Carpenter,Kristi
From:Wrenn, Brian L
Sent:Friday, June 10, 2016 8:33 AM
To:Dilday, Jason L
Subject:RE: Yadkin impacts, R-2536
Attachments:Yadkin 03 04 mitigation subtotals.xlsx
Jason,
I hate to drag this out, but I’m having problems getting the Yadkin 04 and Cape Fear 03 totals to line up with yours. We
have the same total impacts for the project, but there seems to be some differences between Yadkin 04 and Cape Fear
03. I’ve attached a spreadsheet with individual site impacts and totals for Yadkin 03, Yadkin 04 and Cape Fear 03. I’ve
gone site by site comparing the impacts to the permit impact tables in the application and to the excel spreadsheet the
consultant put together, but I keep coming up with different totals. Can you take a look at my spreadsheet and see if
you see anything out of line?
Thanks,
Brian Wrenn
919-707-8792
From: Dilday, Jason L
Sent: Thursday, June 09, 2016 2:12 PM
To: Wrenn, Brian L <brian.wrenn@ncdenr.gov>
Subject: RE: Yadkin impacts, R-2536
From the permit drawings:
Site 44 = 231 lf
Site 45A=202 lf
Site 45B=264 lf
Site 46=23 lf
Site 47A=77 lf
Site 47B=163 lf
Total= 960 lf
From: Wrenn, Brian L
Sent: Thursday, June 09, 2016 2:07 PM
To: Dilday, Jason L <jldilday@ncdot.gov>
Subject: RE: Yadkin impacts, R-2536
Jason,
Do you have a breakdown of those impacts by site that you can send me?
Thanks,
Brian Wrenn
919-707-8792
1
From: Dilday, Jason L
Sent: Thursday, June 09, 2016 1:37 PM
To: Wrenn, Brian L <brian.wrenn@ncdenr.gov>
Subject: RE: Yadkin impacts, R-2536
Brian,
What I came up with was we needed to shift 960 lf from Cape Fear (03030003) to Yadkin (03040104). So the totals that
were requested are as follows
Cape Fear (03030003)=13,929 lf
Yadkin (03040103)= 11,650 lf
Yadkin (03040104)=6,413
Let me know if you need anything else.
Jason
From: Wrenn, Brian L
Sent: Thursday, June 09, 2016 1:30 PM
To: Dilday, Jason L <jldilday@ncdot.gov>
Subject: Yadkin impacts, R-2536
Jason,
I saw Beth Harmon this morning. She indicated that you had sent her the revised impacts for the Yadkin 03 and 04. Can
you send those to me so that I can give her the DWR mitigation totals? Thanks.
Brian L. Wrenn
Transportation Permitting Unit
Division of Water Resources
919-707-8792
Brian.wrenn@ncdenr.gov
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2
Permanent Temporary Stream
F>» �n Fill in Total Stream Impacts
Site Numbe Surface Surface Impact Requiring
Water Water (linear ft) Mitigation
(linear ft) (linear ft) (linear ft)
23A 10 38 48 10
23D,23E 905 30 935 905
24 86 - 86 -
26 53 40 93 -
27 982 11 993 -
29 971 13 984 -
30 1,161 26 1187 1,161
48 334 21 355 334
49 100 10 110 -
28 520 10 530 -
47B 163 14 177 163
46 23 11 34 -
47A 77 10 87 77
45A 202 16 218 -
45B 264 13 277 -
44 231 26 257 -
Totals 6,082 289 6,371 2,650
Permanent Temporar Mechanize Hand
Excavatio
Site Fill y Fill d Clearing Clearing
(ac) (ac) (ac) n (ac) (ac)
23B 0.03 - <0.01 - -
23C <0.01 - - - -
23D 0.07 - - - -
23D 0.04 - - - -
23D <0.01 - - - -
24 0.01 - - - -
25 0.47 0.18 0.3 - -
26 0.05 - - - -
48 0.96 - 0.17 0.09 -
31 <0.01 - <0.01 <0.01 -
Totals 1.63 0.18 0.47 0.09 0
Permanent Temporary Stream
Fill in Surface Fill in Total Stream Impacts
Site Numbe water Surface Impact (linear Requiring
Water ft) Mitigation
(linear ft) (linear ft) (linear ft)
lA,1B 237 22 259 -
2 523 11 534 -
3 205 14 219 -
5 258 25 283 -
4A 69 10 79 -
4B 563 - 563 -
4C 795 20 815 795
4D 11 21 32 11
4E 753 10 763 753
6A, 6B, 6C 651 40 691 -
8A,18B,18 419 32 451 -
19 312 20 332 312
7 1,355 20 1,375 1,355
8 267 10 277 -
9 1,091 21 1,112 1,091
21 547 27 574 547
22 585 33 618 585
10 759 49 808 759
11 378 10 388 -
13 782 22 804 782
14 84 10 94 -
15 322 36 358 -
16 564 27 591 564
17 121 - 121 -
Totals 11,651 490 12,141 7,554
Permanent Temporar Mechanize Hand
Excavatio
Site Fill y Fill d Clearing Clearing
(ac) (ac) (ac) n (ac) (ac)
2 0.09 - - - -
2 0.03 - - - -
3 - - <0.01 - -
6A, 6B 0.33 - 0.02 - -
19 <0.01 - - - -
20 0.07 - - - -
8 0.18 - - - -
9 0.46 - 0.03 - -
12 0.02 - - - -
17 <0.01 - - - -
Totals 1.18 0 0.05 0 0
Permanent Temporary Stream
Fill in Fill in Total Impacts
Site Numbe Surface Surface Stream Requiring
Water Impact
Water (linear ft) Mitigation
(linear ft) (linear ft) (linear ft)
31 330 13 343 -
32 148 10 158 -
33 551 29 580 SSl
34 535 29 564 535
35 443 21 464 443
36 581 - 581 581
37A, 37B 101 70 171 -
104 345 49 394 -
38B 481 21 502 48l
40 534 22 556 534
39 3 11 14 -
41 352 12 364 352
43A 4 15 19 4
43C 85 10 95 85
57/58A 888 12 900 888
50 36 20 56 -
52 442 15 457 -
,56B,56C,5 921 41 962 -
53 327 21 348 -
55 401 21 422 -
59 5 88 93 5
60 275 62 337 275
61 274 10 284 -
62/63 290 163 453 290
64 413 10 423 -
64 48 29 77 -
65 339 86 425 339
66/67/68/69 297 143 440 297
70 360 24 384 360
71 402 35 437 402
72 716 66 782 716
73 164 30 194 -
74 306 130 436 306
75 277 48 325 277
6/76A/78/8 649 20 669 -
85 318 101 419 318
101/102/103 153 77 230 153
86 461 120 581 461
87 146 66 212 -
97/98 240 92 332 -
96 124 18 142 -
100 227 11 238 -
94 178 105 283 178
89 57 31 88 57
90 20 32 52 20
91 13 23 36 13
Total 14,260 2,062 16,322 8,921
6,082
11,651
14260
31,993