Loading...
HomeMy WebLinkAbout20080347 Ver 1_Application_20080225ENVIRONMENTAL SERVICES. INC. 524 S. NEW HOPE ROAD RALEIGH, NORTH CAROLINA 27610 919-212-1760 • FAX 919-212-1707 www.environmentalservlcesinc.com 0 8 0 3 4 7 February 25, 2008 ~ 3o3d ~ PA-i~~ ' Ms. Cyndi Karoly NCDWQ-Wetlands/401 Unit ~~ 1650 Mail Service Center Raleigh, NC 27699-1650 Re: 401 and Buffer Authorization Request Wake County, NC Ms. Karoly, On behalf of the applicant, ESI is submitting the enclosed PCN requesting authorization to cross a stream channel and impact 0.02 acre of Waters of the United States. The proposed road crossing will also impact 0.32 acre of riparian buffer. An additiona10.17 acre of Zone 2 is proposed to be regraded and re-vegetated for construction of a parking area. Please contact me if you need to conduct a site inspection or if you have any questions regarding this application. Sincerely, ENVI`R/ONMENTAL SERVICES, INC. eff Harbour, PWS Asst. VP /Ecology Div. Manager D ~~ Attachments ~ ~~~ F~e2s2 fl~h °08 ER07-210.01 ~~r~NOSAN°S aRMwArERe ~+c~r FLORIDA • GEORGIA • NORTH CAROLINA • SOUTH CAROLINA ~ X03 d ~ Office Use Only: Form Version March OS 08-0347 USACE Action ID No. DWQ No, (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: --"'-"'- ® Section 404 Permit ® Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Cazolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check hexes ^ 5. If your project is located in any of North Cazolina's twenty coastal counties (listed on page 4), and the project is within a North Cazolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information ~ ~ ~ ~ ~ ~ ~ D 1. Owner/Applicant Information FFB ~ 5 2008 Name: Ms. Cazol J. Edwards ~~q OtNR - WATtR CIUAUTi' Mailing Address: C/O Brookwood Capital Attn. Mr. Lindsay Se Tei1NDS AND STORMW.4 R B P.O. Box 6242 Raleigh, NC 27628 Telephone Number: 919-624-1299 Fax Number: E-mail Address: lsewell(ir),nc.rr.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jeff Hazbour or Todd Milam Company Affiliation: Environmental Services Ina Mailing Address: 524 S. New Hope Rd. Raleigh, NC 27610 Telephone Number: 919-212-1760 Fax Number: 919-212-1707 E-mail Address: jhazbour(a),esinacc; mmilam~a,esinacc Updated 11/12005 n.,,`., a ,.C ~ ~ III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmazks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps aze provided. 1. Name of project: Brookwood Capital Site 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Properly Identification Number (Tax PIN): , 1723896750 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmazks, etc.): The project site is located apt~roximately 900 feet northwest of the intersection of US 64 and S. New Hone Road. Please see the attached vicinity map. