HomeMy WebLinkAbout20160451 Ver 1_SW Permit Application COMBINED 4 of 5_20160622RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL D
DESIGNER: RMB Date: 6/21/2016
CHECKER: MDL Date: 6/21/2016
INPUT DATA:
Conduit Diameter
D =
1.25
ft
Conduit Discharge:
Q =
6.15
cfs
Conduit Slope at Outlet:
S =
0.02
ft/ft
Conduit Outlet Invert Elevation:
EI, CO =
2282.80
ft
Tailwater Elevation:
EI, TW =
2281.80
ft
Outlet Channel Invert Elevation:
EI, CH =
2281.30
ft
Water Density:
RHO =
1.00
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
D, 50 Riprap Size:
RS =
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.60
ft/ft
Upstream End Slope Ratio:
Zlu =
2.03
ft/ft
Downstream End Slope Ratio:
Zld =
1.71
ft/ft
Combined End Slope Ratio:
Z1 =
1.87
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (If Zp < 0 , Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: [Q/(gD^5)^0.5 <= (1.0+25*D,50/D)]
0. K.
**Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
2.24
ft
Pool depth at C/L Below Conduit Invert:
Zp+0.8Zm =
1.91
ft
Pool Bottom Elev:
EI,PB =
2280.89
ft
Pool Bottom Length:
2Lr2 =
0.78
ft
Pool Bottom Width:
2Wr2 =
0.73
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
2.25
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
1.95
ft
Pool Width at Tailwater Elev.:
2Wr =
3.66
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
El, BR =
2279.64
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2279.64
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
2.5
cu yd
Volume of Rock Riprap:
V,rs =
2.3
cu yd
Area of Geotextile:
A,gt =
13.6
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
Elev.2282.8 Elev.
2281.3
Elev.
1.9 2280.9
0.8
1 1
2.0 1.7
•— 1.4 —�
2.2 ---►
2.2 3.6 -+
SECTION A-A
' 8.4
3.7 77
0.7
1.3 1.6
f— 1.4—+ SECTION B-B
B
A A
ROCK GRADATION
% Passin Size (in) B
100 12 1516 - PLUNGE POOL D
60-85 9 LANDOWNER
25-50 6
5-20 3 DESIGNER: RMB
0-5 1.2 SHEET OF
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL E
DESIGNER: RMB Date: 6/21/2016
CHECKER: MDL Date: 6/21/2016
INPUT DATA:
Conduit Diameter
D =
1.25
ft
Conduit Discharge:
Q =
4.20
cfs
Conduit Slope at Outlet:
S =
0.02
ft/ft
Conduit Outlet Invert Elevation:
El, CO =
2236.50
ft
Tailwater Elevation:
EI, TW =
2235.50
ft
Outlet Channel Invert Elevation:
EI, CH =
2235.00
ft
Water Density:
RHO =
1.00
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
D, 50 Riprap Size:
RS =
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.57
ft/ft
Upstream End Slope Ratio:
Zlu =
2.74
ft/ft
Downstream End Slope Ratio:
Zld =
1.65
ft/ft
Combined End Slope Ratio:
Z1 =
2.20
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (if Zp < 0 , Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: [Q/(gD^5)^0.5 <= (1.0+25*D,50/D)]
0. K.
**Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
1.36
ft
Pool depth at C/L Below Conduit Invert:
Zp+0.8Zm =
1.43
ft
Pool Bottom Elev:
EI,PB =
2235.07
ft
Pool Bottom Length:
2Lr2 =
0.36
ft
Pool Bottom Width:
2Wr2 =
0.34
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
1.37
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
0.89
ft
Pool Width at Tailwater Elev.:
2Wr =
1.70
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
El, BR =
2233.82
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2233.82
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
1.3
cu yd
Volume of Rock Riprap:
V,rs =
1.2
cu yd
Area of Geotextile:
A,gt =
9.5
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
ROCK GRADA
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
1
Elev.22.36.5 1. q Elev.
T n /2235.0
Elev.
1.4 , 235.1
1
2.7 1.7
1.4 -�
1.4 2.4 —►
SECTION A -A
6.4
a
1.7
1.3 ' \ \ / / 1.6
n
1.1 SECTION B -B
1
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL r � J ✓tVR ���
DESIGNER: RMB
CHECKER: MDL
INPUT DATA:
Conduit Diameter
Conduit Discharge:
Conduit Slope at Outlet:
Conduit Outlet Invert Elevation:
Tailwater Elevation:
Outlet Channel Invert Elevation:
Water Density:
Bed/Riprap Particle Density: (Default 2.64)
D, 50 Riprap Size:
Riprap Thickness: (2.5*D, 50 recommended)
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
Side Slope Ratio:
Upstream End Slope Ratio:
Downstream End Slope Ratio:
Combined End Slope Ratio:
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Submergence Check: (if Zp < 0 , Use Zp = 0)
Beaching Check: [Q/(gD^5)^0.5 <= (1.0+25*D,50/D)]
**Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Pool depth at C/L Below Conduit Invert:
Pool Bottom Elev:
Pool Bottom Length:
Pool Bottom Width:
Upstream Pool Length at Tailwater Elev.:
Downstream Pool Length at Tailwater Elev.:
Pool Width at Tailwater Elev.:
Check Side Slope Ratio: (Wr>=We)
**INCREASE SIDE SLOPE RATIO, Zw**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
**INCREASE END SLOPE RATIO, Zlu**
Check Upstream Length: (Lru >= Xm)
**INCREASE END SLOPE RATIO, Zlu**
Pool Bottom Elev. at Bottom of Riprap:
Pool Bottom Elev. at Bottom of Bedding:
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
Volume of Rock Riprap:
Area of Geotextile:
Date: 6/21/2016
Date: 6/21/2016
D =
1.25
Zp+0.8Zm =
0.95 ft
Q =
0.26
cfs
-0.03 ft
S=
0.08
ft/ft
1
EI, CO =
2442.00
ft
-90.86 ft
EI, TW =
2441.00
ft
EI, CH =
2440.50
ft
RHO =
1.00
RHOS =
2.64
0. M e4ti�g
R5=
0.50
ft
RT =
1.25
ft
��
BT= 0.00 ft
Zw = 1000.00 ft/ft
G�
Zlu =
1000.00
ft/ft
Zld =
1000.00
ft/ft
Z1 =
1000.00
ft/ft
use c� j•f rV
app
Zp = 1.00 ft
Use Zp = 1.00 ft
0. K.
Xm =
0.08 ft
Zp+0.8Zm =
0.95 ft
EI,PB =
2441.05 ft
2Lr2 =
-0.03 ft
2Wr2 =
-0.03 ft
Lru =
-45.43 ft
Lrd =
-45.43 ft
2Wr =
-90.86 ft
*PROBLEM*
*PROBLEM*
*PROBLEM*
EI, BR = 2439.80 ft
EI, BB = 2439.80 ft
V,pbs = 86314.2 cu yd
V, rs = 86318.8 cu yd
A,gt = 579034.7 sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
ROCK GRADA
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
1
Elev. 2442.0 Elev.
0 440.5
Elev.
1.0 , 441.0
M
1
1000.0 1000.0
•— 0.0 —�
a 0.1
-45.4 704.6
SECTION A -A
2409.
-90.9 ';77
1.3 ' \ \ / / 1000.0
+-- 0.0— SECTION B -B
1
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL G
DESIGNER: RMB
Date:
6/21/2016
CHECKER: MDL
Date:
6/21/2016
INPUT DATA:
Conduit Diameter
D=
1.25
ft
Conduit Discharge:
Q=
2.68
cfs
Conduit Slope at Outlet:
S=
0.02
ft/ft
Conduit Outlet Invert Elevation:
EI, CO =
2376.00
ft
Tailwater Elevation:
El, TW =
2375.00
ft
Outlet Channel Invert Elevation:
EI, CH =
2374.50
ft
Water Density:
RHO =
1.00
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
D, 50 Riprap Size:
RS=
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.60
ft/ft
Upstream End Slope Ratio:
Zlu =
4.80
ft/ft
Downstream End Slope Ratio:
Zld =
1.60
ft/ft
Combined End Slope Ratio:
Z1 =
3.20
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (If Zp < 0 , Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: [Q/(gD^5)^0.5 <_ (1.0+25*D,50/D)]
0. K.
**Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
0.81
ft
Pool depth at C/L Below Conduit Invert: Zp+0.8Zm
=
1.16
ft
Pool Bottom Elev:
EI,PB =
2374.84
ft
Pool Bottom Length:
2Lr2 =
0.13
ft
Pool Bottom Width:
2Wr2 =
0.12
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
0.82
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
0.32
ft
Pool Width at Tailwater Elev.:
2Wr =
0.63
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
EI, BR =
2373.59
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2373.59
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
1.0
cu yd
Volume of Rock Riprap:
V,rs =
1.0
cu yd
Area of Geotextile:
A,gt =
9.3
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
ROCK GRADA
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
1
Elev. 2376.0 qElev.
