Loading...
HomeMy WebLinkAboutNCG080291 DMR SW (3) CL Semi-annual St£•}1rmwater ischarge Moat•rrhig for North Carolina Division of Water Quality General Permit No. N00080000 Date submitted CERTIFICATE OF COVERAGE NO 10*` ''lQ "g- SAMPLE COLLECTION YEAR rO/s FACILITY NAME SOWillC.SIe&" Frtg SAMPLE PERIOD ,Jan-June n July-Dec COUNTY Pie Ce few berg C.-64M'E'`fp� y or ❑ Monthly1 _ (month) PERSON COLLECTING SAMPLES/fin r�rf�S //ear/e v�F ° ' C !I 1 RGING TO CLASS f ORW _HQW ❑Trout PNA LABORATORY �eSTaine, ecc Lab Cert.# OCT 0 5 2015 ❑Zero-flow ❑Water Supply f SA Comments on sample collection or analysis: ['Other CENTRAL FILES DWR SECTION PLEASE�REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? I/y'es _no (if yes, report your analytical results in the table immediately below) Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) n No discharge this period' .'Outfall • Date -;.00530 , : -. ' 00400.- , ' " 00556 , , , ' No. ~Sample Collected,' • Total Suspended =" pH; ,Non-Polar Oil and Grease/TPH EPA , New Motor_Oil Usage, iiao/ddJyr",,:;, :Solids,:mg/L Standard units; Metliod1664(SGT-HEM);nig/L ':Annual'average gal/Mo ,`Benchmark - �'� : 50"br,100 see'permit,. ; _=Within,6:0—9:0 •2 - :15 - -OC/OZ/ o/.5 p2a, 4A5 /4 1 , o A/D 300.e.b i/ma Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(If applicable) Outfall, -Date, - 00556 - 00530 :: • 0049o,- „ 0400 - No,,,- Sample,Collected, ;'=NonPolar Oil and Grease/TPH EPA-Method' Total,SuspendedSolids;' _ - pH, `1664-(SGT7HEM),-:mg/L, mg/L., Standard units ''PermitLimit; '15' . ” _ - , 50-or 100'see peri nit ' ' '6:0H9.0 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11.3013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 04/005 (first event sampled) Total Event Precipitation (inches): O'/3 nC�zs Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See Genera!Permit text. FOR PARTA AND PART B MONITORING RESULTS: N/ ® A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. ® 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B o TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn. DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �"— a 7//.J/ o/S (Si: ature of Permittee) (Date) Additional copies of this:Form may,he downloa,ded at;h,ttp://portal.ncdennorg/web/wq/ws/su/npdesswItta J/portal.ncdenr.org/web/wq/ws/su/npdessw#tab 4 >.v�a„�.•--a�,'4a s L;cat ;_ • SWU 250 last revised April 11,2013 Page 2 of 2 Client Sample Results Client Southeastern Freight Lines TestAmerica Job ID:490-79648-1 Project/Site SEFL Charlotte Reagen Drive Client Sample ID: Stormwater Lab Sample ID: 490-79648-I • Date Collected: 06/02/15 10:00 Matrix: Stormwater Date Received: 06/03/15 08:40 General Chemistry Analyte Result Qualifier RL MDL Unit D Prepared Analyzed Dil Fac HEM(Oil&Grease) ND 4 27 mg/L 06/12/15 11 48 06/12/15 11 48 1 Total Suspended Solids 20.4 2 00 mg/L 06/04/15 11 20 1 pH 7.40 HF 0 100 SU 06/04/15 15 17 1 ' Temperature 21.3 HF 0 100 Degrees C 06/04/15 15 17 TestAmerica Nashville Page 6 of 15 6/16/2015