Loading...
HomeMy WebLinkAbout20160110 Ver 2_SF910132_REVISED FINAL Buffer Permit Drawings_20160621_201606220 N , � � 11 V � O � � � N M O V • � � V � � O V See Sheet 9-A For Index of Sheets See Sheet 9-8 For Conventlonal Symbols � r �, I ; � F � � A4 — f � � -- — 9a � �� � � . � � -� / � � �98 _ � � R h tt -� � � �_ �� ��� � � � � � � ,_ � � � � �� s �, � P�m"-, 1' i .P` , � i Q� � `\ I 4�Y . � i `_ ROGF �• � � � �� . � � (y.� �sl � I�- y � \ (j\ �I � PROIECT o ��� - � � � ' LOCATION � � - - �� � ' �� i � , � � , �� — �� �a�Fo�o � �— ��� � � ' �=>� ;-. �RE�ii-. _ � � �� � �� _ �, ,'� � , �� �r � � � , -- L`.; �. , _ _ - � � � � -I VICINITY MAP � ����� �� ����� �������� � 111 �Y ����� �� 1lJllJll�� V�`Y � Jl � WAI�E cou�T� LOCATION: BRIDGE NO. l32 OVER SMITH CREEK ON SR 2052 (ROGERS RD) TYPE OF WORI�: GRADIIVG, PAVING, DRAINAGE, AND STRUCTURE � i . 1/_ � _ _ � c� rT� � `�qO �C • `P�s��'i0 S? \o� f\ TIl�T /� EXPRESS DESIGIV BUILD: DIVISION SB — YEAR 2 � PERMIT DRAWINGS ---------------------------------------------- BRIDGE # 910132 SUBMITTAI, # S-749 R4 SUBMITTAL DATF,: 0621/16 BLJTHE BUFFER DRAWING SHEET 1 OF 7 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF WAKE FOREST DOCUMENT NOT CONSIDERED PINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS ENG7NEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Kimley>>> Horn AZ,�1NS PREPARED FOR ADT = 17,300 VPD THE NCDOT BY.• °° 50 25 0 50 700 � o� u��u���y c� DHV = 1012 STRNDARD SPECIFfCATlONS a�?� ���o PLANS � � LENGTH ROADWAY PROJECT DB5-910132 = 0.356 JEFFREY W.MOORE,P.E. �� � � 50 25 0 50 t00 T— 6% RIGHT OF WAY DATE: srcNaruRe: i� g PROJECT ENGINEER ROADWAY DF.,SIGN F..NGINLLR � o V= 45 MPH LENGTH STRUCTURE PROJECT D65-910132 = 0.019 � MAY 21, 2 013 ELlZABETH LYNCH A.E. �� aQ PROFILE (HORIZONTAL) TOTAL LENGTH OF PROJECT DB5-910132 = 0.375 � �p oc/ FUNC CLASS = RURAL PROJECT DESIGN ENG7NEER �� �� l0 � 0 t0 2o LOCAL LETTING DATE: ���a�° � SUB—REGIONAL TIER MAY 21, 2013 K.ZAK HAMIDI,P.E. xcnoT courncr r.r. PROFILE (VERTICAL) SIGNATURF.: z 0 > � NorEs: — cur o�TCH — �i TlE TO EXIST CURB & GUTTER SEE DETAiL 9, 2❑ TlE TO EX/ST SIDEyYALK SHEET 2-B ❑3 RETNN EXIST CURB RAMP o�.,�Sr�ENr oF ��„o�E SITE 1 � 5❑ RETNN R/SER AND 24'IiDPE i32-�j � P�PERIN VlC/Nl� OF Ex�STEUNDfRG�NO W�EEE�C A�ER��INE���NG 7 R�j NN EXIST ROCK CRO$5 Vq/yf.1/yTfGRATE PRqPoSfO EMBANKMfNT PROTECTION Y�/ CRO$S VANE W/ M/X7(lRE OF CLA55 B.4N� CLASS / R/P irAP ESf 2 TONS CL B R/P RAP. EST 2 70N5 CL I R/P RAP ENG/NEER