T ';77374.5
Elev.
1.2 374.8
0.1
1
4.8 1.6
®— 0.5 —�
• 0.8 -i
0.8 ►t 1.7 --►
SECTION A -A
5.3
0.6 r;
1.3 ' \ \ / / 1.6
4-- 0.8--► SECTION B -B
n
1
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL H
DESIGNER: RMB Date: 6/21/2016
CHECKER: MDL Date: 6/21/2016
INPUT DATA
Conduit Diameter
D =
1.25
ft
Conduit Discharge:
Q =
1.97
cfs
Conduit Slope at Outlet:
S =
0.02
ft/ft
Conduit Outlet Invert Elevation:
EI, CO =
2405.00
ft
Tailwater Elevation:
EI, TW =
2404.00
ft
Outlet Channel Invert Elevation:
EI, CH =
2403.50
ft
Water Density:
RHO =
1.00
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
D, 50 Riprap Size:
RS =
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.53
ft/ft
Upstream End Slope Ratio:
Zlu =
8.20
ft/ft
Downstream End Slope Ratio:
Zld =
1.57
ft/ft
Combined End Slope Ratio:
Z1 =
4.89
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (If Zp < 0, Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: [Q/(gD^5)^0.5 <_ (1.0+25*D,50/D)]
0. K.
"*Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
0.58
ft
Pool depth at C/L Below Conduit Invert:
Zp+0.8Zm =
1.07
ft
Pool Bottom Elev:
EI,PB =
2403.93
ft
Pool Bottom Length:
2Lr2 =
0.05
ft
Pool Bottom Width:
2Wr2 =
0.05
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
0.58
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
0.13
ft
Pool Width at Tailwater Elev.:
2Wr =
0.26
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
El, BR =
2402.68
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2402.68
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
1.1
cu yd
Volume of Rock Riprap:
V,rs =
1.1
cu yd
Area of Geotextile:
A,gt =
11.5
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
Elev. 2405.0 Elev.
2403.5
Elev.
1.1 2403.9
0.1
1 1
8.2 1.6
— 0.3
0.6 — -
0.6 1.4
SECTION A-A
4.8
0.3
0.1 1
1.3 1.5
0.8—i SECTION B-B
B
A A
ROCK GRADATION
% Passing I Size (in) B
100 12 1516 - PLUNGE POOL H
60-85 9 LANDOWNER
25-50 6
5-20 3 DESIGNER: RMB
0-5 1.2 SHEET OF
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL J
DESIGNER: RMB
Date:
6/21/2016
CHECKER: MDL
Date:
6/21/2016
INPUT DATA:
Conduit Diameter
D=
1.25
ft
Conduit Discharge:
Q=
1.44
cfs
Conduit Slope at Outlet:
S=
0.08
ft/ft
Conduit Outlet Invert Elevation:
EI, CO =
2435.00
ft
Tailwater Elevation:
El, TW =
2434.00
ft
Outlet Channel Invert Elevation:
EI, CH =
2433.50
ft
Water Density:
RHO =
1.00
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
D, 50 Riprap Size:
RS=
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for eotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.53
ft/ft
Upstream End Slope Ratio:
Zlu =
35.53
ft/ft
Downstream End Slope Ratio:
Zld =
1.55
ft/ft
Combined End Slope Ratio:
Z1 =
18.54
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (If Zp < 0, Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: (Q/(gD^5)^0.5 <= (1.0+25*D,50/D)]
0. K.
"Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
0.42
ft
Pool depth at C/L Below Conduit Invert: Zp+0.8Zm =
1.01
ft
Pool Bottom Elev:
EI,PB =
2433.99
ft
Pool Bottom Length:
2Lr2 =
0.01
ft
Pool Bottom Width:
2Wr2 =
0.01
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
0.42
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
0.02
ft
Pool Width at Tailwater Elev.:
2Wr =
0.04
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
El, BR =
2432.74
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2432.74
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
3.4
cu yd
Volume of Rock Riprap:
V,rs =
3.4
cu yd
Area of Geotextile:
A,gt =
37.3
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
::Elev 24,35.0 _ q Elev.
__ ._ _ _ 1 'z�7 433.5
ROCK GRADA'
Elev.
1.0 2434.0
0.0
1 1
35.5 1.6
0.1 --►
r 0.4 - -
0.4 1.2 ►
SECTION A -A
mi•
0
1.3 ' \ 1.5
•— 0.8—► SECTION B -B
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET (Version 8.99)
(Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
JOB: 1516 - PLUNGE POOL K
DESIGNER: RMB Date: 6/21/2016
CHECKER: MDL Date: 6/21/2016
INPUT DATA:
Conduit Diameter
D =
1.25
ft
Conduit Discharge:
Q =
1.31
cfs
Conduit Slope at Outlet:
S =
0.08
ft/ft
Conduit Outlet Invert Elevation:
EI, CO =
2442.00
ft
Tailwater Elevation:
EI, TW =
2441.00
ft
Outlet Channel Invert Elevation:
EI, CH =
2440.50
ft
Water Density:
RHO =
1.00
ft
Bed/Riprap Particle Density: (Default 2.64)
RHOS =
2.64
ft
D, 50 Riprap Size:
RS =
0.50
ft
Riprap Thickness: (2.5*D, 50 recommended)
RT =
1.25
ft
Bedding Thickness: (6 inch min. rec.) (Enter 0 for geotextile)
BT =
0.00
ft
Side Slope Ratio:
Zw =
1.52
ft/ft
Upstream End Slope Ratio:
Zlu =
256.00
ft/ft
Downstream End Slope Ratio:
Zld =
1.55
ft/ft
Combined End Slope Ratio:
Z1 =
128.78
ft/ft
OUTPUT ---POOL LOCATION AND DIMENSIONS:
Vert. Dist. from Tailwater to Conduit Invert:
Zp =
1.00
ft
Submergence Check: (If Zp < 0, Use Zp = 0)
Use Zp =
1.00
ft
Beaching Check: [Q/(gD^5)^0.5 <= (1.0+25*D,50/D)]
0. K.
*"Beaching Controlled**
Distance from Conduit Exit to C/L Pool:
Xm =
0.38
ft
Pool depth at C/L Below Conduit Invert:
Zp+0.8Zm =
1.00
ft
Pool Bottom Elev:
EI,PB =
2441.00
ft
Pool Bottom Length:
2Lr2 =
0.00
ft
Pool Bottom Width:
2Wr2 =
0.00
ft
Upstream Pool Length at Tailwater Elev.:
Lru =
0.38
ft
Downstream Pool Length at Tailwater Elev.:
Lrd =
0.00
ft
Pool Width at Tailwater Elev.:
2Wr =
0.01
ft
Check Side Slope Ratio: (Wr>=We)
0. K.
**Side Slope Ratio Zw O.K.**
Check Min. End Slope Ratio: (Lru & Lrd >= Le)
0. K.
**End Slope Ratios O.K.**
Check Upstream Length: (Lru >= Xm)
0. K.
**End Slope Ratio Zlu O.K.**
Pool Bottom Elev. at Bottom of Riprap:
EI, BR =
2439.75
ft
Pool Bottom Elev. at Bottom of Bedding:
EI, BB =
2439.75
ft
OUTPUT ---VOLUMES BELOW WATER SURFACE ELEVATION:
Volume of Excavation (measured from bottom
surface of bedding):
V,pbs =
22.7
cu yd
Volume of Rock Riprap:
V,rs =
22.7
cu yd
Area of Geotextile:
A,gt =
249.0
sq yd
Spreadsheet developed by D. Hurtz, Midwest NTC, 1/90
Spreadsheet modified by M. Dreischmeier, Eau Claire TC, Wis., 3/98
Design Note No. 6 (Second Edition), Jan. 23, 1986
ROCK GRADA
RIPRAP LINED PLUNGE POOL FOR CANTILEVER OUTLET
Reference Design Note No. 6 (Second Edition), Jan. 23, 1986
1
Elev.2.442.0 Elev.
T n440.5
Elev.
