HomeMy WebLinkAbout20140727 Ver 2_EEP Receipt_20160623Burdette, Jennifer a
From: Burdette, Jennifer a
Sent: Thursday, June 23, 2016 3:32 PM
To: 'Bob Zarzecki'; Gibby, Jean B SAW; Shaeffer, David L SAW; Alexander, Tasha L SAW
Cc: Jack H (Morrisville) USA Garvey; MaryAnn.Bradshaw@LehighHanson.com; Lee, Toby
(Morrisville) USA (Toby.Lee@hanson.biz); Burnette, Alan C (Atlanta) USA
(Ala n.Burnette@heidel bergcement.com); Haupt, Mac
Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727
_Cert. No.4048)_Start of Construction Notification
E•
Thank you for the notification. Mac Haupt and I do not plan to attend the pre -construction meeting on July 5th,
but will try to make time for a visit sometime during construction of the diversion channel. We will be sure to
coordinate with everyone to plan a date.
Thanks,
Jennifer
Jennifer Burdette
401/Buffer Coordinator
Division of Water Resources - 401 & Buffer Permitting Branch Department of Environmental Quality
919 807 6364 office
jennifer.burdette@ncdenr.gov
1617 Mail Service Center
Raleigh, NC 27699-1617
(Physical Address: 512 N. Salisbury St, Raleigh, NC 27604 - 9th Flr Archdale Bldg - Room 942F)
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties.
-----Original Message -----
From: Bob Zarzecki [mailto:bzarzecki@sandec.com]
Sent: Tuesday, June 21, 2016 10:28 AM
To: Gibby, Jean B SAW <Jean.B.Gibby@usace.army.mil>; Shaeffer, David L SAW
<David.L.Shaeffer@usace.army.mil>; Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov>; Alexander, Tasha L
SAW <Tasha.L.Alexander@usace.army.mil>
Cc: Jack H (Morrisville) USA Garvey <Jack.Garvey@hanson.biz>; MaryAnn.Bradshaw@ LehighHanson.com; Lee,
Toby (Morrisville) USA (Toby. Lee@hanson.biz) <Toby.Lee@hanson.biz>; Burnette, Alan C (Atlanta) USA
(Alan.Burnette@ heidelbergcement.com) <Alan.Burnette@ heidelbergcement.com>
Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert.
No.4048)_Start of Construction Notification
Jean & Tasha:
I can't make a site meeting on the 5th, as I'm on vacation that entire week. But, you should be fine meeting with
the Hanson folks without me. They're just making sure that they'll have the necessary people there. We'll be in
touch soon to confirm this date.
Thanks!
Bob Zarzecki
Wetlands Department Manager
Soil & Environmental Consultants, PA
-----Original Message -----
From: Gibby, Jean B SAW [mailto:Jean.B.Gibby@usace.army.mil]
Sent: Monday, June 20, 2016 5:05 PM
To: Bob Zarzecki; Shaeffer, David L SAW, 'Jennifer. Burdette@ncdenr.gov', Alexander, Tasha L SAW
Cc: Jack H (Morrisville) USA Garvey, MaryAnn.Bradshaw@ LehighHanson.com, Lee, Toby (Morrisville) USA
(Toby. Lee@hanson.biz), Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com)
Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert.
No.4048)_Start of Construction Notification
:••
Since they plan to start construction on the 5th, would it be acceptable if we met with them around 830 to have
the pre -construction conference on the 5th and that would allow Tasha to see the site, along with me and get
the scoop, hoping to kill two birds with one stone (yep, there was a pun intended in there).
Jean
Jean B. Gibby
Chief, Raleigh Field Office
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 24
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure
we continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
-----Original Message -----
From: Bob Zarzecki [mailto:bzarzecki@sandec.com]
Sent: Friday, June 17, 2016 2:24 PM
To: Gibby, Jean B SAW <Jean.B.Gibby@usace.army.mil>, Shaeffer, David L SAW
<David.L.Shaeffer@usace.army.mil>, 'Jennifer. Burdette@ncdenr.gov' <Jennifer.Burdette@ncdenr.gov>
Cc: Jack H (Morrisville) USA Garvey <Jack.Garvey@hanson.biz>, MaryAnn.Bradshaw@ LehighHanson.com, Lee,
Toby (Morrisville) USA (Toby. Lee@hanson.biz) <Toby.Lee@hanson.biz>, Burnette, Alan C (Atlanta) USA
(Alan.Burnette@ heidelbergcement.com) <Alan.Burnette@ heidelbergcement.com>
Subject: [EXTERNAL] Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert.
