Loading...
HomeMy WebLinkAbout20160594 Ver 1_More Info Received_20160614 (2)o z 0M TOP OF FILL TOP OF FILL TOP OF FILL O I --I a \ j\\%/\ H z 797 HAYWOOD ROAD SUITE 201 C x F -q O Q rF ­q0 O -n (n GROUND LINE H GROUND LINE H GROUND LINE H H 0 CCD U Em-EZ�=y OO�xz oQ7Oc�� - - ---- - - ---- - - ---- x� = D m TIZD w=rn=ur_ur==m.rrr_nr�nr_ m.rn=ur_ur==nr_ur_nranr_ n=rn-er_nr= _m_ur_n,6,,,c Th iir iir n - LU Q Q LL = = iu n �U=OQ cn _ O O ur r n 111 nr - COMPACT AFTER = "' "' COMPACT AFTER Q O PIPE IS PLACED - - - u' - - _ '" PIPE IS PLACED LU Q J F E 0 == rrr & PRIOR TO irr rrr PLACEMENT OF - - TYPE IV ' & PRIOR TO PLACEMENT OF O • Z � ENGINEERING n FILL FILL r0 CC z DDD -I i F -E ; : :' FABRIC =nr_rrFur_ u1 ' • •° :. :: I.D. /6 MIN. h n NOT LESS N ~ E> -E d0 �Q j Z N I.D./6 MIN. I.D./6 MIN. 10-u=nr=ru---rn_r,rs ,u=m�rn� THAN 6" EARTH NOT LESS THAN 6" - - _ ' _ru_rn_ur=ru_ur_ ru=nr_rrr- O.D. + 3' NOT LESS THAN 6" /2" PER FOOT OF T1'2- BUT NOT LESS THAN T LU J O.D. + 3' NOR MORE THAN 24" 0.D. + 3' ROCK NORMAL EARTH FOUNDATION ROCK FOUNDATION AS DIRECTED BY ENGR. Z) UNSUITABLE MATERIAL FOUNDATION J PIPE IN TRENCH Uv TOP OF FILL TOP OF FILL TOP OF FILL ----7 Z 3C 11L Z ' ^ v UJ = xo ~ z J - H H LL Q LLI 0 UJ Lu I..L O J 0 LL z o = GROUND LINE GROUND LINE H AQ _ U) MIN. O.D. MIN. O.D. - MIN. O.D. MIN. O.D. MIN. O.D. MIN. O.D. TYPE IV GROUND!LIE ENGINEERING 1 a r -n, = LU Z Fi D cnr _n_nr_n u_ur-_rrr_u1- _n_ur_n n_ur-_rrr_ur_ Q d < T_COMPACT AFTER'PIPE IS PLACEDPRIOR TO I.D./6 MIN. -..: :•PLACEMENT OF CLmD= LU NOT LESS THAN 6° nr_rn=nr_rn_„r_ rd=rn=nr FILLnr_ru=n=rrr_ur_ rd=rn=urQI.D./6 MIN. AS DIRECTEDQCOMPACTAFTER Q LLO O.D. + 2' I.D./6 MIN. NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER 1112" 0 Z Q PIPE IS PLACED NOT LESS THAN 6" O.D.+ 2' Q 0. F -E M = & PRIOR TO PER FOOT OF 'H' I- _ D PLACEMENT OFBUT NOT LESS THAN 12" FILL NORMAL EARTH FOUNDATION ROCK FOUNDATION NOR MORE THAN 24" W LL � UNSUITABLE MATERIAL FOUNDATION n z PIPE ABOVE GROUND = Cn r 0 n GENERAL NOTES: J O Q I.D. =THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. C� Z = REVISIONS W 0 O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. - - - - SPRINGLINE OF PIPE W Z H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT ® SELECT BACKFILL MATERIAL CLASS III OR CLASS II, ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP BELOW SPRINGLINE. OF THE EMBANKMENT AT THAT POINT. CONSTRUCTION APPROVED SUITABLE LOCAL MATERIAL ABOVE SPRINGLINE. DATE: TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. rrE�Frrr= it=rr UNDISTURBED EARTH MATERIAL 06.15.2016 LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL WITH ENGINEERING FABRIC AS DIRECTED BY THE ENGINEER. ACCOMPLISH COMPACTION. SHEET 2 OF 3 SHEET 20F 3 300.01 1300.01 ■ 01 END OF MATTING AT TOP OF BANK IN 6" TRENCH CF 700 COIR TOP OF EROSION CONTROL MATTING BANK TOE OF STREAMBANK IN RIFFLES STAKE (EDGE OF WATER IN OUTSIDE ( YP) BEND OF POOLS) /OPTION 1: (COVER TOE OF MATTING WITH RIFFLE MATERIAL) IN-SITU SOIL SLOPE INSTALLATION CKIh nC 1AATTIAIC IM '--TYPICAL STAKE (WITH OPTION 1) \-OPTION 3: TOE MATTING INTO TRENCH (RIFFLE OR POOL) OPTION 2: LARGE TOE STAKE 12" LONG 1"x1" HARDWOOD (POOL) IL MATTING Specifications: Coir fiber matting is a woven open mesh fabric made from 100% natural and biodegradable coir nettings installed on the surface to hold seed and soil intact during the establishment of vegetative cover. Roll Width 6'6" Roll Length 164' Area per Roll 120 square yards Weight per Roll 154 pounds Material 100% spun Coir Weight (g/m2) / (oz/sy) 700/M2 / 21oz/sy Minimum Thickness 0.3" ASTM 3776 Open Area % 50% Wide Width Tensile, Dry 114/ 54 (lb/ in) ASTM 4595 Wide Width Tensile, Wet 86/ 41 (lb/ in) ASTM 4595 Water Flow Velocity (ft/sec) 10.0 Permissible Shear (lbs/sf) 4.5 Elongation at Failure, Dry 51% x 36% ASTM 4595 Elongation at Failure, Wet 64% x 48% ASTM 4595 "C" Factor 1.5 : 1 Slope 0.003 Longevity 36 months Payment will be for area of matting placed in accordance with detail and include furnishing materials, labor, as well as stakes and staking. ROLL 6" TRENCH STAKE (NP) OVERLAP MATTING MOVING i UPSTREAM ACCORDING TO MANUFACTURER'S IN-SITU SOIL IN-SITU SOIL SPECIFICATIONS MIDDLE STAKE ' IF DITCH BOTTOM + + DITCH INSTALLATION WIDER THAN 2.5' + + (NP) + + + + 1I! III + + + IN-SITU THE WOOD STAKE SHALL BE + + SOIL 12 IN. NORTH AMERICAN + + + :'-II,I-I 1 GRADE AND GREEN ECO -STAKE OR TOE OF-----_ + :-III'_I SEED SOIL APPROVED EQUIVALENT MATTING + + TRENCHED IN F + J OR BURIED NOTES: 1. BANKS SHALL BE SEEDED (TEMPORARY AND PERMANENT) AND MULCHED PRIOR TO INSTALLATION OF MATTING 2. MATTING SHALL BE PLACED ACCORDING TO MANUFACTURER'S SPECIFICATIONS 3. MATTING SHALL BE STAKED IN DIAMOND PATTERN 4. AT TOP OF BANK, MATTING SHALL BE PLACED IN 6" DEEP TRENCH, STAKED, BACKFILLED, AND COMPACTED 5. COIR FIBER MATTING SHALL BE 700 g/sq m WEIGHT 3 COIR FIBER MATTING C-500 NOT TO SCALE WOOD STAKE (TYP) DOW/V S4 op" `V ��\ - / SLOPE SURFACE TRENCH CN N I INSTALLATION A STAKE DETAIL ON BARE SOIL 12" ST WA COMPACTED SOIL ALONG FRONT TRENCH WATTLE ON BARE SOIL WUUULN JIAKL N ANCHORED P OF OSION LANDSCAPE ARCHITECTURE 352 Depot Street I Suite 120 1 Asheville, NC 28801 1828.225.4945 1 siteworkstud 1NTROL JTING RFACE \ j\\%/\ INSTALLATION B STAKE DETAIL ON EROSION CONTROL MATTING JLV r L GRADE WIDTH AND DEPTH TO BE MATCHED TO EXISTING UPSTREAM AND DOWNSTREAM CHANNEL DIMENSIONS NOTES FOR TYPICAL DRY CHANNEL 1. APPLY LIVESTAKES DURING DORMANT SEASON ALONG BANKS 2. SEED BANKS WITH TEMPORARY SEED AND NATIVE RIPARIAN SEED MIX 3. UNDER BOARDWALK, USE CLASS A STONE TO LINE BANKS IN LIEU OF CF700 AND LIVESTAKES CLASS A&B STONE PLACED 1.5' DEEP AND 1' INTO TOE TO PROVIDE GRADE CONTROL 5A DRY CHANNEL RECONFIGURATION C-500 NOT TO SCALE BACKFILL WITH MIX OF COBBLE AND GRAVEL UPSTREAM OF BOULDER GRADE CONTROL SILLS SECTION DITCH APPLICATION NOTES: 1. WATTLES SHALL BE FILLED WITH PROFILE STRAW OR OTHER APPROVED MATERIAL 2. SPACING FOR WATTLES SHALL BE DETERMINED BY THE SITE ENGINEER. 