1.0 , 441.0
M
1
256.0 1.6
�— 0.0 —►
- 0.4
0.4 P a 1.2 i
SECTION A -A
4.6
N
0.0
1.3 ' \ \ / / 1.5
�— 0.7—► SECTION B -B
1
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
2
Legend
Hvd. Origin
Description
1 SCS Runoff Pre - Entrance Rd SYS A
2 SCS Runoff Post - Entrance Rd SYS A
3 Reservoir Route
Project: 1516 Pilot Cove Entrance Road - System A 10yr Final.gpw
Monday, Jun 20, 2016
Hydrograph Return Period Recap
Hydra ow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
Hydrograph
Inflow
Peak Outflow (cfs)
Hydrograph
No.
type
hyd(s)
Description
(origin)
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
1
SCS Runoff
------
-------
------
------
-------
7.605
------
-------
-------
Pre - Entrance Rd SYS A
2
SCS Runoff
_____
___---
______
_______
_______
8.835
--- --
-------
-------
Post - Entrance Rd SYS A
3
Reservoir
2
---- ---
-- --
- --
-------
7.299
-------
-------
-------
Route
Proj. file: 1516 Pilot Cove Entrance Road - System A 10yr Final.gpw
Monday, Jun 20, 2016
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
7.605
2
718
15,269
------
------
------
Pre - Entrance Rd SYS A
2
SCS Runoff
8.835
2
716
17,870
------
------
------
Post - Entrance Rd SYS A
3
Reservoir
7.299
2
720
17,865
2
2134.01
1,222
Route
1516 Pilot Cove Entrance Road - System A
WeFjrraPglpwd: 10 Year
Monday, Jun 20, 2016
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 1
Pre - Entrance Rd SYS A
Hydrograph type =
SCS Runoff
Peak discharge
Storm frequency =
10 yrs
Time to peak
Time interval =
2 min
Hyd. volume
Drainage area =
1.580 ac
Curve number
Basin Slope =
0.0%
Hydraulic length
Tc method =
User
Time of conc. (Tc)
Total precip. =
6.53 in
Distribution
Storm duration =
24 hrs
Shape factor
" Composite (Area/CN) = [(1.330 x 61) + (0.250 x 90)] / 1.580
Q (cfs)
8.00
K
2.00
0.00 '
0 120 240
Hyd No. 1
Pre - Entrance Rd SYS A
Hyd. No. 1 -- 10 Year
360 480 600 720 840
4
Monday, Jun 20, 2016
= 7.605 cfs
= 718 min
= 15,269 cuft
= 66*
= Oft
= 5.00 min
= Type II
= 484
Q (cfs)
8.00
4.00
2.00
' 0.00
960 1080 1200 1320 1440 1560
Time (min)
Hydrograph
Report
5
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Monday, Jun 20, 2016
Hyd. No. 2
Post - Entrance Rd
SYS A
Hydrograph type
= SCS Runoff
Peak discharge
= 8.835 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 17,870 cuft
Drainage area
= 1.530 ac
Curve number
= 72*
Basin Slope
= 0.0%
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.53 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
" Composite (Area/CN) = [(1.080 x 61) + (0.450 x 98)] / 1.530
Q (cfs)
10.00
M
4.00
2.00
0.00 ' '
0 120 240
Hyd No. 2
Post - Entrance Rd SYS A
Hyd. No. 2 -- 10 Year
360 480 600 720 840
Q (cfs)
10.00
M
4.00
2.00
' 0.00
960 1080 1200 1320 1440
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 3
Route
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Inflow hyd. No.
= 2 - Post - Entrance Rd SYS A Max. Elevation
Reservoir name
= Pond 1
Max. Storage
Storage Indication method used.
Q (cfs)
10.00
M
4.00
2.00
0.00 '
0 120 240
Hyd No. 3
Route
Hyd. No. 3 -- 10 Year
360 480 600
Hyd No. 2
720
1
Monday, Jun 20, 2016
= 7.299 cfs
= 720 min
= 17,865 cuft
= 2134.01 ft
= 1,222 cuft
Q (cfs)
10.00
4.00
2.00
' 0.00
840 960 1080 1200 1320 1440 1560
Time (min)
011111 Total storage used = 1,222 cuft
Pond Report '
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24 Monday, Jun 20, 2016
Pond No. 1 - Pond 1
Pond Data
UG Chambers -Invert elev. = 2129.00 ft, Rise x Span = 3.00 x 3.00 ft, Barrel Len = 200.00 ft, No. Barrels = 10, Slope = 2.00%, Headers = No
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft)
0.00
2129.00
n/a
0
0
0.70
2129.70
n/a
42
42
1.40
2130.40
n/a
66
108
2.10
2131.10
n/a
78
186
2.80
2131.80
n/a
245
431
3.50
2132.50
n/a
276
707
4.20
2133.20
n/a
276
983
4.90
2133.90
n/a
245
1,228
5.60
2134.60
n/a
78
1,306
6.30
2135.30
n/a
66
1,372
7.00
2136.00
n/a
42
1,414
Culvert / Orifice Structures
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Weir Structures
Storage / Discharge Table
[A]
[B]
[C]
[PrfRsr]
Elevation
[A]
[B]
[C]
[D]
Rise (in)
= 18.00
12.00
0.00
0.00
Crest Len (ft)
= 4.00
0.00
0.00
0.00
Span (in)
= 18.00
12.00
0.00
0.00
Crest EI. (ft)
= 2133.80
0.00
0.00
0.00
No. Barrels
= 10
10
0
0
Weir Coeff.
= 2.60.00
3.33
3.33
3.33
Invert EI. (ft)
= 2129.00
2129.10
0.00
0.00
Weir Type
= Broad
---
---
---
Length (ft)
= 20.00
1.00
0.00
0.00
Multi -Stage
= No
No
No
No
Slope (%)
= 4.00
2.00
0.00
n/a
--- --- --- 4.943
3.50
707
2132.50
5.76 is
N -Value
= .013
.013
.013
n/a
4.20
983
2133.20
6.43 is
6.43 is
Orifice Coeff.
= 0.60
0.60
0.60
0.60
Exfil.(in/hr)
= 0 (by Wet
area)
7.05 is
-
Multi -Stage
= n/a
Yes
No
No
TW Elev. (ft)
= 0.00
7.61 is
-
---
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage /
Storage / Discharge Table
Stage
Storage
Elevation
Clv A
Civ B
CIV C
PrfRsr
Wr A Wr B Wr C
Wr D Exfil User Total
ft
cult
ft
cfs
cfs
cfs
cfs
cfs cfs cfs
cfs cfs cfs cfs
0.00
0
2129.00
0.00
0.00
---
---
0.00 --- ---
--- --- --- 0.000
0.70
42
2129.70
1.16 is
1.13 is
---
---
0.00 --- ---
--- --- --- 1.129
1.40
108
2130.40
2.95 is
2.94 is
---
---
0.00 --- ---
--- --- --- 2.936
2.10
186
2131.10
4.04 is
4.04 is
---
---
0.00 --- ---
--- --- --- 4.036
2.80
431
2131.80
4.94 is
4.94 is
---
---
0.00 --- ---
--- --- --- 4.943
3.50
707
2132.50
5.76 is
5.72 is
---
---
0.00 --- ---
--- --- --- 5.722
4.20
983
2133.20
6.43 is
6.43 is
---
---
0.00 --- ---
--- --- --- 6.425
4.90
1,228
2133.90
7.05 is
7.05 is
-
---
0.33 --- ---
--- --- --- 7.378
5.60
1,306
2134.60
7.61 is
7.61 is
-
---
7.44 --- ---
--- --- --- 15.05
6.30
1,372
2135.30
8.14 is
8.14 is
--
---
19.11 --- ---
--- --- --- 27.25
7.00
1,414
2136.00
8.64 is
8.64 is
---
---
33.94 --- ---
--- --- --- 42.57
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Legend
Hvd. Origin
0
Description
1 SCS Runoff Pre - Entrance Rd Sys B
2 SCS Runoff Post - Entrance Rd Sys B
3 Reservoir Route
Project: 1516 Pilot Cove Entrance Road - System B 10yr Final.gpw
Monday, Jun 20, 2016
Hydrograph Return Period Recap
Hydra ow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
Hydrograph
Inflow
Peak Outflow (cfs)
Hydrograph
No.
type
hyd(s)
Description
(origin)
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
1
SCS Runoff
------
-------
------
------
-------
5.173
------
-------
-------
Pre - Entrance Rd Sys B
2
SCS Runoff
_____
___---
______
_______
______
7.382
--- --
-------
-------
Post - Entrance Rd Sys B
3
Reservoir
2
---- ---
-- --
- --
-------
4.471
-------
-------
-------
Route
Proj. file: 1516 Pilot Cove Entrance Road - System B 10yr Final.gpw
Monday, Jun 20, 2016
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
5.173
2
718
10,429
------
------
------
Pre - Entrance Rd Sys B
2
SCS Runoff
7.382
2
716
17,770
------
------
------
Post - Entrance Rd Sys B
3
Reservoir
4.471
2
722
17,765
2
2155.79
2,564
Route
1516 Pilot Cove Entrance Road - System B
1 WeFjrraPglpwd: 10 Year
Monday, Jun 20, 2016
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 1
Pre - Entrance Rd Sys B
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Drainage area
= 1.010 ac
Curve number
Basin Slope
= 0.0%
Hydraulic length
Tc method
= User
Time of conc. (Tc)
Total precip.