TO FIELD VER/FY INSTALLA7/ON QB PLACE CLA55 /lR/P RAP�/ GFD FRO�i TOE �F SLOP/NG ABUT,�IENT RETAiN CB TO E�E OF GREENYyN' ATH. EST i3o roNS EST l 0 SY GFD Q9 SHOP CURVfD GUAROR.NL fR = 2(Y1 RETAW CB l0 RETNN rRA/ySFORMERS i5' �� RET.NN Ex�ST WALL M/D �RNN�IGE SYSTE.0 l2 RfKK PLA?ING - CLA55 ll RIP RAP y�/ GFD VY/ 15:1 SLOPfS E57 i55 TONS. EST l65 SY GFD E— SEE DET.N[ l.5/iEET 2-B N� ,,, � /Q lQ RIP R.4P EMBANKMENT PROTECrION �� - CCASS ll RlP RAP, EST lBO TO/y5 Z F pi � EST 200 SY GFD SEE DETAIL 2.ShlEfT 2-B � R 2 - l4 R/P R.4P EMBA/yK,�IENT PROTECTION � F�� �� ca-i CLASS ll R/P RAP. EST i0 TONS �- � 9 F, ��__��� � EST l0 SY GFD SEE DETNL 2.SNEET 2-B l5 RE.NOVE EXiSTING 0/AND l5'CMP � ��R-i � `? � b R O a o � ` � w 260 �; '�ii g � � 250 0 o, _ � 240 0 � m ��,��it,i�,��i � 230 �T 0 � 220 �, � N o 'i o I 0 210 �1 � i J � Q � I Y 2OO 'r � � '� ❑� ce 15' RCP-IV Y � � _ _ _ g � � CB \\\ n � � �� \ - - F � -- �5• �f �qF BCPJIII \ � ,r�e� 5. ce � ��� 5F� �R_z -----� _-- �a iii.i� � � ___ _ - � �, �F--- -R F �� � �' -*^� 3 POND I 1 � `E �.`�F R �E-�35_� � � I �-� / g� �p SS i RIP RAP � ��\ t � M OIJ�LEL RROT"E�ON \ @ RETAIN EX7END TO TOP OF � QZ EMBANKMENT . PROTECTION E57 20 70N5 ,' EST 25 SY GFD �si' .. �,e • V SEE NOTE i2 � � � � � ,'� ti�, �-�� " \ �� �'-------- � �\ , ,, - SEE NO1E i3 ez � \ .. BZz \ ..�5 EXiSTiNG BRiDGE � i� i8" RCP-iV EXCAVATION � �' � cSEE DETpiL 6, �\ SHEET 2-BI - � i e LEVEL SPREADER TiE PROP JB �'/ MH iNTO EXiSTWG PiPE ti � Q SPECIAL LATERAL 'V' DITCH. SEE DETAiL 3, StiEET 2-8 N ti W �_ E Z c ii E�— E vi C au�- _ _ _- -- _---- � W � N O � N Q � N � yy J IELBO�VS - - - F - - - - F-�,-R - - - - F- - -F z _ � - �� U �' `CLASS IIRIP RAP � TO ELEV.230.0' �� � (STRIJCTURES � � PAY ITEM. TYP) CLASS 'B" RIP RAP �\ EST 3TTONSTECTiON �� EST i0 SY GFO \� �� �� �s �� �� � \ \� � � �� 132-3 `` � �� � Zz\ 7 �5-9/0132 . . L Sto 15f05.00 �32_� � 9 CiV MILLU�C ���D Rc5" �AC/NG ' �� RESl1RFACING -L- Sia.15+05.00 ELEV = 245.90' TlE PROPOSED PAVEMENT r0 EXIST 190 -L- Sto.l5+g3.00 ELEV = 24/.68' Pl = l7+OE EL = 236. VC = 250 K=66 �� DS = 40 MPH BRIDGE HYDRAULIC DAT A DESIGIy DISCHARGE = 4500 Cf 5 DESIGN FREOUEA/CY = 50 YRS �ESIGN lyi'i' ELEVATION = 229D FT BASE OISCrIARGE = 4900 CFS BASE FREQUEIyCY = l00 YRS easE rryy E�Evar�oN = 229�o Fr OVERTOPPING DISCHARGE _ 10000 Cf5 OVERTOPPING FREOUEN�" _ >`.