No.4048)_Start of Construction Notification
Importance: High
Jean, David & Jennifer:
As required under special condition "f)" of permit SAW -2014-001246, work is scheduled to commence on July 5,
2016 at the Hanson Crabtree Quarry Expansion project. Please confirm receipt of this notification and contact
us if you desire a pre -construction meeting.
Sincerely,
Bob Zarzecki
Wetlands Department Manager
Soil & Environmental Consultants, PA
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
(919) 846-5900 Office Phone
(919) 256-4517 Direct Line
(919) 846-9467 Fax
(919) 270-2068 Mobile
bzarzecki@sandec.com <mailto:bzarzecki@sandec.com>
Visit us at SanclEC.com <Blockedhttp://www.SandEC.com> !
This electronic communication, including all attachments, is intended only for the named addressee (s) and may
contain confidential information. This electronic communication may not have passed through our standard
review/quality control process. Design data and recommendations included herein are provided as a matter of
convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the
consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination,
distribution or copying of this communication is prohibited. If you have received this electronic communication
in error, please notify the sender by return e-mail and delete the original communication from your system.
Thank you.
From: Garvey, Jack H (Morrisville) USA [mailto:Jack.Garvey@hanson.biz]
Sent: Friday, June 17, 2016 2:09 PM
To: Bob Zarzecki
Subject: FW: correction
All of the credits have been purchased for Phase 1 of the Crabtree Expansion, and the supporting documents
are attached. The contractors are scheduled to start the project on July 5, 2016. This email correspondence is
intended to serve as Start of Construction Notification for Action ID: SAW -2014-01246.
Jack Garvey
Environmental Manager
Hanson Aggregates Southeast, LLC
2101 Gateway Centre Blvd, Suite 100
Morrisville, NC 27560
Tel: 919 380 2746
Cell: 336 669 7565
Jack.Garvey@hanson.com <mailto:Jack.Garvey@hanson.com>
Blockedwww.hanson.com <Blockedhttp:Hwww.hanson.com>
4
W
0
W
J
F-
0 0
W
U
a
F-
0)
Y
W
W
L)
U
F-
0) LU
LU0
LL
'O
0
of oo
0
O)
O) O)
O) O)
O
O
N
N N
N
CO CO
O10
of
N
N
N
N
0
M CO
N N
N
N
O)
O Oo
N
InN
N CO
N N
C5io
7-N
6)
Cl)
V
N
O
7
N CO
O
0
ON
0
O
N
O
N
�
N
0
N
CO
N
N
co
O
N
\
N
_
O
N
�_ CO
_
O O
N N
to
O to
N
V
N
O
V
O
>N
Q
U
c
O
_
=
a)
L
y N
c
N
fl-
c
L
C)
m
L
O
to
i
>�
N
w
Q
0
C
c
2
`m
r�
H
N O
a)
N
Oi
= E
o
Q m
a
O
i
-
.�
O
m
a o
a)
w
v a
a,
Z
N O
U
i
O
a
Q a
N
z
Y
C) �
U
j/1
(n c
O,
U
N
C
N i
O
T
a
0L
L
T
L
L
L
C
C)
N
Z a
X
a C
N
UO
N
N
_�
N
_�
N V
0
N
(�
O
C)
C
a) a�
N
LL
LL
Q
L
U) N
N
C)
a
N
N
0
to
c
.