4 STRAW WATTLE CHECK DAMS C-500 NOT TO SCALE BOULDERS PLACED IN BED AND ON GRADED RIGHT BANK, EMBED AND CONFIGURE AS DIRECTED BOULDER GRADE CONTROL SILLS (TYP), 3x2x2' BOULDERS, MIN DITCHLINE v 1/M 1.-4 -0 H' Z 700>1_400 r � 0) Em -E Z =D =-nZym =CARO z, 4 0 p H nDyD C O Z � aZ Z0 o~ r z m� Z D 171 x0 a0 Z v> C) z 0 M 840.54 CF 700 COIR EROSION CONTROL MATTING AND LIVESTAKES 1/C-501 (3x3' SPACING) ON BOTH BANKS (TYP) 1� < SECTION DROP FROM TOE OF UPSTREAM TO INVERT OF DOWNSTREAM NOT TO EXCEED 3" -I 1-2' (TYP) I- SPACING= -I 1/AVG EXISTING SLOPE PROFILE A L_ PLAN OF FRAME A SOLID COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIFIED. STATE USE OF SYSTEM ON COVER (I.E.: SEWER, STORM DRAIN, ELECTRICAL) TOP OF COVER B L_ BOTTOM OF COVER 2'-11/4" 1'-11'3/4" 3A 1" / `\\TYPE #1 � / \ ALTERNATE J L\ 4n 2'-01/211 2'-91/4" y SECTION A -A I I TYPE #2 CF 700 COIR EROSION CONTROL MATTING AND LIVESTAKES 1/C-501 (3x3' SPACING) ON REGRADED BANKS (TYP) 1* \ BOTTOM WIDTH AND DEPTH _ TO BE MATCHED TO EXISTING UPSTREAM AND DOWNSTREAM SECTION CHANNEL DIMENSIONS NOTES FOR TYPICAL DRY CHANNEL 1. APPLY LIVESTAKES DURING DROP FROM TOE OF DORMANT SEASON ALONG BANKS UPSTREAM TO INVERT OF 2. SEED BANKS WITH TEMPORARY DOWNSTREAM NOT TO SEED AND NATIVE RIPARIAN SEED MIX EXCEED 6" 3. UNDER BOARDWALK, USE BOULDERS TO LINE BANKS IN LIEU OF CF700 AND LIVESTAKES -I F-2' (TYP) 4. BOULDERS SHALL BE 3x2x2 (MIN) 5. CONSTRUCT PRACTICE AS DIRECTED BY ENGINEER IN FIELD SPACING= 6. USE FILTER FABRIC AND CHINK 1/AVG EXISTING SLOPE BOULDERS WITH CLASS A/B STONE AS DIRECTED PROFILE / B� STREAM STABILIZATION 24" X 36" x 24" POLYMER CONCRETE ]UNCTION BOX WITH - "CITY OF ASHEVILLE" STAMPED INTO THE TOP JUNCTION BOXES ARE TO BE INSTALLED AT THE END OF SIDEWALK RUNS AND NOT TO EXCE MIN. G" WIDE TRENCH 2 FEET DEEP COMPACT BACKFILL MATERIAL TO A MINIMUM OF 95% 4" DIA HDPE CONDUIT INSTALLED UNDER THE SIDEWALK A WITH TRACER WIRE SUPPORTLOG 12" O MIN. OR BOULDERS C O NOT TO SCALE MUD MATS: LASHED WOODEN TIMBERS PLAN OF COVER 1'-111/211 1" R. N CST 11 1 1/211 L/. r „ 4311 61 1' -10`181 1 SECTION B -B MINIMUM WEIGHTS - LBS. FRAME - 180 COVER - 120 TOTAL - 300 Fiber Optic Duct System z 0 C H>_ aQ 1 o45 CD i LLJa-1 E4 OOLLI �x °Cz 10 000 H CAHLLOJ ovcna z .jx 1 EL Fi Q D cc o LU LL CDZ0 z Q Z oa LU 0 H LL LUJ 0 CD z a LU HEET 1 OF 1 840.54 GENERAL NOTES: 'ALL ENDS OF THE CONDUIT ARE TO BE SEALED The fiber optic duct system will consist of rigid pipe, sweeps, handholes "4" WIDE WARNING TAPE TO REINSTALLED 12" BELOW TOP OF SIDEWALK (for sidewalks) and manholes (for streets). It will be primarily constructed INSTALL PER SECTION 1715 SUBSECTIONS 1-3 A&H OF THE NCDOT SPECIFICATION MANUAL following the traditional standards of underground construction. The pipe COORDINATE THE LOCATION OF THE DUCT AS TO WHERE IT WILL NOT SIT ATOP ANY WATER MAIN LINE will be placed first to establish the routing. A single copper conductor will be run through a duct for locating purposes. Grounding can occur as actual fiber/copper/etc lines are installed. 