= 6.53 in
Distribution
Storm duration
= 24 hrs
Shape factor
" Composite (Area/CN) = [(0.760 x 61) + (0.250 x 90)] / 1.010
Q (cfs)
6.00
5.00
3.00
2.00
1.00
0.00 ' '
0 120 240
Hyd No. 1
Pre - Entrance Rd Sys B
Hyd. No. 1 -- 10 Year
4
Monday, Jun 20, 2016
= 5.173 cfs
= 718 min
= 10,429 cuft
= 68*
= Oft
= 5.00 min
= Type II
= 484
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
' ' 0.00
360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Monday, Jun 20, 2016
Hyd. No. 2
Post - Entrance Rd Sys B
Hydrograph type
= SCS Runoff
Peak discharge
= 7.382 cfs
Storm frequency
= 10 yrs
Time to peak
= 716 min
Time interval
= 2 min
Hyd. volume
= 17,770 cuft
Drainage area
= 0.830 ac
Curve number
= 98*
Basin Slope
= 0.0%
Hydraulic length
= 0 ft
Tc method
= User
Time of conc. (Tc)
= 5.00 min
Total precip.
= 6.53 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
" Composite (Area/CN) _ [(0.320 x 98) + (0.450 x 63)] / 0.830
Post - Entrance
Rd Sys B
Q (cfs)
Hyd.
No. 2 -- 10 Year
Q (cfs)
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.00
0 120 240 360 480
600 720 840 960 1080 1200
Hyd No. 2
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 3
Route
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Inflow hyd. No.
= 2 - Post - Entrance Rd Sys B
Max. Elevation
Reservoir name
= Pond 1
Max. Storage
Storage Indication method used.
Q (cfs)
8.00
K
2.00
0.00
0 120 240
Hyd No. 3
Route
Hyd. No. 3 -- 10 Year
360 480 600
Hyd No. 2
720
1
Monday, Jun 20, 2016
= 4.471 cfs
= 722 min
= 17,765 cuft
= 2155.79 ft
= 2,564 cuft
Q (cfs)
8.00
4.00
2.00
0.00
840 960 1080 1200 1320 1440 1560
Time (min)
011111 Total storage used = 2,564 cuft
Pond Report '
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24 Monday, Jun 20, 2016
Pond No. 1 - Pond 1
Pond Data
UG Chambers -Invert elev. = 2149.50 ft, Rise x Span = 5.00 x 5.00 ft, Barrel Len = 150.00 ft, No. Barrels = 10, Slope = 2.30%, Headers = No
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft)
0.00
2149.50
n/a
0
0
0.85
2150.35
n/a
55
55
1.69
2151.19
n/a
91
146
2.54
2152.04
n/a
310
456
3.38
2152.88
n/a
465
921
4.23
2153.73
n/a
552
1,473
5.07
2154.57
n/a
552
2,026
5.91
2155.42
n/a
464
2,490
6.76
2156.26
n/a
310
2,800
7.60
2157.11
n/a
91
2,891
8.45
2157.95
n/a
55
2,946
Culvert / Orifice Structures
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Weir Structures
Storage / Discharge Table
[A]
[B]
[C]
[PrfRsr]
Elevation
[A]
[B]
[C]
[D]
Rise (in)
= 18.00
8.00
0.00
0.00
Crest Len (ft)
= 6.00
0.00
0.00
0.00
Span (in)
= 18.00
8.00
0.00
0.00
Crest EI. (ft)
= 2155.50
0.00
0.00
0.00
No. Barrels
= 10
10
0
0
Weir Coeff.
= 2.60.00
3.33
3.33
3.33
Invert EI. (ft)
= 2149.50
2149.60
0.00
0.00
Weir Type
= Broad
---
---
---
Length (ft)
= 20.00
1.00
0.00
0.00
Multi -Stage
= No
No
No
No
Slope (%)
= 4.00
2.00
0.00
n/a
--- --- --- 2.719
4.23
1,473
2153.73
3.11 is
N -Value
= .013
.013
.013
n/a
5.07
2,026
2154.57
3.49 is
3.44 is
Orifice Coeff.
= 0.60
0.60
0.60
0.60
Exfil.(in/hr)
= 0 (by Wet
area)
3.75 is
-
Multi -Stage
= n/a
Yes
No
No
TW Elev. (ft)
= 0.00
4.05 is
-
---
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage /
Storage / Discharge Table
Stage
Storage
Elevation
Clv A
Civ B
CIV C
PrfRsr
Wr A Wr B Wr C
Wr D Exfil User Total
ft
cult
ft
cfs
cfs
cfs
cfs
cfs cfs cfs
cfs cfs cfs cfs
0.00
0
2149.50
0.00
0.00
---
---
0.00 --- ---
--- --- --- 0.000
0.85
55
2150.35
1.06 is
1.05 is
---
---
0.00 --- ---
--- --- --- 1.053
1.69
146
2151.19
1.77 is
1.76 is
---
---
0.00 --- ---
--- --- --- 1.756
2.54
456
2152.04
2.30 is
2.28 is
---
---
0.00 --- ---
--- --- --- 2.282
3.38
921
2152.88
2.73 is
2.72 is
---
---
0.00 --- ---
--- --- --- 2.719
4.23
1,473
2153.73
3.11 is
3.10 is
---
---
0.00 --- ---
--- --- --- 3.101
5.07
2,026
2154.57
3.49 is
3.44 is
---
---
0.00 --- ---
--- --- --- 3.440
5.91
2,490
2155.42
3.80 is
3.75 is
-
---
0.00 --- ---
--- --- --- 3.754
6.76
2,800
2156.26
4.05 is
4.05 is
-
---
10.34 --- ---
--- --- --- 14.38
7.60
2,891
2157.11
4.34 is
4.32 is
--
---
31.72 --- ---
--- --- --- 36.04
8.45
2,946
2157.95
4.58 is
4.57 is
---
---
59.82 --- ---
--- --- --- 64.40
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
2
Legend
Hvd. Origin
Description
1 SCS Runoff Pre - New Rd SYS C
2 SCS Runoff Pre - New Rd SYS C
3 Reservoir Route
Project: 1516 Pilot Cove New Road - System C 1yr FINAL.gpw
Monday, Jun 20, 2016
Hydrograph Return Period Recap
Hydra ow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
Hydrograph
Inflow
Peak Outflow (cfs)
Hydrograph
No.
type
hyd(s)
Description
(origin)
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
1
SCS Runoff
------
3.240
-------
-------
-------
-------
-------
-------
-------
Pre - New Rd SYS C
2
SCS Runoff
------
3.942
-------
--- --__
______
_____
_______
-------
-------
Pre - New Rd SYS C
3
Reservoir
2
3.182
-------
--- ----
-------
-------
-------
-------
-------
Route
Proj. file: 1516 Pilot Cove New Road - System C 1yr FINAL.gpw
Monday, Jun 20, 2016
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuft)
Inflow
hyd(s)
Maximum
elevation
(ft)
Total
strge used
(cuft)
Hydrograph
Description
1
SCS Runoff
3.240
1
718
6,506
------
------
------
Pre - New Rd SYS C
2
SCS Runoff
3.942
1
718
7,986
------
------
------
Pre - New Rd SYS C
3
Reservoir
3.182
1
721
7,984
2
2238.61
511
Route
1516 Pilot Cove New Road - System C 1yr ll
INMugpvPeriod: 1 Year
Monday, Jun 20, 2016
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 1
Pre - New Rd SYS C
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 1.060 ac
Curve number
Basin Slope
= 0.0%
Hydraulic length
Tc method
= User
Time of conc. (Tc)
Total precip.
