Loading...
HomeMy WebLinkAbout20071317 Ver 2_Application_20080206A T '` .,.,,....._ Michael F. Easley, Govemry f OF.;N ~,rF/~ William G. Ross Jr., Secrete i ~ ~` ~-yQ North Carolina Department of Environmentand Natural Resources ' 0 .` , G ~ } ~'y Coleen H. Sullins, Director ~ ~ t ~ Division of Water Quality k 4:_ o -~ - -.,, l: ~~ n of Water uali North: Carol>Ina D><v><s><o Q ty ~. Transportation Permitting Unit `- In-Field Minor 401:Wateie Quality Certifcation, Buffer Certification and Isolated Waters Permit ~` Modification - ~'rl ~' ~~-1~. ~ ; ~6~,t~ s ~:'.1~ Date: ~ Project Name/I'1P Project No.: ~, ~ ~ DOT Division: ~f~ County:t-~JC..I.-~'~~" DWQ Project No4'.7Permtt Type: i(~~-' ~~ f~ ~~ ~ j. 9 i. DO"I' Staff: r-~'f :.~E.;t ii DWQ Staff: t~~ ~.~.~ r"1~ ~'~..~~-W' I: ~~~., U~~ ACE Staff : I~,,:3~~A DWQ Regional Office: Ir ,: Modification Description: ~?_ ~... ~~. ~' 1.,~ ~,r,.,7:r.,,.,.:,.,, Cl~ot..l,• No~` Carolina Transportation Permitting Unii " ' °furQ~~if 1650 Maii Service Center, Ralegh, North Carolina 27699-1650. 2321 Crabtree Boulevard Suife 230, Raleigh, North Carolina 27604 'Phone: 919-733-17861 FAX 919-733-6893:1 Internet. http:rfh2o.enratate.nc.us/ncwetlands ,.. ~ ._~.uu~_.:._ n...:.... C.....In.,n•- Fno% GcrvrlorlNn"/ Pnct r:nnsnmer PaaeY ,, , _ ;, .... . ,r,,, .,. .. , , .. t:- ~r~waradr~F iL In-Field Modification '...Page 2 of 3 .. , k., ~- ,.., -~ This in-field modification is required,for the .following reason(s): __ ort thereof is incorrect in the ~~ The information contained in the application or presented in supp ~ following manner: ~ ~ h the on 'nal certification was issued have changed in the following i a - - ~ Conditions under wluc ~ r nner: ~ Ll A~ ' r .5d'~~- . '~ ~~ r - ~' ,! , lid onl if issued by an authorized agent of the NC Division of Water Quality, ~', .` This in-field modification is va y ~! ~ Transportation Permitting Unit' . } .' ~~~ ~u This in-field modification authorizes the NCD to ~~ ~ ~ ~ t ~~~ y n , .~ ,, . ~ { ' ~' e r ject sh 11 be c nstructed as described in the Modification Descriptionand County T~t..~C.~ ~ ~#..~ ~~ ~ to improve/construct the section of f e 1 of this document ~~~ The-approved ~ Sketch on Pag t ~ ~ to "on Descn tion and Modification Sketch on Page 1 of this document d i~ C-,L~ that extends from ~ require a desi is that.described in the Modificatl p Certification dated y ~, . -Any further changes to the original Water Quality formal-written modification request. ro osed action provides adequate assurance that the proposed action in the The :description of the p P osed development will not result in a violation of appa able Wwill n Quality River Basm in conjunction with the prop idelines. Therefore, the State of North Carolina certifies that this onions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in Standards and discharge. gu ou are required violate the applicable p y ro ect change, y accordance with the application and conditions hereinae e~oseeforth•sold~the new owner must be given a copy of to notify the DWQ and submit a new application. If th p P m' n with all the conditions.. For this royal letter, and is thereby responsible for complyi g ou should valid ou are required to comply with all the conditions listed below. In addition, y this Certification and app ut not limited to) approval to remain , y ro ect including (b obtain all other federal, state or local permits before proceeding with your p J watershed regulations. 