O
O
OC
O
DdO>
O N
'O
O/esOOOO
to U)
N
SW
to
0
O
O
L
N T
X
T x
N
CD
N
CD CD
N
�
D
� U)ff
O 'T'
C
N 'T'
(1) C
_T
O
� C)
_
N
CD 00
_
O'
<
N
N
W
w
N
N
N
N
N
N
El
0
C)
C
C)
=
C J
J
L
U
O
5
Q
C
Q
N
C C
Q
i
X O
N N
L L
f/1 O_)
L
O_)
i L
O O_)
L
a_1
L X
a_1 N
E�
N>
L
W
a s
0
>
T
a C
Q N
N N
07 N
N
N
2- N
Q N
N
N
N O-
N Q�
U
L N
p
W
L C
U)
a
Q
U
o a
x
T
o
a
p
z
a
C
Li
O
c -o
O C
LL O
Y
O
Y
C O
Y
D
T
o c
y O
U)
p
T
c
CYj
o
j
v
c�
rn C)
C)C)0
O
00OCJ
O
N
W
p
a�
H
N
O
c
O
LL
U)
>
ff
u
Q
E
_
L
O
U
U
CL_
�
j
i
O
O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
of of
O O
of of
O O
of of
O O
of of
O O
of of
O
of O
O
o O
O
CO
Lo
ofO
O
N of
CO
CO of
of of
O to
O co
O I�
N to
'3-�
N
CO O)
N co
0 to
V N
I� O)
O) O
O) V
V O)
� 0
N O
0 0
O O
O
O
CO
V O
OJ
N OJ
to M
O V
m
N O)
co
of
3- co
N
O
O O
O O
O
O
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O O
O O
O
0
O O
0 0
O O
0co
co
p
of of
of
coCO m
co m
M O
0 N
0
CO
0
O I�
O
N
O)
CO m
M O
of �
O N
0
O
I�
O
-n
00
N to
00
-
0
I�
V V
V
O
0
co
O
O
m
O
O
of
COO
O
r
O
O
O
O
O
O
O
O
m
r
(O
r
O
O
O
Cfl
N M
V to
(O I�
of O)
O
N M
V to
CO I�
of O)
O
N CO
V M
CO I�
N
H
U!
'O
()
N
co
V V
to
to to
CO
in
M V
N
In CO
O
j)
o
m
N %n
O of
N O
M
N V
V
in �
M
CO
m
o
M
M
Lo
O
�
O
N
�
O
N
0 O
N
O
N
N
O
(o
O
O
O co
O CO
n
'T
N
O O
V M
O O
>N >N
O
V
O
>N
Q Q
Q
Cn Cn
Cn
(Y
O
U
_
—
�
o
N
C
o
O
N
�
a
LO
o
°
o
o
�
0
E
.> >
W
U
Q
L
(yJ
Z
O
N
N
J
>
n i
N
U
U)N
U
i
U.S. AiRMY CORPS OF ENGINEERS
Wilmington District
�;�ppp�SaLq oltigo giI
... MA4 �, � ., Re�,ponsibil For]
Permittee: Jaclr Garvey, Harison Aggregates Southeast, iAC Action its; SAW2014-01246
Project Name: Crabtrer., Quarry, Hanson Aggregates Southpast, LLC (Phase I rn4igation) County; Wake
Instructions to Permittee: T'he Permittee must provide a copy of thris form to the Mitigation Sponsor, either an approved
Mitigation Bank, or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify tne
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permitlee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page, two is in receipt of a signed copy of this
form before conducting authorized impacts. unless otherwise specified below. if more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts arid/of the mitigation will occur in more than one
8Aigit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC rnust be provided to the appropriate indigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requircrnenls (credits) shown below are available at the
identified site By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or riot they have received payment fro.ni the Permittee. Once the form is signed, the Sponsor.must update the bank
ledger and provide d COPY Of the signed form and the updated batik ledger to the Permittee, the USACE Project Manager', and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor most also comply with all
reporting requirements established in their authorizing instrurnentr
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Imoacts Reouirine Mitization* 8-dipit HLIC and Basin: 03020201., Neuse R�ver Basin
Strearn Impacts (linear feet) Wetland impacts (acres)
Warm Cool Cold
Ripaiian Riverine i Riparian Non-Riverine Non -Riparian Coastal
I
976
'if more than one mitigation sponsor will be used for the permit, only include impacts to be rniligailed by this sponsor
Compensatory Mitigation Requiirement8-digit HUC and Basin: 03020201, Neuse River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine Riparian NonrRiverine Non-Ripafian 1 Coastal
1,81 15
Mitigation Site Debited: salRES bank sites would be used to salisfy tie, mith at or,reqvrjrem.erit, The folhMi credits
would COrne the fclllowrErgj 0 SMUs from Farrest ,Cree,k 5 SMUs from U3-2 668�8 SMUs from Ce € air Grove,,
and 60.4 SM.Us from Buffalo Branch, This rnibRation transfer farm satisfiespalt of the credits re uirect,for.i psis S4
fS L19f 0861-1
Statement of Mitigation Liability Acceptance: f. the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitiration Sponsor shown below, arid I certify that the Sponsor agrees to accept fulf responsibility for
providing the initif.,talron identified in this document (see, the table above), associated with, the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDrVIS), as approved by the USACE, are
currently avaiiable at the mitigation site identified above, Further, I understand that if the Sponsor fails to provide the
required compensatory ritiligation, the USACE Wilmington Distfro Engineer may pursue measures against the Sponsor to
ensure compliance associated with the r-nitigation irequirenri.,ills.