� YRS OVERTOPPIA/G ELEVATION = 23/22 FT DATE Of SURVEY 0//l6/20/4 y�S. ELEVATIOA/ A7 DATE OF SURVEY = 2/6b FT 0 N � 15 16 17 CL STA 20+g5.00 -L- ���oo� TYPE IN PRESTRESSED GIRDER CL ELEV = 233.73' SKEW = 75' -L- Sta.20+4� ELEV= 234.05' ■■■■ ■■■■■■■■■ � em�a�eeaem�eea ''�, PROPOSFp lG' coivc cREENw ar END BRIDGE -L- Sta.2/+45.t ELEV= 233A2' � -- -___ f-J0.6269% ___-------- ---- - --------------- f-JOb269%_ _ — _..— .—. --.=i+io52z� � - - . ' _ (+1 l55% BEGIIy SPECIAL J � i � DITCH CRAOE Lr I -L- STA 22+50 -++�.�,+���-���i IL��j. _ �� ' --_- �, _ �' , �. �} Q � ; ��� � i � ', - - --- - BM-2 J W ' _ _ _ - -L- STA 17+62.04 - OFF 83.34' RT BM-I ELEV. = 229.61, ---- - ----- N 800939 E 2145182 -L- STA 21+47.85 II', _ _ R/R SPIKE SET IN 16' PINE � OFF 109.54' RT NORMa� ELEV. = 222.35' ry �Vs.E�. = z�e.a N 800654 E 2145416 PROPOSED .5b"'SANITARY 0 EXISTING sewEP iNF iN 54°srF�i aaioce R/R SPIKE SET i- - BRIDGE 970732 PERMIT DRAWINGS � PROJECT REFERENCE NO. $HEET NO. D85-910132 4 ROAOWAY DESIGN HYDRAULIC$ ENGINEER ENGINEER DOGUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED � BL�JTHE Kimley>>> Horn i�i���i�i�i�i�i! O�O�pO��p�� • .._.. _e._. \\\\` � • . : � . • BUFFER DRAWING SHEET 2 OF 7 DATUM DESCR1PT10N iHE LOCALIZED COORDINATE SYSTE�1 DEVELOPED FOR iH15 PROJECT IS BASED ON TNE STATE PLANE COORDINATES ESTABIISHED Bv OTHERS i0R �IONU�NT "91-0132-2" �'ITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 800615.866�ft1 EASTING: 2145508.504�ft� ELEVATION� 228.897(ft) TNE AyERAGE COMBINED GRIU fACTOR USED ON THIS PROJECT IGROUND TO GRIDt IS: 0.99994051 THE N•C. LA�BERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FR0�) „91-0132-2" TO -L- STATION 22+00 ]S N 66° 38' 3" E 26.17' ALL LINEAR DIbffNSIONS ARE LOCALIZED HORIZONTAL �ISTANCES VERTICAL �ATU�I USED IS NAy� BB ENcasEMEn�r rerorHFRs� IN 12" Ty�IN OAK ��� � � � - - - -- - - -L - ROGERS RD (SR 2052I srRucruRE ExcavarioN 18 19 20 21 22 23 24 25 260 250 240 230 220 2�0 200 190 z 0 > � c a 0 0 m 0 a NorEs: — cur o�TCH — �i TlE TO EXIST CURB & GUTTER SEE DETAiL 9, 2❑ TlE TO EX/ST SIDEyYALK SHEET 2-B ❑3 RETNN EXIST CURB RAMP o�.,�Sr�ENr oF ��„o�E SITE 1 � 5❑ RETNN R/SER AND 24'IiDPE i32-�j � P�PERIN VlC/Nl� OF Ex�STEUNDfRG�NO W�EEE�C A�ER��INE���NG 7 R�j NN EXIST ROCK CRO$5 Vq/yf.1/yTfGRATE PRqPoSfO EMBANKMfNT PROTECTION Y�/ CRO$S VANE W/ M/X7(lRE OF CLA55 B.4N� CLASS / R/P irAP ESf 2 TONS CL B R/P RAP. EST 2 70N5 CL I R/P RAP ENG/NEER TO FIELD VER/FY INSTALLA7/ON QB PLACE CLA55 /lR/P RAP�/ GFD FRO�i TOE �F SLOP/NG ABUT,�IENT RETAiN CB TO E�E OF GREENYyN' ATH. EST i3o roNS EST l 0 SY GFD Q9 SHOP CURVfD GUAROR.NL fR = 2(Y1 