6B 0.33 - 0.02 - - 19 <0.01 - - - - 20 0.07 - - - - 8 0.18 - - - - 9 0.46 - 0.03 - - 12 0.02 - - - - 17 <0.01 - - - - Totals 1.18 0 0.05 0 0 Permanent Temporary Stream Fill in Fill in Total Impacts Site Numbe Surface Surface Stream Requiring Water Impact Water (linear ft) Mitigation (linear ft) (linear ft) (linear ft) 31 330 13 343 - 32 148 10 158 - 33 551 29 580 SSl 34 535 29 564 535 35 443 21 464 443 36 581 - 581 581 37A, 37B 101 70 171 - 104 345 49 394 - 38B 481 21 502 48l 40 534 22 556 534 39 3 11 14 - 41 352 12 364 352 43A 4 15 19 4 43C 85 10 95 85 57/58A 888 12 900 888 50 36 20 56 - 52 442 15 457 - ,56B,56C,5 921 41 962 - 53 327 21 348 - 55 401 21 422 - 59 5 88 93 5 60 275 62 337 275 61 274 10 284 - 62/63 290 163 453 290 64 413 10 423 - 64 48 29 77 - 65 339 86 425 339 66/67/68/69 297 143 440 297 70 360 24 384 360 71 402 35 437 402 72 716 66 782 716 73 164 30 194 - 74 306 130 436 306 75 277 48 325 277 6/76A/78/8 649 20 669 - 85 318 101 419 318 101/102/103 153 77 230 153 86 461 120 581 461 87 146 66 212 - 97/98 240 92 332 - 96 124 18 142 - 100 227 11 238 - 94 178 105 283 178 89 57 31 88 57 90 20 32 52 20 91 13 23 36 13 Total 14,260 2,062 16,322 8,921 6,082 11,651 14260 31,993