= 3.87 in
Distribution
Storm duration
= 24 hrs
Shape factor
" Composite (Area/CN) = [(1.060 x 76)] / 1.060
Q (cfs)
4.00
3.00
2.00
1.00
0.00 '
0 120 240
Hyd No. 1
Pre - New Rd SYS C
Hyd. No. 1 -- 1 Year
360 480 600 720 840
4
Monday, Jun 20, 2016
= 3.240 cfs
= 718 min
= 6,506 cuft
= 76*
= Oft
= 5.00 min
= Type II
= 484
Q (cfs)
4.00
3.00
2.00
1.00
0.00
960 1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 2
Pre - New Rd SYS C
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 1.060 ac
Curve number
Basin Slope
= 0.0%
Hydraulic length
Tc method
= User
Time of conc. (Tc)
Total precip.
= 3.87 in
Distribution
Storm duration
= 24 hrs
Shape factor
" Composite (Area/CN) = [(0.200 x 79) + (0.220 x 98) + (0.640 x 76)] / 1.060
Q (cfs)
4.00
3.00
2.00
1.00
0.00 ' '
0 120 240
Hyd No. 2
Pre - New Rd SYS C
Hyd. No. 2 -- 1 Year
360 480 600 720 840 960
Monday, Jun 20, 2016
= 3.942 cfs
= 718 min
= 7,986 cuft
= 81*
= Oft
= 5.00 min
= Type II
= 484
Q (cfs)
4.00
3.00
2.00
1.00
0.00
1080 1200 1320 1440
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24
Hyd. No. 3
Route
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 2 - Pre - New Rd SYS C
Max. Elevation
Reservoir name
= Pond 1
Max. Storage
Storage Indication method used.
Q (cfs)
4.00
3.00
2.00
1.00
0.00 '
0 120 240
Hyd No. 3
360 480 600
Hyd No. 2
Route
Hyd. No. 3 -- 1 Year
720
1
Monday, Jun 20, 2016
= 3.182 cfs
= 721 min
= 7,984 cuft
= 2238.61 ft
= 511 cuft
Q (cfs)
4.00
3.00
2.00
1.00
' 0.00
840 960 1080 1200 1320 1440 1560
Time (min)
Total storage used = 511 cuft
Pond Report '
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.24 Monday, Jun 20, 2016
Pond No. 1 - Pond 1
Pond Data
UG Chambers -Invert elev. = 2235.50 ft, Rise x Span = 3.00 x 3.00 ft, Barrel Len = 48.00 ft, No. Barrels = 20, Slope = 3.70%, Headers = No
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft)
0.00
2235.50
n/a
0
0
0.48
2235.98
n/a
12
12
0.96
2236.46
n/a
22
34
1.43
2236.93
n/a
76
109
1.91
2237.41
n/a
105
214
2.39
2237.89
n/a
125
339
2.87
2238.37
n/a
125
465
3.34
2238.84
n/a
104
569
3.82
2239.32
n/a
76
645
4.30
2239.80
n/a
22
667
4.78
2240.28
n/a
12
679
Culvert / Orifice Structures
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Weir Structures
Storage / Discharge Table
[A]
[B]
[C]
[PrfRsr]
[A]
[B]
[C]
[D]
Rise (in)
= 18.00
9.00
0.00
0.00
Crest Len (ft)
= 4.00
0.00
0.00
0.00
Span (in)
= 18.00
9.00
0.00
0.00
Crest EI. (ft)
= 2240.00
0.00
0.00
0.00
No. Barrels
= 10
10
0
0
Weir Coeff.
= 2.60.00
3.33
3.33
3.33
Invert EI. (ft)
= 2235.50
2235.60
0.00
0.00
Weir Type
= Broad
---
---
---
Length (ft)
= 20.00
1.00
0.00
0.00
Multi -Stage
= No
No
No
No
Slope (%)
= 4.00
2.00
0.00
n/a
34
2236.46
1.42 is
1.39 is
---
N -Value
= .013
.013
.013
n/a
---
---
1.387
1.43
109
Orifice Coeff.
= 0.60
0.60
0.60
0.60
Exfil.(in/hr)
= 0 (by Wet
area)
---
---
Multi -Stage
= n/a
Yes
No
No
TW Elev. (ft)
= 0.00
---
---
0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage /
Storage / Discharge Table
Stage
Storage
Elevation
Clv A
Civ B
CIV C
PrfRsr
Wr A
Wr B
Wr C
Wr D
Exfil
User
Total
ft
cult
ft
cfs
cfs
cfs
cfs
cfs
cfs
cfs
cfs
cfs
cfs
cfs
0.00
0
2235.50
0.00
0.00
---
---
0.00
---
---
---
---
---
0.000
0.48
12
2235.98
0.46 is
0.46 is
---
---
0.00
---
---
---
---
---
0.464
0.96
34
2236.46
1.42 is
1.39 is
---
---
0.00
---
---
---
---
---
1.387
1.43
109
2236.93
1.91 is
1.91 is
---
---
0.00
---
---
---
---
---
1.909
1.91
214
2237.41
2.37 is
2.34 is
---
---
0.00
---
---
---
---
---
2.337
2.39
339
2237.89
2.73 is
2.71 is
---
---
0.00
---
---
---
---
---
2.712
2.87
465
2238.37
3.04 is
3.04 is
---
---
0.00
---
---
---
---
---
3.044
3.34
569
2238.84
3.35 is
3.35 is
---
---
0.00
---
---
---
---
---
3.349
3.82
645
2239.32
3.64 is
3.63 is
---
---
0.00
---
---
---
---
---
3.634
4.30
667
2239.80
3.89 is
3.89 is
---
---
0.00
---
---
---
---
---
3.895
4.78
679
2240.28
4.19 is
4.14 is
---
---
1.51
---
---
---
---
---
5.650
2/9/2016 Precipitation Frequency Data Server
NOAA Atlas 14, Volume 2, Version 3
Location name: Pisgah Forest, North Carolina, jft .1
US*
Latitude: 35.2156°, Longitude: -82.7053°
Elevation: 2187 ft* `'k4
'source: Google Maps"
POINT PRECIPITATION FREQUENCY ESTIMATES
G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley
NOAA, National Weather Service, Silver Spring, Maryland
PF tabular I PFyraahical I Mals & aerials
PF tabular
PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1
Average recurrence interval (years)
Duration ����������
1 2 5 10 25 50 100 200 500 1000
4.69 5.58 6.65 7.48 8.53 9.34 10.2 10.9 12.0 12.9
5 -min (4.25-5.22) (5.05-6.20) (6.01-7.38) (6.72-8.28) (7.63-9.46) (8.29-10.4) (8.96-11.3) (9.61-12.2) (10.4-13.5) (11.0-14.5)
3.74 4.46 5.33 5.98 6.80 7.43 8.06 8.68 9.49 10.1
10 -min (3.39-4.16) (4.04-4.96) (4.81-5.91) (5.38-6.62) (6.08-7.54) (6.61-8.24) (7.13-8.96) (7.61-9.67) (8.23-10.6) (8.69-11.4)
3.12 3.74 4.49 5.04 5.75 6.28 6.80 7.30 7.97 8.47
15 -min
(2.82-3.47) (3.38-4.16) (4.06-4.98) (4.53-5.59) (5.14-6.36) (5.58-6.96) (6.00-7.55) (6.41-8.14) (6.91-8.93) (7.27-9.54)
30 -min 2.14 2.58 3.19 3.65 4.26 4.73 5.21 5.68 6.34 6.86
(1.94-2.38) (2.34-2.87) (2.88-3.54) (3.28-4.05) (3.80-4.71) (4.20-5.24) (4.60-5.78) (4.99-6.33) (5.50-7.10) (5.89-7.72)
1.33 1.62 2.04 2.38 2.83 3.20 3.58 3.98 4.55 5.00
60 -min
(1.21-1.48) (1.47-1.80) (1.85-2.27) (2.14-2.63) (2.53-3.14) (2.85-3.55) (3.17-3.98) (3.50-4.44) (3.94-5.10) (4.30-5.64)
2 -hr 0.792 0.958 1.21 1.40 1.68 1.91 2.15 2.41 F 3.07
1(0.717-0.874)11(0.870-1.06) 1 (1.09-1.33) 1 (1.26-1.55) 1 (1.50-1.85) 1 (1.69-2.11) 1 (1.89-2.38) 1 (2.10-2.67) (2.39 3.09)1 (2.63-3.44)