,6 V
A-
. x� N J
Mitigation Sponsor Name:, V-3 -cm, I'L
Name of S96 nsor's Authorized Representative: . . . . .......
Date of Signature
PaBe I W 2 Form Updated 23 November, 2015
US;ACE Wilmington Dist�rict
Compensatory Mitigation Responsibility Transfer Form, Pagel
Conditions for Transfer of Compensatory Mitigation Cred&
a Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed forrn, the
Perrnalee is no longer responsible for providing the miligatiort identified in this form, though the Pert-nittee rernains
responsible for any other mitigation requirer-news, stated in the permit conditions.
I* Construction within jurisdictional areas authorized by the permit identified on page one of this form can Bergin only after
the USACE is in receipt of a copy of this clocurnent signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOI), construction within jurisdictional areas may proceed upon permit
issuance: however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance, NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for provicirng the mitigation requirements listed herein,
a Signed copies of this docurnent must be retained by the Perinittee, tAttigation Sponsor, arid it) the USACE administrative
records for both the permit arid the Bank/lL F instrument. it is the Perrnittee's responsibility to ensure that the, USACE
Project Manager (address below) is provided with a signed copy of this form.
P If changes are proposed to the type, aMOUril, of location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case ,key -case approval from the USACE Project Manager and/or North Cirohna
Interagency Review Team (NORT), if approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/IIF Instrument.
Comments/Additional Conditions: Coqip !bc-0agk.!bq
gpsator r i 1 will be,p vi4 r the above refer rice
y . .... tiq% fo
credits as listed above from RES, A letter fron't RES dated ApLfL2_8 6 con rML that RES is
yLillin arid abletcrai cEjpt the qgt5,SRT r a5,alo_ry nritr&dt on r c n iblli was includedw i h t til phcation.
-.-,.,e a p.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page I Once
signed, the Saonsor should provide copies of this form along with on updated bank ledger to; 1) the Permittee, 2) the USA CE
Project Manager of the address below, and 31 the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC 27587 (emoll: todd,tugwell @usoce.orr"y,mi1). Questions regarding this form or any of the
perr-nit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: David Shaeffer
USACE Field Office: Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Roorn 208
Asheville, North Carchnis 28801-5006
e
E Pro ec arraer Sigriatu
Date of Signature
Current Wilmington District r-nitigatwirt guidance, Including Information or) Mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classif ical ions (including stream temperature and wetland groupings) is
available at h1t1,tF)://-f ibit,s-usac"er.'alli,yItIjI
Page', of 2
Thi, W,HimptyDrOwr is comen, It (Id to provot I r1r,1, r I, e his tit -,t lvvit,i of sutaporl to the pubiic 10 1 ielp u enwfe w conlini,)e to da %si, wmpfele the
LuAorre5ztt10dCI1Ckn S , un�(Iy ionated fit ou, website -ane to con,�,Avt
C the SOvey onkne
ME
MITIGATION CREDIT TRANSFER CERTIFICATE
NEU-CON WETLAND AND STREAM UMBRELLA BANK
TO: NORTH CAROLINA INTERAGENCY REVIEW TEAM
The undersigned, EBX-Neuse I, LLC, the Sponsor of the Neu -Con Wetland and Stream Umbrella
Mitigation Bank (Cedar Grove Site), hereby certifies the following:
Hanson Aggregates Southeast, LLC has deposited monies with the Sponsor
sufficient to acquire 668.80 Stream Mitigation Credits from the Bank for use on its
Crabtree Quarry Phase I project (USACE Action ID SAW -2014-01246), in
Raleigh, NC, in HUC 03020201 of the Neuse River Watershed.