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.7817 °N 78.5665 °W 6. Property size (acres): 40.2 ac 7. Name of nearest receiving body of water: Crabtree Creek 8. River Basin: Neuse River Basin (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin rnap is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site currently consists of pine/mixed hazdwood forest, with some disturbed/successional areas. in the. eastern yortion of the site. Crabtree Creek is the northern boundary of the site Two unnamed tributaries BUT) to Crabtree Creek are located within the~roperly Surrounding land use is commercial and industrial. Updated 11/1!1005 n,.,....c ,.c z ~ 1D. Describe the overall project in detail, including the type of equipment to be used: The ap lid cant proposes to construct one industrial building with accompanying_parkina and truck loading areas One road crossing is proposed over a jurisdictional stream (LJT to Crabtree Creek) to access usable uplands A stormwater pond will be constructed in uplands to collect and treat stormwater runoff Typical equipment will be used during construction including bulldozers graders back-hoes dump trucks etc. 11. Explain the purpose of the proposed work: The~urpose of the proposed work is to provide access to a proposed 150 OOOft2 building. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. ESI is not awaze of previous pernuts• however a database search was not conducted and maybe warranted V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permit requests are anticipated for this_project based on information that ESI currently has. VI. Proposed Impacts to Waters of the United StateslWaters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Updated 11/12005 n,.,.,. ~ .,c i ~ 1. Provide a written description of the proposed impacts: The proposed stream impacts result from one Ll,) road crossing that is necessary to access upland areas on the project site. Individual impacts have been avoided and minimized as much as practicable. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, se atel list im acts due to both structure and floodin . Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-yeaz Floodplain Nearest Stream Impact (acres) (indicate on map) herbaceous, bog, etc.) es/no) (linear feet) N/A Total Wetland Impact (acres) N/A 3. List the total acreage (estimated) of all existing wetlands on the property: 0 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact (indicate on ma) Before Im act (lineaz feet (acres) Culvert, retaining 1 UT to Crabtree Cr. wall, and velocity perennial 4 to 5 ft. 148 ft. 0.02 dissipater Total Stream Impact (by length and acreage) 148 ft 0.02 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma ocean, etc. acres NA Total Open Water Impact (acres) N/A 6. List t] ie cumulative im act to all Waters of the U.S. resultin from the ro~ect Stream Im act (acres): 0.02 Wetland Impact (acres): Updated 11/12005 n,...., o ,.r i ~ O en Water Impact (acres): Total Impact to Waters of the U.S. (acres 0.02 Total Stream Impact (linear feet): 148 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. N/A 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ®uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spiflway, etc.): Excavation in uplands Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Stormwatel` treatment Current land use in the vicinity of the pond: Forested Size of watershed draining to pond: TBD Expected pond surface area: f 1.7 ac VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The applicant has desimed the proposed development to avoid and minimize stream impacts_as much as practicable. Complete avoidance of the stream crossing impact does not allow access to the proposed development and does not meet the applicant'spurpose and need.. No other access routes are feasible due to US 64 to the south and Crabtree Creek to the north. The stream that is proposed to be crosses traverses the entire project site. The design incorporates retaining_walls to further minimize impacts to the stream. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Updated 11/1/2005 n,.,.,, n ..r i ~ freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - ]n accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but aze not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Cazolina (see DWQ website for most current version.). 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/lineaz feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. No miti-gation is currently proposed. 2. Mitigation may also be made by payment into the North Cazolina. Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they aze will to accept payment for the mitigation must be attached to this form. For additional information regazding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (squaze feet): N/A Amount of Riparian wetland mitigation requested (acres): NIA Amount ofNon-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Updated 11!12005 n..