Loading...
HomeMy WebLinkAbout20150636 Ver 1_Credit Release (Ph I) Task 1_20160630Water Resources ENVIRONMENTAL QUALITY June 30, 2016 Mike Hermann Watershed Investments NC, LLC 1630 Weatherford Circle Raleigh, NC 27604 Re: Neville Farms Mitigation Bank Instrument (MBI) Neville Farms Phase I Bank Parcel Credit Release — Task 1 Dear Mr. Hermann: PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWQ Project #: 2015-0636 Orange County On June 9, 2016, the Division of Water Resources (DWR) approved a Bank Parcel Development Package (BPDP) for the Neville Farms Buffer and Nutrient Offset Bank submitted by Watershed Investments NC, LLC (WINC) on May 10, 2016. On March 3, 2016, the DWR received a signed and recorded conservation easement for the subject site. Additionally, on June 27, 2016, DWR received a performance bond (#CEO 1492400035) for WINC with Philadelphia Indemnity Insurance Company, to cover performance obligations for the construction of the subject site. The term of the bond is until June 23, 2017 and will terminate upon DWR approval of the As -Built Report/s for both Phase I and Phase II. According to the MBI signed on January 7, 2016, the following Project Milestones for Phase I have been met, and the corresponding credits shall be released: Task/Milestones Credit 1) MBI and BPDP Approved by DWR, Conservation Easement Recorded 20% And Financial Assurance Posted TOTAL: 20% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract. Therefore, 20% of your Jordan Lake riparian buffer Preservation credits (0.20 x 2,700.7 ft' = 540.14 ft2) are now available for sale. In addition, 20% of your generated nitrogen nutrient offset credits (0.20 x 8,026.27 lb -N = 1,605.25 lb -N) and 20% of your generated phosphorus credits (0.20 x 532.09 lb -P = 106.421b -P) are now available for sale. Generated credits are credits that have not been applied to the appropriate delivery factor. The delivery factors applied to this bank due to its location in the 14 -digit HUC 03030002060070 are 89% for nitrogen and 79% for phosphorous. Therefore, the total amounts of nutrient offset credits for this site after application of delivery factors are 7,143.38 lb -N delivered and 420.34 lb -P delivered. By copy of this correspondence, 20% of your delivered nitrogen offset credits (0.20 x State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh, North Carolina 27699-1617 919 807 6300 Neville Farms Phase I June 29, 2016 Page 2 of 2 7,143.38 lb -N = 1,428.68 lb -N) and 20% of your delivered phosphorus credits (0.20 x 420.34 lb -P = 84.07 lb -P) are now available for sale. Please update your credit ledgers accordingly. Please note that only the delivered nutrient offset credits can be sold from this bank and must be used for authorized impacts in the Upper New Hope Sub -watershed. Additionally, the riparian buffer credits must be used for authorized impacts in the Upper New Hope Sub - watershed according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective on November 1, 2015. Buffer Preservation credits cannot be converted into nutrient offset credits. Please use the Credit Ledger Templates submitted with the MBI to track and report credit availability for the Neville Farms Phase I Bank Parcel. Upon receiving this correspondence, please submit three credit ledgers to DWR reflecting the availability of credits released for each mitigation type. Please feel free to call Katie Merritt at (919) 807-6371 if you have any questions regarding this correspondence. Sincerely, ` Karen Higgins, Supervisor 401 and Buffer Permitting Branch KAH/kym cc: File Copy (Katie Merritt)