HomeMy WebLinkAbout20160634 Ver 1_More Info Requested_20160606Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
June 6, 2016
REQUEST FOR ADDITIONAL INFORMATION
County of Wayne
Attn: Mr. George A. Wood, County Mgr.
Post Office Box 227
Goldsboro, North Carolina 27533
RE: Erosion and Sedimentation Control Plan No.: 2016-041
Project Name: Park East
Location: Gateway Drive County: Wayne
River Basin: Neuse Acres: 7.0
Date Received by LOS: June 2, 2016 Plan Type: New
Dear Mr. Wood:
PAT MCCRORY
covamor
DONALD R. VAN DER VAART
secrerary
Tracy Davis
Director
This office is in receipt of the draft erosion and sedimentation control plan (plan) and your check
no. 1475 in the amount of $ 455.00 as the plan review fee for the referenced project.
To expedite the approval process, we have performed a preliminary review of the plan and
determined that additional information, as indicated on the attached checklist, must be submitted.
To facilitate the review, the requested information must be received in this office by June 20, 2016.
The receipt of additional information will not ensure approval of the plan. Failure to meet the
indicated deadline could result in plan disapproval.
Also, be advised that if this project is located in a coastal county or in Wayne or Pitt Counties, a .
separate stormwater permit may also be required from this Section.
..................
Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior
to the approval of an erosion and sediment control plan is a violation of the Act and subject to an
initial and/or daily civil penalty assessment of up to $5000. If you have questions please do not
hesitate to contact me at the address or telephone listed below. Your cooperation in this matter is
appreciated and we look forward to working with you on this project.
Sincerer
�� /✓/ fn
ary A t)jbvak y
Enviro mental Senior Specialist
cc: yne Co. Development Alliance, Inc., P.O. Box 1280, Goldsboro, NC 27533
Immons Group, Attn: Mr. Blake Hall, PE, 5410 Trinity Rd. Suite 102, Raleigh, NC 27607
LQ File
State of' cnh Candua 1 emiroamental Quality'I Fnergy, Miami and Land Resources
Washington R4onal Office 1943 Washington Square Mall ) Wmhingtnn, NC 27889
PROJECT NAME: Park East
PROJECT NUMBER: Wayne -2016-041
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
LAND QUALITY SECTION
PRELIMINARY REVIEW CHECKLIST EROSION & SEDIMENTATION CONTROL PLAN
To expedite the approval process, a cursory review of your submitted Erosion Control Plan has been
made and has shown the need for additional information as specified below. Upon receipt of the
required information, a detailed review of the plan will be made and an approval or disapproval will
be issued.
An apparent buffer encroachment subject to the: _Neuse River Riparian Area Protection
and Maintenance Rule 15A NCAC 2B .0233). Encroachments on the protected buffers
require written approval by the Division of Water Quality (DWQ). A copy of your DWQ
approval or statement of exemption from the rule is required.-- Based on the information
provided (the soils map shows a possible blue line south of the proposed area)the project
appears to be within the riparian buffer of the stream south of the proposed construction.
No information provided to determine if the natural watercourse is exempted from the
Neuse buffer rules.
PLEASE RESPOND BY June 20, 2016