~.. ~n..r~o IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of public (federaUstate) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), i SA NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify)? Meuse Yes ® No ^ 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* (s oars feet) Multiplier Mitiu t on 1 7,925.0 3 (2 for Catawba) 23,775.0 2 6,445.0 1.5 9,667.5 Total 14,370.0 33,442.5 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additiona120 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. No mitigation is nronosed by the applicant. The impacts resultine from the road crossing are <1501inear feet (0.329 ac) and should be considered Allowable. The remainder of the Zone Updated 11/1/2005 n...... ~ i ~r» 2 buffer impacts (0.17 acl results from rg adin~ associated with proposed parking area and should be considered Exempt. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The proposed storm water management plans will consist of a constructed wetland located at the southwest corner of the site. The wetland will be designed and sized to treat the 1" design storm and hold it in the basin for 2-5 days. By storin t~water for 2-5 days, we will reduce the TSS levels and nitrogen levels created by the additional impervious areas. The discharge from basin will pass through a level spreader or scour hole before entering the existing channel buffer. The pond will also detain the additional run-off from the 10-year storm and release it at the pre-development rate. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. City of Raleigh sewer will provide service to the site. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this anafter-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: No additional future impacts are anticipated due to this ~roiect. BMPs will be enforced to control erosion and/or sedimentation during the construction of the project to avoid impacts to downstream water quality. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Updated 11/1/2005 Page 12 of 13 ESI and the applicant are not aware of any other issues regLarding_tbis site that could affect the issuance of the Qermit c Applicant/Agent'~Signat~ ~ ~ Date ~ (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated 11/1/2005 n.,.... ~ ~ .,c ~ ~ ~ Q ~ U °z W U ~ H ox~ O W ~z~ ox ~ O ~i''E ~' .s... .4 :$~ m~'ij .V L - ` hF t'~ o'!i !K ti % ~ ' _+ 4~ ; n~ 1 ~. ,a,.;~ .` ~ ~~ bl i ., y~ <~ ~~ ~: e R!'lt . t ~ ,,,f ~ ~~~ :l . i ti' ~.'~! t„ ti3 ~,~flYn/ .. _ ~JY F t .,e ~ ,vs' ~F F~ ~ ..7t k .F 14 ~- ~ ,.pit ;,'%~i~ y,~ ~ - ~ r ~, w - t~5~ ~; ~.