't'his Non-discharge and Water Supply onding Cores of Engineers Sediment and Erosion control, Coastal Stormwater, as the expiration date of the corresp Modification Approval shall expire on the same day Permit. of Modification Approval: Trans oi-tation Permitting Condition(s) l . As-built drawings of the proposed action shall beon bmitted to the NC DWQ P Unit within 30-days of the completion of the a Mies and conditions of the certification associated with the original Water Quality 2. All the authorized active except where ation dated ~ and all other corresponding modifications still apply Certific - superceded by this ce ification. 3. Additional Conditions: ~.. ~~:--. ti. .'H4 ":.' _. Failure to construct the proposed action as described in the Modification Devocation of this mod fication approv;al f - document and/or violations of any condition herein set forth may result m re -;: and may result in criminal and/or civil penalties, This modification approval shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the ~ Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, then NC DWQ must require a formal written modification to the 401 WQC, and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts for this project (now or in the future) exceed (one acre, 150 linear feet, or one-third of an acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation requirements for this project, this in-field modification is invalid and a formal written - modification is required. This in-field modification is effective upon the date the last party signs this document. This in-field modification is made upon mutual agreement between DOT and DWQ as indicated by the signatures 6e01o~w as of notificeation not subject to appeal by either party. Appeals by third parties must be made within sixty ( ) y pursuant to the conteste~21-c }se provisions of the Administrative Procedure Act, N.C. Gen. Stat. § 150B-23 et se . DWQ Staff Signature: i ' ~ ~ -~ ` ~' ;~ `- a Date: ~ ~7 ~ ~ ~~ ,--, DOT Staff Signature: ~~' ~ ~' ~`"~ ~~~ ~ ~-'°'~' Date: ~~ Staff Signature: Date: ~ - An authorized agent of the Transportation Permitting Unit is defined as DWQ staff that are DOT-funded and review and issue 401 Water Quality Certifications for DOT projects. These staff include Central Office and Regional Office personnel. Block Walls "X' on the Top of the Creek bed and books ore Armored with Existing Conc Slobs Class IIRIpRap on oufour Corners approx. 5' out to armor the heodwoll (All four corners typical) Existing 72' CMP wlt Heodwolls to be removed (60.0' Long) Proposed 84' CMP with Conc Heodwolls /- (B0.0' Long) ~ Slde Stream ~Chonnel NOTES: p Pumping System to be used to divert stream around the construction s(te os needed 2> Any contaminated water within the construction site is to be pumped into o silt bog 3) Slit fence to be placed around stockpile and project os it allows 4) Upon completion of the protect alt silt fences ore to be placed os needed. Also seeding and mulching of disturbed areas. Plan UIeW Revised i-OS to show pipe extension and remove outlet heodwoll 7/07 Lorqe Poplar Tree to be left standing! o~ 0 Shift 64' Pipe 1n the NE direct{on 2.0' from the existing 72' pipe no' uo' ~ C L D.• ~' a' 105' of o I ~ ~ r c ~ o,~' , 105' ~ ~~ ~ 100' - 95 95' -- -- 90' 75.9' 63.4' 51.1' 41.9' 34.5' 0' ' 35.5' 46.3' 0' 45'+- 51.7' S8' 63.6' 90' 38.2 \c oQ. Q< Existing Plpe Gradient 94.2 6 -93. 0.6/61= I.0 Proposed Pipe Gradient 94.1 - 9 3.0 I,I/80 1.3% Streambed Profile CL 13 9.9' 9.0' .5' 0'+- 110' i 105' I 100' I 95' ~ 90' Cross Section taken Perpendicular to the Road Revised I-OB to show pipe extention and remove outlet headwoll ./`~ `~~ .~~ J 7/07