3 -hr 0.578 0.697 0.870 1.01 1.22 1.40 1.59 1.80 2.10 2.35
1(0.522-0.645)11(0.630-0.776)1(0.784-0.970)1(0.911-1.13) 1 (1.09-1.36) 1 (1.24-1.56) 11 (1.39-1.77) 1 (1.55-2.01) 1 (1.79-2.35) 1 (1.98-2.65)
6 -hr 0.392 0.468 0.577 0.669 0.805 0.921 1.05 1.19 1.40 1.58
(0.358-0.433) (0.428-0.517) (0.526-0.637) (0.607-0.739) (0.724-0.889) (0.822-1.02) (0.925-1.16) ( 1.04-1.32) ( 1.20-1.56) ( 1.33-1.77)
12 -hr 0.256 0.307 0.377 0.434 0.514 0.581 0.651 0.727 0.836 0.927
(0.235-0.281) (0.281-0.336) (0.345-0.413) (0.395-0.475) (0.466-0.563) (0.524-0.637) (0.582-0.715) (0.644-0.801) (0.731-0.928) (0.802-1.04)
3 -day 0.069 0.082 0.099 0.112 0.131 0.145 0.160 0.175 0.195 0.210
(0.065-0.074) (0.077-0.088) (0.093-0.106) (0.105-0.120) (0.122-0.140) (0.135-0.155) (0.148-0.171) (0.161-0.187) (0.178-0.209) (0.192-0.226)
4 -day 0.055 0.066 0.078 0.089 0.102 0.113 0.123 0.134 0.149 0.160
(0.052-0.059) (0.062-0.070) (0.074-0.084) (0.083-0.094) (0.096-0.109) (0.105-0.120) (0.115-0.132) (0.124-0.143) (0.137-0.159) (0.146-0.171)
7 -day 0.037 0.044 0.053 0.060 0.069 0.076 0.084 0.092 0.102 0.110
(0.035-0.040) (0.041-0.047) (0.049-0.056) (0.056-0.064) (0.064-0.074) (0.071-0.082) (0.078-0.090) (0.084-0.098) (0.093-0.109) (0.100-0.118)
10 -day 0.030 0.035 0.042 0.047 0.054 0.060 0.065 0.071 0.079 0.084
(0.028-0.032) (0.033-0.038) (0.039-0.045) (0.044-0.050) (0.051-0.058) (0.056-0.064) (0.061-0.070) (0.066-0.076) (0.072-0.084) (0.077-0.090)
20 -day 0.020 0.024 0.028 0.031 0.034 0.037 0.040 0.043 0.046 0.049
(0.019-0.021) (0.023-0.025) (0.026-0.029) (0.029-0.032) (0.032-0.036) (0.035-0.039) (0.038-0.042) (0.040-0.045) (0.043-0.049) (0.045-0.052)
30 -day 0.0167F 0.019 0.022 0.024 0.027 0.029 0.031 0.0327F 0.034 0.036
(0.016-0.017) (0.018-0.020) (0.021-0.023) (0.023-0.025) (0.025-0.028) (0.027-0.030) (0.029-0.032) (0.030-0.034) (0.032-0.036) (0.034-0.038)
45�iay 0.014 0.016 0.018 0.020 0.022 0.023 0.024 0.025 0.026 0.027
(0.013-0.015) (0.016-0.017) (0.018-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.024) (0.023-0.025) (0.024-0.026) (0.025-0.028) (0.026-0.029)
60 -day 0.012 0.015 0.016 0.017 0.019 0.020 0.021 0.022 0.022 0.023
(0.012-0.013) (0.014-0.015) (0.016-0.017) (0.017-0.018) (0.018-0.020) (0:019-0.021) (0.020-0.022) (0.021-0.023) (0.021-0.024) (0.022-0.024)
t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a
given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not
checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.2156&Ion=-82.7053&data=intensity&units=english&series=pds 1/4
0.161
0.193
0.237
0.272
0.320
0.359
0.400
0.441
0.498
0.543
24 -hr
(0.150-0.174)
(0.180-0.208)
(0.220-0.256)
(0.252-0.293)
(0.296-0.345)
(0.331-0.387)
(0.367-0.429)
(0.403-0.474)
(0.451-0.536)
(0.489-0.585)
0.097
0.116
0.140 7
F-03160
0.188
0.210
0.232
0.255 7
F -O-.287
0.311
2 -day
(0.090-0.104)
1(0.108-0.125)1(0.131-0.151)
[n.149-0.172)]1(0.174-0.202)
(0.194-0.225)
(0.214-0.250)
(0.234-0.275)
(0.261-0.309)
(0.282-0.336)
3 -day 0.069 0.082 0.099 0.112 0.131 0.145 0.160 0.175 0.195 0.210
(0.065-0.074) (0.077-0.088) (0.093-0.106) (0.105-0.120) (0.122-0.140) (0.135-0.155) (0.148-0.171) (0.161-0.187) (0.178-0.209) (0.192-0.226)
4 -day 0.055 0.066 0.078 0.089 0.102 0.113 0.123 0.134 0.149 0.160
(0.052-0.059) (0.062-0.070) (0.074-0.084) (0.083-0.094) (0.096-0.109) (0.105-0.120) (0.115-0.132) (0.124-0.143) (0.137-0.159) (0.146-0.171)
7 -day 0.037 0.044 0.053 0.060 0.069 0.076 0.084 0.092 0.102 0.110
(0.035-0.040) (0.041-0.047) (0.049-0.056) (0.056-0.064) (0.064-0.074) (0.071-0.082) (0.078-0.090) (0.084-0.098) (0.093-0.109) (0.100-0.118)
10 -day 0.030 0.035 0.042 0.047 0.054 0.060 0.065 0.071 0.079 0.084
(0.028-0.032) (0.033-0.038) (0.039-0.045) (0.044-0.050) (0.051-0.058) (0.056-0.064) (0.061-0.070) (0.066-0.076) (0.072-0.084) (0.077-0.090)
20 -day 0.020 0.024 0.028 0.031 0.034 0.037 0.040 0.043 0.046 0.049
(0.019-0.021) (0.023-0.025) (0.026-0.029) (0.029-0.032) (0.032-0.036) (0.035-0.039) (0.038-0.042) (0.040-0.045) (0.043-0.049) (0.045-0.052)
30 -day 0.0167F 0.019 0.022 0.024 0.027 0.029 0.031 0.0327F 0.034 0.036
(0.016-0.017) (0.018-0.020) (0.021-0.023) (0.023-0.025) (0.025-0.028) (0.027-0.030) (0.029-0.032) (0.030-0.034) (0.032-0.036) (0.034-0.038)
45�iay 0.014 0.016 0.018 0.020 0.022 0.023 0.024 0.025 0.026 0.027
(0.013-0.015) (0.016-0.017) (0.018-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.024) (0.023-0.025) (0.024-0.026) (0.025-0.028) (0.026-0.029)
60 -day 0.012 0.015 0.016 0.017 0.019 0.020 0.021 0.022 0.022 0.023
(0.012-0.013) (0.014-0.015) (0.016-0.017) (0.017-0.018) (0.018-0.020) (0:019-0.021) (0.020-0.022) (0.021-0.023) (0.021-0.024) (0.022-0.024)
t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a
given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not
checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.2156&Ion=-82.7053&data=intensity&units=english&series=pds 1/4
3/3/2016
Precipitation Frequency Data Server
NOAA Atlas 14, Volume 2, Version 3 BREVARD
Station ID: 31-1055
Location name: Pisgah Forest, North Carolina,
US*
Latitude: 35.2156*, Longitude: -82.7053° p
Elevation:
Elevation (station metadata): 2212 ft*
* source: Google Maps
POINT PRECIPITATION FREQUENCY ESTIMATES
G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley
NOAA, National Weather Service, Silver Spring, Maryland
PF tabular I PF graphical I Maas & aerials
PF tabular
PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)1
Average recurrence interval (years)
000 10 25 50 100 200 500 1000
