Loading...
HomeMy WebLinkAbout20051151 Ver 2_Certification of Completion_20080219CG,T iF- ?ht*A s U--Q d % In `og ertifl ation of om letioHLA E[R@[Effig D FEB 1 9 2008 DENR - VVA ER QUALITY ?1 ^ U WETLANDS AND STORMWATER BRANCH DwQ Project No.: ?J " 11 51 Pr Z County: Applicant: Project Name Date of Issuance of Certification or Authorization: JdA M Ux? :2,a OZ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail. Service Center, Raleigh, NC, 27699-1.650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, used in the observation o the compliance and intent of the 401 and other supporting materials. Sismature. Agent's Certification Date: 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and othcr supporting materials. Signature. , hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, bate; If this project was designers by a Certified Professional 1, JiWam as a duly registered Professional 22f (i.e., Engineer„ Landscape Architect, Survey , etc.) in the State of North Carolina, Laving been authorizeITt (periodically, weekly, full time) the construction of the project for the 'Pennittee her'--by state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and rafter supporting materials. Signature: .?? Registration No. NC-Z?2 5 ? Date