Loading...
HomeMy WebLinkAbout20160634 Ver 1_More Info Requested_20160606Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY June 6, 2016 REQUEST FOR ADDITIONAL INFORMATION County of Wayne Attn: Mr. George A. Wood, County Mgr. Post Office Box 227 Goldsboro, North Carolina 27533 RE: Erosion and Sedimentation Control Plan No.: 2016-041 Project Name: Park East Location: Gateway Drive County: Wayne River Basin: Neuse Acres: 7.0 Date Received by LOS: June 2, 2016 Plan Type: New Dear Mr. Wood: PAT MCCRORY covamor DONALD R. VAN DER VAART secrerary Tracy Davis Director This office is in receipt of the draft erosion and sedimentation control plan (plan) and your check no. 1475 in the amount of $ 455.00 as the plan review fee for the referenced project. To expedite the approval process, we have performed a preliminary review of the plan and determined that additional information, as indicated on the attached checklist, must be submitted. To facilitate the review, the requested information must be received in this office by June 20, 2016. The receipt of additional information will not ensure approval of the plan. Failure to meet the indicated deadline could result in plan disapproval. Also, be advised that if this project is located in a coastal county or in Wayne or Pitt Counties, a . separate stormwater permit may also be required from this Section. .................. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act and subject to an initial and/or daily civil penalty assessment of up to $5000. If you have questions please do not hesitate to contact me at the address or telephone listed below. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerer �� /✓/ fn ary A t)jbvak y Enviro mental Senior Specialist cc: yne Co. Development Alliance, Inc., P.O. Box 1280, Goldsboro, NC 27533 Immons Group, Attn: Mr. Blake Hall, PE, 5410 Trinity Rd. Suite 102, Raleigh, NC 27607 LQ File State of' cnh Candua 1 emiroamental Quality'I Fnergy, Miami and Land Resources Washington R4onal Office 1943 Washington Square Mall ) Wmhingtnn, NC 27889 PROJECT NAME: Park East PROJECT NUMBER: Wayne -2016-041 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES LAND QUALITY SECTION PRELIMINARY REVIEW CHECKLIST EROSION & SEDIMENTATION CONTROL PLAN To expedite the approval process, a cursory review of your submitted Erosion Control Plan has been made and has shown the need for additional information as specified below. Upon receipt of the required information, a detailed review of the plan will be made and an approval or disapproval will be issued. An apparent buffer encroachment subject to the: _Neuse River Riparian Area Protection and Maintenance Rule 15A NCAC 2B .0233). Encroachments on the protected buffers require written approval by the Division of Water Quality (DWQ). A copy of your DWQ approval or statement of exemption from the rule is required.-- Based on the information provided (the soils map shows a possible blue line south of the proposed area)the project appears to be within the riparian buffer of the stream south of the proposed construction. No information provided to determine if the natural watercourse is exempted from the Neuse buffer rules. PLEASE RESPOND BY June 20, 2016