RETAW CB l0 RETNN rRA/ySFORMERS i5' �� RET.NN Ex�ST WALL M/D �RNN�IGE SYSTE.0 l2 RfKK PLA?ING - CLA55 ll RIP RAP y�/ GFD VY/ 15:1 SLOPfS E57 i55 TONS. EST l65 SY GFD E— SEE DET.N[ l.5/iEET 2-B N� ,,, � /Q lQ RIP R.4P EMBANKMENT PROTECrION �� - CCASS ll RlP RAP, EST lBO TO/y5 Z F pi � EST 200 SY GFD -:` SEE DETAIL 2.ShlEfT 2-B � R 2 - ' l4 R/P R.4P EMBA/yK,�IENT PROTECTION � F�� ���� ca-i CLASS ll R/P RAP. EST i0 TONS — � ��� -��- EST l0 SY GFD � 9 Fi �--� � SEE DETNL 2.SHEET 2-B O �� l5 RE.NOVE EXiSTING 0/AND l5'CMP � cR-i� � 8 z � ce 15' RCP-IV Y � � _ _ _ g � � CB H / � �\ \ - - F -- �5• �f ;+qqF $CPJIII \ Q �BJ 5. ce �� � - - - � _ _ .. � a� iLl. tlY -:4� �� � �� �� -__ - - F - \�. 'F� --' _ R F �1 � -�� � � ��-� i. �, � p � � , R LPOND I ' �� �� E�5 �� I � / � ej" C�pSS I RIP R4P � � "'t ' � � Ol7�LEL Rf20�"ECriON RETAIN EXTEND TO TOP OF I� \ � Qz EMsANKMENT . PROTECTION � � . �. E57 20 TONS ,' , EST 25 SY GFD � ��, �s� , \ �/ SEE NOT@ iZ � _ ` � � ,�- � � SEE NO7E i3 � ez \ i, ai2 � �s � EXiSTiNG BRiDGE � i� i8" RCP-iV EXCAVATION � �' � cSEE DETpiL 6, �\ SHEET 2-BI - 1 � o � ` � w 260 �; '�ii g � � 250 0 o, _ � 240 0 � m ��,��it,i�,��i � 230 �T 0 � 220 �, � N o 'i o I 0 210 �1 � i J � Q � I Y 2OO 'r � LEVEL SPREADER TiE PROP JB �'/ MH iNTO EXiSTWG PiPE ti � Q SPECIAL LATERAL 'V' DITCH. SEE DETAiL 3, StiEET 2-8 N ti W �E Z c ii E�E vi �Iar - - - -� -� _- - _- C - W N O � N Q � N , yy J IE�6�0�'S - - - - - - - ---F ---- F-�,-R - F2 _ � _ �� U �' `CLASS IIRIP RAP � TO ELEV.230.0' �� � (STRIJCTURES � � PAY ITEM. TYP) CLASS 'B" RIP RAP �\ EST 3TTONSTECTiON �� EST i0 SY GFO \� �� � �s �� r, �\ �\ \ \ � �� � �� 132-3 `` ��. �_ �. � az eZ z BEGIN PROJECT DB5-9/0132 \ BEGI CO STRUCTIO �� �� L Sto 15f05.00 /32-/ ` 9 CiV MILLU�C ���D Rc5" �AC/NG ' �� RESl1RFACING -L- Sia.15+05.00 ELEV = 245.90' TlE PROPOSED PAVEMENT r0 EXIST 190 -L- Sto.l5+g3.00 ELEV = 24/.68' Pl = l7+OE EL = 236. VC = 250 K=66 �� DS = 40 MPH BRIDGE HYDRAULIC DAT A DESIGIy DISCHARGE = 4500 Cf 5 DESIGN FREOUEA/CY = 50 YRS �ESIGN lyi'i' ELEVATION = 229D FT BASE OISCrIARGE = 4900 CFS BASE FREQUEIyCY = l00 YRS easE rryy E�Evar�oN = 229�o Fr OVERTOPPING DISCHARGE _ 10000 Cf5 OVERTOPPING FREOUEN�" _ >`.� YRS OVERTOPPIA/G ELEVATION = 23/22 FT DATE Of SURVEY 0//l6/20/4 y�S. ELEVATIOA/ A7 DATE OF SURVEY = 2/6b FT 0 N � 15 16 17 CL STA 20+g5.00 -L- ���oo� TYPE IN PRESTRESSED GIRDER CL ELEV = 233.73' SKEW = 75' -L- Sta.20+4� ELEV= 234.05' ■■■■ ■■■■■■■■■ � em�a�eeaem�eea ''�, PROPOSFp lG' coivc cREENw ar END BRIDGE -L- Sta.2/+45.t ELEV= 233A2' � -- -___ f-J0.6269% ___-------- ---- - --------------- f-JOb269%_ _ - _..