~' '~ 1. ~ti." 4 v r ,f .rv ~ a~ Y e L ~~~','"~ : nF~,le BROOKWOOD CAPITAL SOUTH NEW HOPE ROAD WAKE COUNTY, NC .:~~~~ APPROXIMATE STREAM CROSSING LOCATION -LOOKING NORTH 1/ 4, -Z—Tt I 04W -1 i� < At 401 XtlfIRR7, RD Le EXIT L.akar ou Aw- *1 f1' / - L SP I 4G FOREST no CIROW-ft -5i N,10", "Pip tiME, 1 at Hope It a 440 awad BIT 7 d01 -E 'r -e 00 ME 000*6SP AV am EXIT L n7O E, N.C. useum of Art T T',IN ; 01 C Wdd— IA 10 ,?T r 64 e "I �� P.,k Md mif IT L H -p ALEIGH 440 Norrh Carolina Peale C" It C1.294 C" 44U N.C.Museum o H H. 64 N.C.C M Uff Museum NEW Natural Science NERN AV N,(-. Stale Capitol, N", I At, ' Shaw U—Tlty C.. fiTATE C CTIC)NAt, leiqL CENTER A TWMAj `4 EXIT 64 EXIT k .1. t, IT EXIT 30 F 3111 I..d 2S5 d 40 It A e Tm" Cloverdale PEA CA, It MMI Greenbrier m r Estates % I LL / qL Garne11 CR1 � Echo II Forest. Hill, F, edq PP i.; we PAub.,vt MLAwOA LM r I r-11 r z + a& 7," A, ~ ~ `~. i---~- alp It,` ;; ,~ ~ 1, `~ ~~ i ~ '' I °~ ,'"h/ i~t /Wi't`' t ~\'J"~ ~ !!~\1tY. -~ II \_ ~., 11 1 ~ ~~. ~~_ .~~ ; ~`~ ~- Park`:-%%i~ ~~~ -t `. ~ . /~ ~l ~~ \ Q Project Boundary* *Location and extent is approximate. 0 loo0 2000 -~ Feet Source: USGS Digital Raster Graphics, Raleigh East NC Quadrangle, 1999; Projeci boundary estimated by ESI. Disclaimer: The information depicted on this figure is for informational purposes only and was nol prepared for, and is not suitable for legal or engineering purposes. ENVIl20NMENTAL SERVICES, INC. 524 S. New Hope Road Raleigh, North Carolina 27610 (919) 212-1760 (sis> ziz-nm Fnx w,vw. environmentalservicesinc.cnm ~, Project Location New Hope Road Site Wake County, North Carolina `. ~` I -. 1 ._ ~ .. - "~"~ ~ t ~~-~ 223, _ i `.i ~~ ,~ ~~~ .; Project: ER07210.00 Date: JAN 2008 Drwn/Chkd: RLT/TM Figure: 1 r / J~ I ~ 148 L EAR FT Q, / 730 QUARE FT / P R __ -~p I I a VELOCI C I ~ ~ ~ ~ DIS P TER 7,925 SQU EFT °~QD 8a S ~ .~ ~ 0.18 Ac `. ~~ ` ` l 8' F `~ ~` / ~ q~. ~~ ~`. `, `. ~ 13,950 SQUARE F / ,. ,. / 4j ~ ~ ~ ~ ~ ~ (0.32 c) / ~ q `~~ / / .. /) / / / ~ ~ ~ `~ ~~ ~\~ ~ ~ ~ ~ ~ / \ ` \ \\ \` I/ ~ ` `~ ~0 `.`~ , , Aso, Ao I I I ~r + A SFO ~` '~ GB tit ~ .~ ?,? . 4C ~/{•~. / ~\ / p „b, ~' ??o ~~~ ,~ ~ 2~ \ / \ ~~ `'~ y ( NOTES ~~ I I '" EXIST. CONTOURS BASED ON CITY OF I ~ ~I ' ~ RALEIGH AERIAL TOPOGRAPHY. ~ ~~ I WETLAND LOCA110NS BASED ON FIELD ~~\ ~ ~ PROP. SURVEY BY ANC ENGINEERING, INC. \ 8" D.I. ~ ~ I ~j SERVICE ~ _ _ PROP. -1 I I - =1 I I: _ ~ I 8„ D.I. ~=1 =) ~ = 1= - SEWER ~ ~/ 1 =111=_ ~_ _ _ ~=11 1 SERVICE 1 I/ ~ 210 3 = - - = 3 ~ I I =III=III=III: =III=111- - / =III-III-III- I-III-II 1=III-III-III: =III-III-_ PROP o ~~ =III=III=III= 1=III=III- WALL ~,.-,~~ =III-III-III-III= -111-111-I ~ J =1 11=1 11=1 11= 11 11=1 11= ~~~ ~.