0.780 0.935 1.12 1.26 1.44 1.57 1.70 1.82 1.99 2.12
15 -min
1(0.706-0.868)1(0.846-1.04) 1 (1.01-1.25) 1 (1.13-1.40) 11 (1.28-1.59) 11 (1.39-1.74) 1 (1.50-1.89) (1.60-2.03) (1.73-2.23) (1.82-2.38)
30 -min 1.07 1.29 1.59 1.83 2.13 2.36 2.60 2.84 F 3.43
(0.968-1.19) 1 (1.17-1.44) 1 (1.44-1.77) 11 (1.64-2.02) (1.90-2.36) (2.10-2.62) (2.30-2.89) (2.49-3.17) (2.75 3.55) (2.94-3.86)
1.33 1.62 2.04 2.38 2.83 3.20 3.58 3.98 4.55 5.00
60 -min (1.21-1.48) 1 (1.47-1.80) 1 (1.85-2.27) 1 (2.14-2.63) (2.53-3.14) (2.85-3.55) (3.17-3.98) (3.50-4.44) (3.94-5.10) (4.30-5.64)
1.58 1.92 2.41 2.81 3.36 -3.-81--]F-4.-29--]F-4-.81--]F-5-.5-4 6.15
2 -hr (1.43-1.75) (1.74-2.12) 1 (2.18-2.66) 1 (2.52-3.10) 1 (3.00-3.70) 11 (3.39-4.21) (3.78-4.75) (4.21-5.33) (4.79-6.17) (5.25-6.88)
3 -hr 1.74 2.09 2.61 3.05 3.68 4.21 4.77 5.39 6.30 7.07
(1 .57-1.94) (1.89-2.33) 1 (2.35-2.91) 1 (2.74-3.39) 11 (3.27-4.09) 11 (3.72-4.68) (4.18-5.32) (4.67-6.03) (5.38-7.07) (5.96-7.97)
6 -hr 2.35 2.80 3.45 4.01 4.82 5.52 6.28 7.12 8.37 9.44
(2.14-2.59) 1 (2.56-3.10) 1 (3.15-3.82) 11 (3.63-4.42) (4.34-5.32) (4.92-6.09) (5.54-6.95) (6.21-7.90) (7.17-9.33) (7.97-10.6)
12 -hr 3.09 3.70 4.54 5.22 6.19 6.99 7.84----1F-8--6-1F-1-o--1-1F-1-1--].7.2
(2.83-3.38) 1 (3.39-4.05) 1 (4.16-4.98) (4.76-5.72) (5.61-6.79) (6.31-7.67) (7.01-8.62) (7.76-9.65) (8.81-11.2) (9.66-12.5)
24 -hr 3.87 4.63 5.69 6.53 7.69 8.62 9.59 10.6 12.0 13.0
(3.60-4.18) 1 (4.31-5.00) 1 (5.28-6.14) (6.06-7.03) (7.11-8.27) (7.95-9.28) (8.80-10.3) (9.67-11.4) (10.8-12.9) (11.7-14.0)
2tlay 4.66 -5.-55--]F-6.-74- 7.70 9.07 10.1 11.1 12.3 13.8 15.0
(4.34-5.01) (5.17-5.98) (6.28-7.25) (7.16-8.28) (8.35-9.68) (9.30-10.8) (10.3-12.0) (11.2-13.2) 1(12.5-14.8) (13.5-16.1)
3 -day 4.97 5.92 7.13 8.10 9.41 10.4 ) ( 11.5 ) ( 12.6 ) 14.0 15.1
(4. 66-5.33) (5.54-6.35) (6.67-7.64) (7.56-8.67) (8.76-10.1) (9.71-11.2 10.6-12.3 11.6-13.5 ( 12.8-15.0) ( 13.8-16.3)
5.29 6.29 7.53 8.50 9.81 10.8 11.9 12.9 14.3 15.3
4{lay (4.97-5.65) (5.91-6.71) (7.06-8.03) (7.96-9.06) (9.17-10.4) 11 (10.1-11.5) 1 (11.0-12.6) (11.9-13.7) (13.1-15.2) (14.0-16.4)
0.391
0.465
0.554
0.623
0.711
0.778
0.846
0.912
1.00
1.07
5 -min
(0.354-0.435)
(0.421-0.517)
(0.501-0.615)
(0.560-0.690)
(0.636-0.788)
(0.691-0.863)
(0.747-0.940)
(0.801-1.02)
(0.867-1.12)
(0.920-1.21)
0.624
0.744
0.888
0.996
1.13
1.24
1.34
1.45
1.58
1.69
10 -min
1(0.565-0.694)1(0.673-0.827)1(0.802-0.985)1(0.896-1.10)11
(8.00-9.07)
(9.46-10.7)
(10.6-12.1)
(1.01-1.26)
11 (1.10-1.37)
1 (1.19-1.49)
(1.27-1.61)
(1.37-1.77)
(1.45-1.90)
0.780 0.935 1.12 1.26 1.44 1.57 1.70 1.82 1.99 2.12
15 -min
1(0.706-0.868)1(0.846-1.04) 1 (1.01-1.25) 1 (1.13-1.40) 11 (1.28-1.59) 11 (1.39-1.74) 1 (1.50-1.89) (1.60-2.03) (1.73-2.23) (1.82-2.38)
30 -min 1.07 1.29 1.59 1.83 2.13 2.36 2.60 2.84 F 3.43
(0.968-1.19) 1 (1.17-1.44) 1 (1.44-1.77) 11 (1.64-2.02) (1.90-2.36) (2.10-2.62) (2.30-2.89) (2.49-3.17) (2.75 3.55) (2.94-3.86)
1.33 1.62 2.04 2.38 2.83 3.20 3.58 3.98 4.55 5.00
60 -min (1.21-1.48) 1 (1.47-1.80) 1 (1.85-2.27) 1 (2.14-2.63) (2.53-3.14) (2.85-3.55) (3.17-3.98) (3.50-4.44) (3.94-5.10) (4.30-5.64)
1.58 1.92 2.41 2.81 3.36 -3.-81--]F-4.-29--]F-4-.81--]F-5-.5-4 6.15
2 -hr (1.43-1.75) (1.74-2.12) 1 (2.18-2.66) 1 (2.52-3.10) 1 (3.00-3.70) 11 (3.39-4.21) (3.78-4.75) (4.21-5.33) (4.79-6.17) (5.25-6.88)
3 -hr 1.74 2.09 2.61 3.05 3.68 4.21 4.77 5.39 6.30 7.07
(1 .57-1.94) (1.89-2.33) 1 (2.35-2.91) 1 (2.74-3.39) 11 (3.27-4.09) 11 (3.72-4.68) (4.18-5.32) (4.67-6.03) (5.38-7.07) (5.96-7.97)
6 -hr 2.35 2.80 3.45 4.01 4.82 5.52 6.28 7.12 8.37 9.44
(2.14-2.59) 1 (2.56-3.10) 1 (3.15-3.82) 11 (3.63-4.42) (4.34-5.32) (4.92-6.09) (5.54-6.95) (6.21-7.90) (7.17-9.33) (7.97-10.6)
12 -hr 3.09 3.70 4.54 5.22 6.19 6.99 7.84----1F-8--6-1F-1-o--1-1F-1-1--].7.2
(2.83-3.38) 1 (3.39-4.05) 1 (4.16-4.98) (4.76-5.72) (5.61-6.79) (6.31-7.67) (7.01-8.62) (7.76-9.65) (8.81-11.2) (9.66-12.5)
24 -hr 3.87 4.63 5.69 6.53 7.69 8.62 9.59 10.6 12.0 13.0
(3.60-4.18) 1 (4.31-5.00) 1 (5.28-6.14) (6.06-7.03) (7.11-8.27) (7.95-9.28) (8.80-10.3) (9.67-11.4) (10.8-12.9) (11.7-14.0)
2tlay 4.66 -5.-55--]F-6.-74- 7.70 9.07 10.1 11.1 12.3 13.8 15.0
(4.34-5.01) (5.17-5.98) (6.28-7.25) (7.16-8.28) (8.35-9.68) (9.30-10.8) (10.3-12.0) (11.2-13.2) 1(12.5-14.8) (13.5-16.1)
3 -day 4.97 5.92 7.13 8.10 9.41 10.4 ) ( 11.5 ) ( 12.6 ) 14.0 15.1
(4. 66-5.33) (5.54-6.35) (6.67-7.64) (7.56-8.67) (8.76-10.1) (9.71-11.2 10.6-12.3 11.6-13.5 ( 12.8-15.0) ( 13.8-16.3)
5.29 6.29 7.53 8.50 9.81 10.8 11.9 12.9 14.3 15.3
4{lay (4.97-5.65) (5.91-6.71) (7.06-8.03) (7.96-9.06) (9.17-10.4) 11 (10.1-11.5) 1 (11.0-12.6) (11.9-13.7) (13.1-15.2) (14.0-16.4)
20 -day 9'71 11.4 13.2 14.7 76.5 17.9 19.2 20.6 22.2 23.5
(9.22-10.3) (10.8-12.1) (12.6-14.0) (13.9-15.5) (15.6-17.4) 11 ( 16.9-18.9) (18.1-20.4) 1(19.3-21.8) (20.8-23.6) (21.8-24.9)
30 -day 11.9 13.9 15.9 17.4 19.3 20.7 22.0 23.3 24.8 25.9
(11.3-12.5) (13.2-14.7) (15.1-16.7) (16.5-18.3) (18.3-20.3) 11 (19.6-21.8) 1 (20.8-23.2) (21.9-24.5) (23.3-26.2) (24.2-27.4)
45 -day 15.1 17.6 -1-.8-F-2-1.-4-F-2-3.-4-F-2-4.-8-F-2-6.0 27.1 28.4 29.3
(14.4-15.8) (16.8-18.5) (18.9-20.8) (20.4-22.5) (22.3-24.6) (23.6-26.0) (24.7-27.3) (25.7-28.5) (26.9-29.9) (27.7-30.9)
18.0 20.9 23.4 25.1 27.2 28.7 30.0 31.1 32.4 33.2
60�ay] 1
(17.2-18.8) (20.0-21.9) (22.4-24.5) (24.1-26.3) (26.1-28.5) (27.4-30.0) (28.6-31.4) (29.7-32.6) (30.8-34.0) (31.6-34.9)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates
(for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds
are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAH Atlas 14 document for more information.