- .-. --.=i+io52z� � - - . ' _ (+1 l55% BEGIIy SPECIAL J � i � DITCH CRAOE Lr I -L- STA 22+50 -++�.�,+���-���i IL��j. _ �� ' --_- �, _ �' , �. �} Q � ; ��� � i � ', - - --- - BM-2 J W ' _ _ _ - -L- STA 17+62.04 - OFF 83.34' RT BM-I ELEV. = 229.61, ---- - ----- N 800939 E 2145182 -L- STA 21+47.85 II', _ _ R/R SPIKE SET IN 16' PINE � OFF 109.54' RT NORMa� ELEV. = 222.35' ry �Vs.E�. = z�e.a N 800654 E 2145416 PROPOSED .5b"'SANITARY 0 EXISTING sewEP iNF iN 54°srF�i aaioce R/R SPIKE SET i- - BRIDGE 970732 PERMIT DRAWINGS � PROJECT REFERENCE NO. $HEET NO. D85-910132 4 ROAOWAY DESIGN HYDRAULIC$ ENGINEER ENGINEER DOGUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED � BL�JTHE Kimley>>> Horn i�i���i�i�i�i�i! O�O��pO��p< . .._.. _e._. \\\\` � • . : � . • BUFFER DRAWING SHEET 3 OF 7 DATUM DESCR1PT10N iHE LOCALIZED COORDINATE SYSTE�1 DEVELOPED FOR iH15 PROJECT IS BASED ON TNE STATE PLANE COORDINATES ESTABIISHED Bv OTHERS i0R �IONU�NT "91-0132-2" �'ITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 800615.866�ft1 EASTING: 2145508.504�ft� ELEVATION� 228.897(ft) TNE AyERAGE COMBINED GRIU fACTOR USED ON THIS PROJECT IGROUND TO GRIDt IS: 0.99994051 THE N•C. LA�BERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FR0�) „91-0132-2" TO -L- STATION 22+00 ]S N 66° 38' 3" E 26.17' ALL LINEAR DIbffNSIONS ARE LOCALIZED HORIZONTAL �ISTANCES VERTICAL �ATU�I USED IS NAy� BB ENcasEMEn�r rerorHFRs� IN 12" Ty�IN OAK ��� � � � - - - -- - - -L - ROGERS RD (SR 2052I srRucruRE ExcavarioN 18 19 20 21 22 23 24 25 260 250 240 230 220 2�0 200 190 Z O > z NLET CHANNE iMPROVEMEN7S CL I RIP RAPN y�/ GFD ON BANKS p RETAIN 18'RCP ' �ESLXIRP�pRAPSINESgTRR EAMANBED * � SEE DETAILS5CSHE�T52-g 70NS CL i N SPECiAL LATERAL 'V' DiTCH �5' RCP-IV SEE DETAIL 3.SHEET 2-B REMOVE i8'RCP REMOVE/REPLACE CB 11E TO EXISTINC IB' i5" RCP-III V ry/ / ti W 2 `^ R W --- � __ ce � f_ O �B iS'RCP-N CB ce-u ca-i CB N Q � h — N CB i5'RCP-IV C I J � IB' _ - - - - - - - - R - � � E Y� I LCLASS 'B' RiP RAP ? OUT�ET PROTECTION \ EST 3 TONS � Esr �o sY �Fo b � 132-3 O Q � EOUTLET CHANNEL IMPROVEMENiS — Q CL IRR / GFD ON BANKS � EST 20 ONS.EST 40 GFD Mix Of CL B RIP RAP AND = CL IRIP RAP IN STREAM BED EST 5 70N5 CL B,ES7 7 TONS CL i SEE �E7AiL 6, SHEET 2-6 28� w 270 ___ ----- ---- ----- v; -- - — ti g � -- - --- - - - - --- � 260 - - - � '� o i , �r_,. � : - - --- o` _ _ � 250 0 °' Pl = 25f55A0 m EL = 230.85' � 240 K�= �� ., o DS = 45 MPN � 0 � 230 =- - � flIJ516% - - CLASS i RiP RAp OU7LET PROTECTiON EST 20 70NS EST 39 SY GFD �REMOVE i9 LF OF EXIST 36' RCP REMOVE BLMD JB. 30' RCP. AND fES E � �;i�� ...