~, ~~ ~~,,~ PROP. -1 11=1 11=1 11= 11=1 11=1 11= I "°sg~~:Y ~~~ ~'~ wALL I =1 I I=1 I I-1 I I=1 I I: =1 I I-1 I I=1 '~°sT %,~ ~~ ~~'j -~ o ~ ., I-1 I I-1 I I-1 I I- I-1 I I-1 I I- °~~ ~~ ~~ ~!/ I ~ F~F~~ ~ ,, °ti '"'T~ o~N,~ ,''~8 I I PROP. \ ~ y~s4Np T~RMyygr~~'r \ ~ I RIP-RAP -~ ~ ~-~ ~-iii-I i I~ I I. 1=1 11= - ~~'~ -II - ~ ~ 107 LF 00.50% I I EXIST. I I~ 60" RCP ~+ WETLAND J ~ co "0-RING GASKET" ~ BOTTOM °' CULVERT °~ 190 > z SECTION A-A z CLIENT: DATE: 02-12-08 ~ T ~,, BROOKWOOD CAPITOL DRAWN BY: TRS ,1 ~ ~ Engineering, Inc. ~yETLAND IMPACT EXHIBIT CHECKED BY: BAR Civil Engineers & Land Surveyors o 25 so hh} m 117 CENTRENIEST CT. FBK: EXIIIIJII a ~ CARY, NORTH CAROLINA 27813-2015 CITY OF RALEIGH r (919) 677-1998 (eus) WAKE COUNTY cHF: o (919) 877-1998 FAQ NORTH CAROLINA SCALE HOR 1"=50 FT. VER 1"= -- FT. ,~•u ~~~ri~v~~~li~v~t' 11~~~)l lihjr- ~~~`~~ ., , , ' „; I~, 111 i f ~ ,,. 1 1 ~ ` i ,~~~~ ~ 1 ~ ! ! t , r,~ ~ ,~ I' j~~ ~ j l ~ 1 ~J1 7 )f ` IiI~ I ~~; 111, i f'~)~~f l /f iii ~ /~ ~i`~f7 1 j ~l~~l~ ~ I;i j~~,l , 1ll~I I rl r 1 I~ i~, l,dlpl ;III, 11(( ~ Iffl/ i / ~ ~ J, ~f~ 1 (il`~„ i ,VIII 1 l ' s s '~ ,,,, I t ~~ z /' j ~ ~ I ~~~ v~ ~ 1, 111,1 ~~~,, p l l I 1, ,~~ ~-,~v~' I jl~~(~_~i~114 , ~ ~ ~) ~ I d I ~ ~~~ I~; II ~~ ~ ~ rI ~ ) i I~ I ~ I~I I ~ ~((j, ,~ ~~ ~ ~ ~ `V ~ } I Iii ,j i~ t ill~l' I l ~ ~ ~ ~ A ` ~ ~,, ` , Ii I ' 1 1 1 iii ~ ~~ \ , ` ~ i! I l i 4i'I 'v rv. ~~ '~';1 ~ 1 ~ ' ~ i ; , I I~;' '''' 'I ~~,~,'~, j ~ ~ , ; ,, I, ~ ~ ~ ~ ~ I ~ ~~I,, ~/'~II'~i ~~~ k ~' ~'~~i'i!~I~ ,~~I ii /'j'/1//I ~ ~ ,1 , I lil ~~ Illi I I ~'~411 II /~ ~ , '! I ~ i l s~ ~""' I I ~i~ ~!l f ( 1 ~ t ; ~~I 1`; ~ I~ , 1 ~w 1~ / ~ I ~ l~ I r ~ ( ~ ; I ~ 1 V i IiI ~ j 11 ~ 'i /, { `.' ~ 1 1 ,'~1 " i~~f i ti h %~ ~;''~ 1 i I , 'l~r'~I ~I;I~ ~ '"'ti1~d i ~ i ~ ~ ~ /~ l ~ ~ i' } 41``,I, _ , i r ~ / ~' 1 ~ -' ,'% ` ~ _ I I v _ _ -ate, ~ ~ ~,~ _ _ i . ~ , 1 / f ~ ~ / ~ BOUNDARY ~ - ~'~ -" ~-- 1 v '"~ I vI I ,~, t `.. ~ ~ ~ t . ~ - ~ , ~---~, ~ --, ~. ~.'I ~ I ~ f / / ,.- ,. 1 1 ~ ~ 4 t ~ \ - `\ I , I'' ,~~`t1~Il ~~~ i i11 1 1 1 , I ~ ~~``~ I~~I . , - , - 1 II ~` \, \ - _ ~ -, _ + i1 ~ j~l ~ ~ ! 1 I ! ~ ~ '-•~`v ~ ~~ tv ~ --- -~ ! ~ ~~ 1 ~ (I - __ ~ _ _ ~/ il~ ~ i I i 14 ~ \ ~` \.\\\\.\ \`~ ~\^' .mil -- _ ` `'\\~". ~,\ l\ ._.^~~ ".. \~, yy , ", ' ' ~ (,I 11,E `\ '~ `., ~``, ~'~. `~ ___ - ---- ~`~ \~ - ~ ~I_ ~~, \` '~~ -"./_ ~ -, " ~~ -,Jl i Z ~ ~~ "" - - ~.PRDP: I, , J ~- ' ~ i~j,}t,1inl~ ~~~~ 'v~~V~`~ ~~ I I ( f~~ / ~ _ ~~~.~ ~ ~1HEUS 1 ~~ ~ i ~'~ > .' { v ` v'` , ~~, 1 I '. ~ - „ -- 1, ; ~ ~ ~~ ~ ~ ~ 7 ~ - - --- - ~-- ~-~ ~~ ~ - .,. v , -_~ , d , ,, , ~ I t, L ~ , _ - ..,, -' __ ~ ; ' - , _ - " >''I ~ i 1,, ;'I~4h, - -- If~~ ~ v ti'tl~`, 111 ' ' I ~ 1 ~ f ~ '~ _._-- _ ~ l'_~~'hvt-~ - ,~~.';v ~~ ~. l ,~,( , ~. _ \ 1 _ fit,, ----~~ --- - ~ ~ - _ -- ,' ~ ~ v~1, + ;illllt ^. '. .