2. The Crabtree Quarry Phase I project requires a total of 3,225 Stream Mitigation
Credits as mitigation, and RES is providing 1,815 Stream Mitigation Units in total
for Phase L Of this amount 668.80 Stream Mitigation Credits are being provided
by the Cedar Grove Site in the Neu -Con Umbrella Bank.
The Sponsor has deducted 668.80 Stream Mitigation Credits from the Cedar Grove
Bank's credit ledger in HUC 03020201 of the Neuse River Watershed.
A copy of the Bank's Credit ledger reflecting the above transaction is attached to this Certificate.
EBX-Neuse I, LLC
in
Cara S. Conder, Authorized Agent
Date: 06/03/16
Copies:
Scott Dickson, Hanson Aggregates Southeast, LLC (electronic)
Bob Zarzecki, S&EC (electronic)
ME
MITIGATION CREDIT TRANSFER CERTIFICATE
FORREST CREEK STREAM BANK
TO: NORTH CAROLINA INTERAGENCY REVIEW TEAM
The undersigned, EBX-EM, LLC, the Sponsor of the Forrest Creek Stream Mitigation Bank
(Forrest Creek UT -2 Site), hereby certifies the following:
Hanson Aggregates Southeast, LLC has deposited monies with the Sponsor
sufficient to acquire 25.00 Stream Mitigation Credits from the Bank for use on its
Crabtree Quarry Phase I project (USACE Action ID SAW -2014-01246), in
Raleigh, NC, in HUC 03020201 of the Neuse River Watershed.
2. The Crabtree Quarry Phase I project requires a total of 3,225 Stream Mitigation
Credits as mitigation, and RES is providing 1,815 Stream Mitigation Units in total
for Phase L Of this amount 25 Stream Mitigation Credits are being provided by the
Forrest Creek Bank (UT -2 Site).
The Sponsor has deducted 25.00 Stream Mitigation Credits from the Forrest Creek
UT -2 Bank's credit ledger in HUC 03020201 of the Neuse River Watershed.
A copy of the Bank's Credit ledger reflecting the above transaction is attached to this Certificate.
EBX-Neuse I, LLC
in
Cara S. Conder, Authorized Agent
Date: 06/03/16
Copies:
Scott Dickson, Hanson Aggregates Southeast, LLC (electronic)
Bob Zarzecki, S&EC (electronic)
d
a
E
z'
a
wl
m
a'
M (O
0 N
0
0 0
�n v
O O
Q Q
:5 O
(0
S
0
0
w
c
O
w rs
000, m
U v
w
U
0 0 0 0 0 0 0 0
l.1 N N N N N N N N
= 0 0 0 0 0 0 O O
C7 C7 C7 C7 C7 C7 C7 C7
0 0 0 0 0 0 O O
d
;
d d
V
O
U
m m
m m
rn m
E
O
O O
N O
O O
O
O O
2
0 0
0 0
0 0
d
LL
Q Q
cn cn
Q Q
cn cn
Q Q
cn cn
I
dd d
W 0 N
O N d U o d
cy
0
W d 0 a
0 S U) d
NO Of d d
U) a E m
U
Y Y y? Y U o
0 o U o =
d d Q d
m m cn m
d d d
K K J K J
0 0 o
0a U)E d d
Of U Q E C9 m
o U U o Q
F U
0 0
n m
W =
U 'O
d
�.i