�" � / i5. R6P CBT�E PROP CB iN70 /�/ 3� ni EXiSTMG 36" SYS?EM RCP-m i i RETAW 36'�� REMoVE AND REPLACE RETAiN 42"—� ��B NI/ TBJB yV/ Mh'rR / RF� e2 � �, �. F e 9zq�N i � �m �j F e. � �� E � ��� � , �, �.�� _ � � e \�s ls� ��e M1 � �� \� �� �� �� \�� : � \i ,I � �/: I �\\ HYDRAULIC DATA ALU�IUyUM BOX CULVERT 1y0.30 SP,4�/ _ l5'-4'.RISE = 6'-5' DESIGN DISCHARGE = 4/0 CFS OESIGN FREOUEN�' = 50 YRS DESIGN rM1�' ELEVATION = 228J FT BASE DISCHARGE = 960 CFS BASE FREOUEA/CY = l00 YRS BASE liy� ELEVATION = 22850 fT OV£RTOPPIIyG DISCHARGE = 820 CFS OV£RTOPPIIyG FREOUEIyCY = )50D YRS OVERTOPPIA/G ELEVATIOA/ = 23199 FT DATE OF SURyEY 01/l6/20/4 �ys. E�vanoN AT DATE OF SURVEY = 223b FT �, r+�o52/. 0 o- ----- o L20 � . ., . _ I� . � � ALUMM�M BOX CULVERT srauctuaE No.so � CL STA 27+25 -L-.SKEy� = i02° SPAN = IS'-4"; RISE = 6'-5" � SITE 2 �EN�TH _ ��2.5- „ � iNV W= 222.5, iNV OUT = 22i.4 BURIE P NPSTREAM ON Y) HEAD ALLS UP AND DO�NSTREA�M � i' CD CRETE 9LL iNSET 2' FROM H�y , II roe Pa rEcr�oH �32-6 � 'i�i � �SEE DE�AiL 4, �I SHEE7 2-B II'��I � � 45 5Y PSRM �� � I� ��I.� N� r^- o` � JBT'N/MH � ��, � 1I Ir'��� � -��FaFT �� . R TAIN C8 � A�D 36'RCP � � -- � �—�—�1� . , ��c , �_ RETAiN MH RETAW MH L RETdiN 24' RETAiN 24' ISRCP-I /32-7 CB i5"RCP-ly —� tl�T.��i}y�i{}�#E17.�d3�J-' . _ 1 TOE PROTECiION S@EgE DETAIL T.Sh'EET 2-B EST 100 TON ��pL B RIP RAP 132-9 WE 293H PROJECT REFERENCE NO. $HEET NO. BRIDGE 970132 D85-910132 5 ROAOWAY DESIGN HYDRAULIC$ PERMIT DRAWINGS ENGINEER ENGINEER c� CR- / s� �� ii����: � � � � - Pl = 34+20.00 � . � .. --- ----- ----- ---- - - - --- - --- ---- - - EL = 259.25 - ' - - - - - -- - - Pl = 33+15A0 VC = 80' � � � --- E[ = 25/.94' K = 96 y15�. - ' � � _ -- - - - - - - - --- DS = 40 MPH �+)5� - - - ---- - - - - VC = l20' - - , - ,-- - -- - - K = 79 - - - DS = 40 MPH � . i- - --- ---- PI = 30t30A0 - -_ I �+1'fA��% II -- - - - - - VC - 45032 , �+1548�7/. � K = l04 � - - ' - DS = 50 MPH I - - �+15Aa�1'/• . , f +IIJ516% i-- - - - - - - - ;- �` - --- - - -- - - . �� 'L — J70. J9 *t3D.VV ELEV = 262.71' T/E PROPOSED PAVEMENT r0 EXIST DOGUMENT NOT GONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED � BL�JTHE Kimley>>> Horn � At,IOWABIE IMPACfS ZONE I � ALLOWABI.E IMPACTS ZONE 2 MI7IGABLE IMPACTS ZONE 1 � MITIGABLE IMPACTS ZONE 2 BUFFER DRAWING SHEET 4 OF 7 280 270 260 250 240 230 220 Q £NO SPECiA� � --- ALUMINUM BOX CULVERT - -- ------ ---- - ----- ---- - ----- - ---- -- -- - ---- ----- ---- - ---- - ---- � - - ------ ---- - -- -- ---- OITCN GRAOE CT j- 5rRUCTURE N0. 