-_~ 1~~~~ 'iIII~ ~ 11~~ } ~ ~ I ~ !~ ~ ~ ~7 f ~ - - ~~ ti ` - -- ~ ~ ~ ! ' ~ - ~- _- ~t ,_ , _ tt' , ,,, t, \\" ' % ' t n it , ~ ~ ~ I ~~'~'~_~~_ ~,~ .. ~~ ~~~ ~ _ _ .~ 1 ~ - (~ I i A'u'k, 'i ~7 s ~ ~ ~~ ~ , ~ _ _ - - ~~r.L i ~ - ~~ ~`, SI 1 , , p," S ' '}tilt L ~U~t ~~l`,'1 ~ ~ i ~ ~ ~i i ~ i ! i ~ - ~.`~-". , r _ -- '} , ate l \l~ ~ 1 t ~ t ~ '~ , 1 , 1 !~ _ -. ~. ''-- --_ _ - - ,i ~}',4,1`ti ~A Il~,~ ~~Q~~ ~ t 1 ~ ~ ~ I ~ ~ 1 ~ tl 111 I \\\, A '+• ~ ~ ----__~ ~~ ~\ ~ ,.~ _ - - ; „ hl~ ~~ i~~~j t 111 ~ ~~~~ ~ I ~ i ' } ~ t, ~ ~ . ~~~ ~ i ~ , ~ _ -~ _ --- ~st `,,;;,~ ~~~ fi`t`;,;\~, i1,jti, ,,~,t , ~~~, '"~, "~ ,,`\,~ -- ~ ~ ~~'~_ ~ _ _~_ ~~i , t , v ~, ~ ' ~~ ~y~~i ~V 1~~~, ~v~`\~~'°'n~~~` ~~`~', ~t.'t ~,''~ A v^ '~ _ y ~ j~ i ~' C-~~~ ~ (BOUNDARY ~- ~ ~, ~ a -- ,. , ~ ;,;t, ~ ~ -- __ -~ `.."~.. i i~ cti~ I , 1~ ~ ` 1, ~~ ~ ~ \1 1\ ` ~ ~y`it , ,l ~. ~~, \\ ~ ~ , f ~i ~ ~ / ~ ~•.~ 'f/ J - µ III t ~ 1~ , 1t ` `,~~ ~' ~ t t ~ t ) / _ ,\ ` ` t ,,/ _. _. / % ~ i}t ~1`lL,ri' t ' ~~\ \. t, \ \t1~,`~ t`~1`,\ ~ t , ~ \, ) ~ .SF~ ~ i iC ~ ~ ~ ~ ` ~~... ~ ~ "`-> > S/j ~ It ~ t ` ~ ~ A , ~ ti~11i~ ~~~~1~~~\1 ~ i t ~ ~ ~ O / ~ ~ % ~ //~ as .l .------, ~, ''~~- ~ ; ~ T` ~ / 1 \.~" ~i ~', 1t ~} t ~. A,t~t, ~At, ~'~h"`tl~t l l t i 1 4 I I ~ l ~.., l ~ I 1„ t \ M ~~~ t' i .,~~ 1. ~ i~ ~ I 1 V`S 1 1~1~~ ~j1i ' 1 ~ ~ ~i ,: _ i ~ ~ 1 f t t S, ~ ~. )` ~ X11` r1 i ,,1 ~ ~ f ~~ ~ _ ~ ~ ~ ~\ li Ali `~ J ~ } h t t~ 4 ~ ~ V~~, ~~ttit lil ~ j' 1 i I 1 1 ~ I1 j ; ~ i / / ~ - -_ , ~ i ! ~. ., , ~ 1 111,1 I, ~ ~ ,1 {~ ~ ~\\ bll , ,t`iv t}( , I , ~ t~ ~ ~~~. v ~ ~. ~ ~ t ~ i ~} ` --~i 't~ll / t'1 t itt t s ~ ~~ t~l 1~~ ~i~l ~ ~~ fl i ~ I ~ /~~ I ~' ~~ ~ c ~ i ` ~~ t \, ;Ill ~ ~ t `, ~ '- 4 `p, { } 1 't `t~ t ~ ~~1~ 1 ~ t} f" l a ~ (i ~ ~ ~1 ~ ~ ( ` % ~ C ~ l ~Ilj ~ ~ ~ ' ,}~ ~~, ~' ~ ~ L ~~~~, ~t .ui `t,~~tV~i~~f~~~l~~' ' ~ I~~ .pq~, 1 ~ i ~ ~ ~ I ''~~ ~ v ii 1 \' /' li i 11 , ` L ~ ,il,,,t .~ , I I ~ I ~ 1 t I~ ~ i ~~~~~~~ ~, S ,i ~ , l I / ~v pU~,,,~ ' 1 ~ \ i ~ ~~~ ~ ~ ~, 15 i4i c. ~' i ~ i~~ f' ~ lt~ ~ ',] ~..~ , ~~', p1~1\~tt~h`~It,l!~~~~4 v~ A` y~ '/-/~- i ~ ~~' / / / / /i~ ~ \ '~ ~ i ; `t , _ ~ _ ,~ , ,t ~ 1V ~ ~ ~~~~ 1~~~'}i ' L ~ ~ ~ ~ A~\. - of __ ~~/ ~ f f ~ ~ ` ~ , ~\~ `\ _ ~ l~~ ~' ' s ~ "~ ~ , ~ , t~l ,'~~~~ s,~~~~v~t~~~~A~,A~~~sV ~~,~`.,"`~... ~~d- . _ __~ ~ ,'~ /,' / rvd\`\ ~ tt ~ 1 ~ i , i .~ t ,, ~ ~}~ 1~ I ~ v~ t\ 1t``t` ~ ~ S v A ~ , v.".. V -_ ~ , ~- _ -,x~ ~ ~ I A ' i { i , / } ~1 ~ t t v v ~ v4 ~ t~1 ~n ~\~~~~ Vv Vv~,~ __- ~~__- _ ~~ -/ ~ ~ I I~1 ~ ~1 ~ / I ~ t, , ~1} t~ 1 V ill , 114 ~~~~ v~~v ~~ .