3 EA 1.25" DIA HDPE INNER DUCT WITH PULL WIRE FIBER OPTIC CONDUIT DETAIL (FROM SIDEWALK APPLICATION, ADAPT TO PROJECT) PAVED TRAIL CONDUIT �O OPT. 1 OCKS BASE BLOCKS LEVELING PAD 57 STONE FIBER OPTIC CONDUIT ADJACENT TO WALLS 3' (MIN) WATER DIVERSION CHANNEL -� 5' (TYP) �- FILTER FABRIC CLASS B STONE NOTE: 1. A 10-14' SPAN IS EXPECTED TO BE REQUIRED FOR CLINGMAN FOREST STREAM CROSSING. 2. CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 4. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 5. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 6. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 7. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED. TEMPORARY STREAM CROSSING - MUD MAT C-500 NOT TO SCALE Placement of lines within the conduit will be done to maximize usage of duct as illustrated in the example below. (Not applicable to project) Figure 5-4: Fiber Optic Duct System 4" duct shown 4" duct shown with Maxcell with Innerduct duct division duct division Figure 5-4: Fiber Optic Duct System Installation of Fiber Optic Duct System Required New installed streets and or sidewalks shall provide the fiber optic ducting in accordance with these standards as part of the general utility plan for the development. Fiber Optic Duct System Installation Standards Depth: The duct system should be placed between 24" and 36" deep for its protection. Locator Wire: A single insulated copper wire should be buried with the duct system for a method of locating while the pipe is unoccupied or might happen to contain non-metallic cables. Urban Locations: In downtown and urban areas, duct should be placed under sidewalks where possible, rather than streets to allow greater ease to access the duct system for adding spurs, loops, pullboxes etc. (For Clingman Forest Greenway project, duct shall follow asphalt paving except where deviation is shown) Pullboxes/Hand holes: Pullboxes/hand holes should be placed at every other lot line in new street installations and at every lot line in incremental installations such as the development of a single lot. Placement shall take future service to lots on the opposite side of the street in to consideration. (For Clingman Forest project, pullbox/handhold locations are shown where required) Pullbox requirements are provided in the detail to the left. Under -Street Installation: Duct installed under streets will require traffic -rated manholes for access. s FIBER OPTIC CONDUIT C-500 NOT TO SCALE _qitPwnrk STUDIOS LANDSCAPE ARCHITECTURE 352 Depot Street I Suite 120 1 Asheville, NC 28801 1828.225.4945 1 siteworkstud os.com INTERNATIONAL 797 HAYWOOD ROAD SUITE 201 ASHEVILLE, NC 28806 828-350-1408 WILDLANDS ENGINEERING, INC. NC LIC. NO. F-0831 167-B HAYWOOD ROAD ASHEVILLE, NC 28806 \\�C ARO/.*. I 18.)Etlmi I'tAIS' quo r'or r rJ :r(:nuy= 9 ••'•FNG I NE�.�'. �.�, 0 Q J Z) Z J UJ Uv LU Z o 11L Z ' ^ v UJ � Z z J - UJ O LL Q LLI 0 UJ Lu I..L O Q = Lu UJ U W LL v 1 CL _ U) Z Y Q LL O < LLO Z � � U LU U � Q LLJ 0 REVISIONS NO. REMARKS DATE CONSTRUCTION DOCUMENTS DATE: 06.15.2016 SHEET TITLE: CIVIL DETAILS SHEET NO.