30 I Y 2�� -L- STA 25+50.00 - - - - - - - - - - - - - - - - - - - - - - - 2�� - - - - - - LV= � li i i, �,—� �, _,—�._.. � _ _._.. ._..�. _._.. � _ i .i I . il �� � - . _ - � 200 - —L — ROGERS RD (SR 2052) zoo 0 N N 25 26 27 28 29 30 31 32 33 34 35 36 � Z O > z NLET CHANNE iMPROVEMEN7S CL I RIP RAPN y�/ GFD ON BANKS p RETAIN 18'RCP ' �ESLXIRP�pRAPSINESgTRR EAMANBED * � SEE DETAILS5CSHE�T52-g 70NS CL i N SPECiAL LATERAL 'V' DiTCH �5' RCP-IV SEE DETAIL 3.SHEET 2-B REMOVE i8'RCP REMOVE/REPLACE CB � � � �11E TO EXISTINC IB' V � W _ `^ R � --- _ ce � � o �B isRcp iv ce ��-� �R-� ce N Q � h — N CB 15'RCP-I C I J � i8' _ - - - - - - - - R - � J � � E �� LCLASS 'B' RiP RAP ? � OUT�ET PROTECTION \ EST 3 TONS � Esr �o sY �Fo � 132-3 O Q � EOUTLET CHANNEL IMPROVEMENiS — Q CL IRR / GFD ON BANKS � EST 20 ONS.EST 40 GFD Mix Of CL B RIP RAP AND = CL IRIP RAP IN STREAM BED EST 5 70N5 CL B,ES7 7 TONS CL i SEE �E7AiL 6, SHEET 2-6 28� w 270 ___ ----- ---- ----- �; -- - - ti g � -- - --- - - - - --- � 260 - - - � '� o i , �r_,. � : - - --- o` _ _ N 250 � 0 °' Pl = 25f55A0 m EL = 230.85' � 240 K�= �� ., o DS = 45 MPN � 0 � 230 =- - � flIJ516% - - ti� i CLASS i RiP RAp OU7LET PROTECTiON EST 20 70NS EST 39 SY GFD �REMOVE i9 LF OF EXIST 36' RCP REMOVE BLMD JB. 30' RCP. AND fES E X��.�h��:� :. '�r � ` 15�� R6P CBTiE PROP CB M70 /�/ /36" ni EXiSTMG 36" SYSTEM RCP-m i i RETAW 36'�� rREMpVE AND REPLACE RETAiN 42"—� /^�B ry/ TBJB yV/ Mh' rR ��� �l' ,� ,`�� / / �\�.� y �\��\ / m � �,M1 ``,` �\ . \\ b ��BZ _�1� , �-�: � \i ,I � �/: I �\\ HYDRAULIC DATA ALU�IUyUM BOX CULVERT 1y0.30 SP,4�/ _ l5'-4'.RISE = 6'-5' DESIGN DISCHARGE = 4/0 CFS OESIGN FREOUEN�' = 50 YRS DESIGN rM1�' ELEVATION = 228J FT BASE DISCHARGE = 960 CFS BASE FREOUEA/CY = l00 YRS BASE liy� ELEVATION = 22850 fT OV£RTOPPIIyG DISCHARGE = 820 CFS OV£RTOPPIIyG FREOUEIyCY = )50D YRS OVERTOPPIA/G ELEVATIOA/ = 23199 FT DATE OF SURyEY 01/l6/20/4 �ys. E�vanoN AT DATE OF SURVEY = 223b FT �, r+�o52/. 0 o- ----- o L20 � . ., . _ I� . � � ALUMM�M BOX CULVERT srauctuaE No.so � CL STA 27+25 -L-.SKEy� = i02° SPAN = IS'-4"; RISE = 6'-5" � SITE 2 �EN�TH _ ��2.5- ,,; � iNV W= 222.5, iNV OUT = 22i.4 BURIE P NPSTREAM ON Y) HEAD ALLS UP AND DO�NSTREA�M II i' CD CRETE 9LL iNSET 2' FROM H�y �, � 132-6 � � TOE PRa TECTiON II �I �SHEEDETAg 4, II �� � 45 Sv PSRM �,. a I III.