Loading...
HomeMy WebLinkAbout20050150 Ver 3_More Info Received_20080220CL 'T F: ®® Kimley-Horn and Associates, Inc. February 18, 2008 Mr. Monte Matthews U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Ms. Cyndi Karoly NC Division of Water Quality 2321 Crabtree Blvd. Raleigh, North Carolina 27602 05-V150 V3 oC M115 P.O. Box 33066 F 2 0 2008 Raleigh, North Carolina 27636.3066 OENY? MYER QUAU." BRMCH WETI_AN6S AND STORMWA Re: Green Oaks Parkway, Town of Holly Springs Wake County, North Carolina DWQ Proj. #2005-0150 Ver 3; USACE Action ID: SAW-2006-20193- 292; TOHS Proj. No.: 05-017 Dear Mr. Matthews and Ms. Karoly: On behalf of The Town of Holly Springs, Kimley-Horn and Associates, Inc. is submitting the enclosed Construction Sequence (amended), prepared by Soil and Environmental Consultants, PA, pertaining to the above mentioned permits for your file. The Construction Sequence has been prepared to implement compliance measures on the Green Oaks Parkway Project, and the Town anticipates that construction will commence once the limits of disturbance have been approved per the Erosion and Sedimentation Control Plan. If you have any questions, or need additional information, please do not hesitate to contact me at (919) 677-2121. Very truly yours, KPdLEY-HORN AND ASSOCIATES, INC. ? Chad Evenhouse Environmental Scientist Enclosure Cc: Stephanie Sudano, Town of Holly Springs Sean Clark, Soil &Environmental Consultants, PA Chuck Nuckols, Kimley-Horn and Associates, Inc. ¦ TEL 919 677 2000 FAX 919 677 2050 Green Oaks Parkway - Construction Sequence Alternates REVISED - February 12, 2008 The following Construction Sequence Alternates are intended to provide general sequencing guidance for the remaining headwall construction and proposed stream, wetland and buffer restoration (repair and stabilization) measures for a series of six culvert crossings along the Green Oaks Parkway in Holly Springs, NC. One of two general conditions currently exists at each end (upstream and downstream) of each of the crossing locations; A) Headwall Already Constructed & Restoration Remaining, or Applies to: Crossing #3 Upstream and Downstream Crossing #5 Upstream Only Crossing #6 Upstream Only Crossing #7 Downstream Only B) Both Headwall Construction & Restoration Remaining Applies to: Crossing #1 Upstream and Downstream Crossing #2 Upstream and Downstream Crossing #5 Downstream Only Crossing #6 Downstream Only Crossing #7 Upstream Only The following general Construction Sequences shall apply at all locations: Confirm required Limits of Disturbance (LOD) with representatives of the Town of Holly Springs (TOHS), Wakefield Development, Fowler Contracting, and Soil & Environmental Consultants, PA (S&EC) (performed on January 28, 2008). 2. Surveyors to re-stake remaining headwall foundations as needed (and directed by Wakefield). Fowler and Wakefield to confirm headwall staking and coordinate any modifications in LOD's with S&EC prior to installation of tree protection fencing. S&EC to notify TOHS of LOD changes. Fowler to install tree protection fence along newly defined LOD's. Fowler to relocate (or install new) silt fencing, riprap & gravel checkdams, and other necessary sediment control devices as deemed necessary. 4. S&EC to inspect installed tree protection fence and sediment control devices for conforrnance with LOD's and with design intent, and provide additional recommendations to Fowler as needed. Pagel of 3 5. S&EC to provide written confirmation to TOHS that LOD's are in general accordance with those limits described in the Repair & Stabilization Plan approved by USACE and DWQ. Depending on local conditions Sequence A or Sequence B will be followed. A) If Headwall Already Constructed & Restoration Remaining then: 6A. Fowler to backfill around footings (pump out standing water as needed). 7A. Fowler to perform local stream, wetland and buffer restoration. S&EC to provide on- site construction observation as required throughout the duration of construction. S&EC to provide necessary guidance/modifications to repairs based on site conditions encountered during construction. Fowler to stabilize restoration areas (seeding, mulching, matting, and planting). S&EC to approve local work upon completion. 8A. Fowler to reinstall local temporary sediment control devices upon completion of local construction activities. S&EC to notify TOHS and Wakefield of the completion of local construction activities. Fowler moves to next restoration location. B) If Both Headwall Construction & Restoration Remaining then: 6B. Fowler to spray paint footer locations and stake out permanent impacts. Fowler (or their surveyor) to certify that footing and headwall are located as shown on plans. 7B. Fowler to excavate for headwall footings, construct formwork and pour concrete footings. Remove formwork and backfill footings. 8B. Fowler to perform local stream, wetland and buffer restoration. S&EC to provide on- site construction observation as required throughout the duration of construction. S&EC to provide necessary guidance/modifications to repairs based on site conditions encountered during construction. Fowler to stabilize restoration areas (seeding, mulching, matting, and planting). S&EC to approve local work upon completion. 9B. Fowler to construct headwall formwork and pour concrete headwall. Fowler to backfill headwall and stabilize surrounding slopes. Fowler (or their surveyor) to certify that footing and headwall were constructed as shown on the plans. IOB. Fowler to reinstall local temporary sediment control devices upon completion of local construction activities. S&EC to notify TOHS and Wakefield of the completion of local construction activities. Fowler moves to next restoration location. NOTES: 1. Construction shall be performed in an upstream to downstream direction at each crossing location unless otherwise approved by S&EC based on site conditions. Page 2 of 3 2. S&EC shall provide weekly updates to TOHS and Wakefield outlining the progress of construction. 3. Planting operations including the installation of livestakes, trees and shrubs may be delayed until all restoration activities have been completed and weather conditions are suitable for plant installation. Such delays are in concert with planting efforts described in the approved Stabilization and Repair Plan. 4. S&EC to prepare Certificate of Completion for restoration efforts for submittal to USACE and DWQ upon completion of work. Page 3 of 3