~~`_~ .- _ ~ ~ , I, , ~~ 1 I I` / ~ I 4}' ` } ~ ~ ~ IfI~~I~, ~~1j ~`. ~V~~.w ^~.~~` ~ ~...~ -~~~~~ ~ ~~ i~~ 11 ~ l1 i~ i~ ~li ~lf~ - _. f f~ 1 ~ ~` t ~4Q S y ~ ~ ~J j~~l~' 1~7 ~~~ ~~~`~~~: ~`,.-. '_ ~ _ __ , i tt t l '~ 4~ I I i I ! ( ~ ~~..~ t ~ . 111 `r, ~--_ ~ I i i,~ ~l \ ~ ~ 1 I~ ~ ~ t ~~ , t 4 ~, - ( y p ~ Jlll ~ ~~\ ~ y ~~ . ; ~.`~ ~ _~-.~ - ~ t,90-- ~ _ ~ I i I ~ l v ~~ ~~ ~ i i ~ l ' - ~ , s'I ttI i 1 4} 1 / -~'~~ ~"~. ; ~` ill 41, i<<I` ~~_ ~ ~ I~ ~~`~ ~~~~` . ~ ~. ._ - -- - _-.. ~r-~~~ 1\ I j ~1t t ~ V A ~`~~~ AV~~ /~ ~ 1 ~--.. ~. } .~ ~; ~ %' i r 1}s`, s'S~I~ fit} ~ w~i ~ 1Q~ ~,\ ~ ~ ~_ -- -~E1- - ~' ~ { i \~v~:~~~`ti . /i _ _ t \`~ ~~'V /' ~' t, I,~~ +4,}, 'y'y,i, ~ ~-.___ / (~ i ~ } ~ ~\~ ~ ~~ ~6i-__. Ate, ~ `. A - i.,~_.,~ ~~~A , . ' ~" 1~~,,1 4}t`rl'i `iii}4 ~~•~"~, ~ ~ I;~I~I I 1( t~ ~ ~\\ ~~ 't -.~ ``.~ ''^,-`''1 ~ ~ ~ ~ - - f ~`'} y`1l'tt 11~I ,~\~ f~ - III I~ ~ III ff , \ ~ ~ ~ ~ .~` - ~t --_ , % ,, pit, ,~~ ~__ ~.._ .i~ IIiIl7 ~ I ~ ~ ~ ~( \~ ~ v 1 ~ / / ' ` ~ ~ _ ~' ~~ , / i ,, I" _-'~ ~ ( 1"t~ ~t ~~lltt ,_~~~ ~t~1~ Ip~Ii I ~ ~, ~ `-~ / ~ , _ ' ~, , {S, , --._. III \ yb / ~ - ~`- ~_~ -- r- , ~;~ ~ II ;''u ~ ~ r ,~ ~ _ - t /, ~.~~' \ '~., - 1 ~ \ t ~~ i 1 ~ttli'• s,",til ~ i I I~~~~ ~,i,III. ~ ~ ~ ~._\" ,_ / t f ~ ~ r ~ , ~ _. _ ~ ~~, ~ A A A ~~ --~' 1 S `ui' ~ ~ 1 II III , ~ r ~ I ~..,~ I ~~ ~~ ~ 1 ~ ~ ,~ \..!,,, ,+1'Sti ~ 11~ ~I/IiI I \ ~~.,~'} 1: j I~ I r ~ ~ ~ \ , I ~, ` 1 ~% `'1 f ~ t' ~ S I it 1 A ,, ,tttl .~~ i~ 1 ,~ f I ~ 1 BOUNDARY l l ` ~ ! f ~ ~~`' v - - , \ 1 ,_ ` y v, y ~~ i ,fit ~ i; ~1, ~I i - i , l ,~ /- ~" ~ ~ ,t ~ ., ', ~ ,i t ,, , , _ a -~ 'w ~ --- 1 }1 I, ~ .n h NOTES REVISED ~~~~ ~~ E ~~~'R EXIST. CONTOURS BASED ON CITY OF ~,~a4 ~' PROP. CATCH BASIN Q~\~. G, RALEIGH AERIAL TOPOGRAPHY. 'r ~~0~' ~~ ~ PROP. MANHOLE WETLAND LOCATIONS BASED ON FIELD ' PROP. END SECTION SURVEY BY ANC ENGINEERING, INC. o~ - - - PROP. STORM SEWER PROP SANITARY SEWER -- PROP WATER MAIN RESIDENTIAL SURVEYING COMMERCIAL SUBDIVISIONS ALTA SURVEYS SITE PLANNING SI D M CLIENT: DATE: D2-12-08 MULTIN fAMILY TOPOGRAPHIC SURVEYS INDUSTRIAL &NMULTIGUNIT PLOT PLANS PARCEL SPLITS LAND SURVEYING BROOKWOOD CAPITOL DRAWN BY: TRS C ONSTRUCTION LAYOUT CONSTRUCTION LAYOUT OVERALL SITE PLAN CHECKED BY: BAR ' T ~, + o loo 200 / T 117 CENTREWEST CT. ,1 ~ ~ Engineering 1jZC. CARY, NORTH CAROLINA 27513-2015 FBK: ~ ~ (919) 877-1998 (BUS) Civil En ineers & Land Surve or 919 877 1998 FAX CITY OF RALEIGH WAKE COUTNY CHF: Ex hj bjt ~ g y s ( ) - ( ) NORTH CAROLINA cnLE HOR 1"=20DFT. VER 1"= -- Ff. 07-579