http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?st=nc&sta=31-1055&data=depth&units=english&series=pds 1/4
6.24
7.41
8.86
10.0
11.6
12.8
14.1
15.4
17.1
18.4
7 -day
(5.85-6.68)
(6.94-7.94)
(8.30-9.49)
(9.36-10.7)
(10.8-12.4)
11 (11.9-13.7)
1 (13.1-15.1)
(14.2-16.5)
(15.7 18.4)
(16.8-19.9)
7.19
8.50
10.1
11.3
13.0
14.3
15.7
17.0
18.8
20.2
10 -day
(6.76-7.66)
(8.00-9.07)
(9.46-10.7)
(10.6-12.1)
(12.2-13.9)
11 (13.4-15.3)
1 (14.6-16.7)
(15.8-18.2)
(17.4-20.2)
(18.5-21.7)
20 -day 9'71 11.4 13.2 14.7 76.5 17.9 19.2 20.6 22.2 23.5
(9.22-10.3) (10.8-12.1) (12.6-14.0) (13.9-15.5) (15.6-17.4) 11 ( 16.9-18.9) (18.1-20.4) 1(19.3-21.8) (20.8-23.6) (21.8-24.9)
30 -day 11.9 13.9 15.9 17.4 19.3 20.7 22.0 23.3 24.8 25.9
(11.3-12.5) (13.2-14.7) (15.1-16.7) (16.5-18.3) (18.3-20.3) 11 (19.6-21.8) 1 (20.8-23.2) (21.9-24.5) (23.3-26.2) (24.2-27.4)
45 -day 15.1 17.6 -1-.8-F-2-1.-4-F-2-3.-4-F-2-4.-8-F-2-6.0 27.1 28.4 29.3
(14.4-15.8) (16.8-18.5) (18.9-20.8) (20.4-22.5) (22.3-24.6) (23.6-26.0) (24.7-27.3) (25.7-28.5) (26.9-29.9) (27.7-30.9)
18.0 20.9 23.4 25.1 27.2 28.7 30.0 31.1 32.4 33.2
60�ay] 1
(17.2-18.8) (20.0-21.9) (22.4-24.5) (24.1-26.3) (26.1-28.5) (27.4-30.0) (28.6-31.4) (29.7-32.6) (30.8-34.0) (31.6-34.9)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates
(for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds
are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAH Atlas 14 document for more information.
http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?st=nc&sta=31-1055&data=depth&units=english&series=pds 1/4
Excise Tax: $1400.00
Parcel Identifier No.
By:
Book 730 Page 412
11111111111111111111111111111
zmsooama
TRANSYLVANIA CO, NC FEE $26.00
STATE OF NC REAL ESTATE EXTX
$1400.00
PRESENTEE) & RECORDED
.
06-26-2015 08:57:30 AM
CINDY M OWNBEY
REGISTER OF DEEDS
BY D REE M. POWELL
DEPUTY REGISTER OF DEEDS
BK: DOC 730
PG: 412-415
NORTH CAROLINA GENERAL WARRANTY DEED
Verified by Transylvania County on the -Au day of
Mail/Box to: Ramsey & Pratt, P.A., 35 N. Gaston Street, Brevard, NC 28712
This instrument was prepared by: Michael K. Pratt
Brief description for the Index:
THIS DEED made this 16th day of June , 2015, by and between
GRANTOR
WILLIAM P. BRYSON, JR., and wife,
LUCY W. BRYSON; NANCY B. HUGHES and husband,
HOWARD T. HUGHES; BRYSON DEVELOPMENT
AND MANAGEMENT LIMITED PARTNERSHIP a/k/a
The Bryson Development and Management Limited
Partnership
PO Box 461
Pisgah Forest, NC 28768
GRANTEE
LASTINGER PROPERTIES, LLC
180A Cross Creek Farm Road
Fletcher, NC 28732
The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall
include singular, plural, masculine, feminine or neuter as required by context.
WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby
acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain
lot or parcel of land situated in the City of n/a , Brevard Township, Transylvania County, North Carolina
and more particularly described as follows:
BEING ALL OF THE SAME LAND DESCRIBED ON THE PAGE WHICH IS ATTACHED HERETO, DESIGNATED AS
EXHIBIT "A" AND INCORPORATED HEREIN BY REFERENCE.
All or a portion of theproperty herein conveyed —X—does does not include the primary residence of the William P.
Bryson, Jr., and wife, Lucy W. Bryson.
A map showing the above described property is recorded in Plat File , Slide
Book 730 Page 413
TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto
belonging to the Grantee in fee simple.
And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the
right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and
that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other
than the following exceptions:
Title to the property hereinabove described is conveyed subject to the following exceptions:
Exceptions and reservations contained in this deed and/or in instruments referenced herein.
Easements and rights of way for public and private roads and utilities, of public record.
Lien of ad valorem taxes for the current year and subsequent years, not yet due and payable.
IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first
written.
49. (SEAL)
WILL M P. BRYSON,
(SEAL)
LUCY W. RYSON
3y Qk n S6, % . (SEAL)
NANCY B. H GHES
(SEAL)
HOWARD T. HUGHES
BRYSON DEVELOPMENT AND MANAGEMENT
LIMITED PARTNERSHIP
By:
Nancy B. Hu es, General rartner
Book 730 Page 414
State of North Carolina,
County of Transylvania.
I certify that the following person(s) personally appeared before me this day, each acknowledging to me
that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity
indicated: William P. Bryson, Jr., and wife, Lucy W. Bryson
Date: & —,114- / !�-
V -j
\\\�pN) A A:.e�� Printed or typed naiWe of Notary
• commission expires: r(- 2A -- I
x
2
/C
State
State of North Carolina,
County of Transylvania.
I certify that the following person(s) personally appeared before me this day, each acknowledging to me
that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity
indicated: Nancy B. Hughes and husband, Howard T. Hughes
Date: -oC `( -- ( S
�a ign t� ure pt
Printed or typed
State of North Carolina,
County of Transylvania.
Notary
of Notary
molufm
I certify that the following person(s)
personally appeared before me this day, each acknowledging to me
that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity
indicated: Nancy B. Hughes, General Partner
Date: (o- 2,4
— I
of Notary Public
SkIc
INA, 0
Printed or typed qjine of Notary
My commission expires: - DA — (P
Book 730 Page 415
EXHIBIT "A" TO A DEED FROM BRYSON, ET AL, TO LASTINGER
Being all of that certain tract of land containing 64.54 acres, more or less, as shown on a plat
thereof recorded in Plat File 16, Slide 141 3 , Records of Plats for Transylvania County.
Together with a right of way to US Highway 276 over and along the existing driveway which
extends from the land hereinabove described to said highway, said right ofway and the rights
of obligations of each of the property owners served by said right of way being more
specifically defined in an agreement recorded in the office of the Register of Deeds for
Transylvania County in Document Book 721, page 367.
The property hereinabove described was acquired by the Grantor by instruments recorded in
the office of the Register of Deeds for Transylvania County in Deed Book 404, page 175,
Document Book 210, page 125, and Document Book 210, page 133.
William P. Bryson, Jr., and Nancy B. Hughes, as the last partners of Bryson Family of
Transylvania County Limited Partnership, join in the execution of this deed for the additional
purpose of conveying that fractional interest in former Tract A containing 7.11 acres, more
or less, as shown on a plat thereof recorded in Plat File 6, Slide 434, Records of Plats for
Transylvania County, which was mistakenly conveyed to the said partnership by a deed
recorded in the office of the Register of Deeds for Transylvania County in Document Book
137, page 780, as corrected and rerecorded in Document Book 140, page 132.
The Bryson Family of Transylvania County Limited Partnership has been dissolved by a
Cancellation of Certificate of Domestic Partnership filed with the North Carolina Secretary
of State on December 31, 2008.
wanda/exhibits/bryson.william