HomeMy WebLinkAboutNC0024406_90 Day Notification of Closure_20160616 eli DUKE Belews Creek Steam Station
ENERGY®
Duke Energy Carolinas
3195 Pine Hall Road
Belews Creek,NC 27009
June 15,2016
Mr.Jeffrey Poupart
NC Division of Water Resources
1617 Mail Service Center
Raleigh,NC 27699-1628 RECEIVEDINCDEQJDVVR
Subject: 90 Day Notification of Closure for Wastewater Treatment Unit
JUN 16 2016
Duke Energy Carolinas,LLC(DEC) Water Quality
Belews Creek Steam Station Permitting Section
NPDES Wastewater Permit NC0024406
Stokes County
Dear Mr.Poupart:
In accordance with the requirements of Part III,Section D of NPDES wastewater permit NC0024406, Duke Energy
Carolinas, LLC (DEC) is hereby providing notice of closure for wastewater treatment components at our Belews
Creek Steam Station. As part of a Water Re-Route Project being undertaken to assure compliance with the Federal
Coal Ash Residual (CCR) rule for this facility, DEC will be closing the Constructed Wetlands. Wastewater
currently directed to the wetlands will be redirected to the ash basin and then to a new retention basin being
constructed in the footprint of the current wastewater treatment system wetlands. More details about that basin will
be provided in the upcoming submittal for NPDES renewal later this year. This work does not change the final
outfall discharge point of any flows at Belews Creek.
Details of the current status of the treatment units and the current plan for closure are:
• Constructed Wetlands. Constructed Wetlands receive flow from consolidated sump which includes
collection of wastewater from the sanitary waste system, stormwater collection pond (stormwater runoff
from gypsum and limestone stockpiles), limestone unloading facility sump, and leachate and contact
stormwater from FGD residual and Craig Road Landfills prior to discharge to Ash Basin, The plan for
closing the constructed wetlands is remove any residuals and dispose of off-site by a licensed contract
disposal firm, than the treatment unit will be replaced with retention basins which will discharge to Dan
River through permitted NPDES Outfall 003.
Please accept this letter as meeting the permit requirement to provide 90-days notice of closure for a wastewater
treatment system. If you have any questions regarding the closure of these treatment units, please contact Joyce
Dishmon at(336)394-5524,or via email at Joyce.Dishmon@Duke-Energy.com.
I certify ander penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system
or those persons directly responsible for gathering the information, the information submitted is, to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of fines and imprisonment for knowing violations.
90-Day Notification for Closure for Wastewater Treatment Unit
Duke Energy Carolinas
Belews Creek Steam Station
NPDES Permit NC0024406
Sia 4401111rr
Reginald D. Anderson
General Manager Ill,Regulated Stations
Belews Creek Steam Station
Power Generating Carolinas East
Cc: Sherri Knight,Supervisor DWR Winston-Salem Region
Keeley McCormick,Env Specialist,Belews Creek
Joyce Dishmon,CCP Permitting and Compliance