__ r� 1 RE7AIN . .^,II'.. JB '�/MH C``+=' �I ',{I I �i . �I � �.. \ \ -��FSFT � . RE TAIN C8 � � ��'� AND 36'RCP � � ... ,' ,' - ,��. ��n ��' ���=--- . �-' '-� I_ . II � , RETAW MH RETAW MH � ReTe�N za• aErn�N za• ISRCP-I /32-7 CB i5•q�p_�� ���'�1-'e17H-0d$�3:,il�n — ?OE PROTECiION S@EgE DETAIL T.Sh'EET 2-B EST 100 TON ��pL B RIP RAP 132-9 WE 293H ���T --- ----- ----- ---- ----- ----- ---- - - Pl = 34+20.00 - EL = 259.25 - - - - - -- - - - Pl = 33+15A0 VC = 80' EL = 25/.94' K = 96 I ----- --- ----- DS = 40 MPH - - -- ---- - - - -- - -- VC = l20' - - - - - -- - - K = 79 - DS = 40 MPH . - - --- ---- PI= 30t30A0 - -- �/ EL = 236.32' �+17� VC = 450' - 15,4g0' + K = l04 - ( DS = 50 MPH �+15Aa�1'/• . , f +IIJ516% i-- - - - - - - - ;- �` - --- - - -- - - . �� Q £NO SPECIA� r-- ___ ALUMINUM BOX CULVERT ___ � - - ------ 07Crt GRAOE tT j- 5rRUCTURE N0. 30 _ Y 2,�0 -L- STA 25+50.00 LV= � li PROJECT REFERENCE NO. $HEET NO. BRIDGE 970132 D85-910132 5 ROAOWAY DESIGN HYDRAULIC$ PERMIT DRAWINGS ENGINEER ENGINEER i i r�,� ,. I w I �� � �� � VA' T: � �� ', . 'i�`SS`�„'r': �' � ` �6 ` �V �r ` � � RET AIN � ��' � ���( - � ca= ���_ _ - .. cc� � c�� ca- � �-� i � ���: � � ��� _ ' i�� �+)526�5�' � 'L — J70. J9 *t3D.VV ELEV = 262.71' T/E PROPOSED PAVEMENT r0 EXIST DOGUMENT NOT GONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED � BL�JTHE Kimley>>> Horn � At,IOWABIE IMPACfS ZONE I � ALLOWABI.E IMPACTS ZONE 2 MI7IGABLE IMPACTS ZONE 1 � MITIGABLE IMPACTS ZONE 2 BUFFER DRAWING SHEET 5 OF 7 280 270 260 250 240 230 220 � 210 � , �i .�i _ � '�' � � - . _ - � � 200 - —L — ROGERS RD (SR 2052) zoo 0 N N 25 26 27 28 29 30 31 32 33 34 35 36 � z 0 > � 0 .y 0 0 � N 0 � � � 0 � J Q � Y 2.0 Ft DETAIL 1 ROCK PLATING DETAIL ( Not io Scole) � SHOULDER POINT — 0�2.0 ft CLASS II RIP RAP �� � 3.Ofr � JS MIN. OVERLAP � ��� �TOE OF SLOPE ��S � � ����°F FABRIC OVERLAP DETAIL GEOTEXTILE � r (� ( Not to Scale� 10 ft OVERLAP (IF REQUIRED) ����-� 3.5 ft FROM STA. 19 + 50 TO STA. 20 + 30 -L- (RT) DETAIL 4 TOE PROTECTION � Not io Scale) �� NATURAI � `L1 ��� I GROUND �\ Q� � d CI= Z Ft. FILL � i.1= Z Ff. SLOPE Type of Liner= PSRM FROM STA. 28 + 50 TO STA. 29 + 50 -L- (LT) DETAIL 7 TOE PROTECTION � Not to Scale) DETAIL 2 RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch �.0'mi� Grade 2'0 � � GEOTEXTILE of Liner= Class II Rip Rap �+Ar+:la Fnl,r�r STA.20+83 -L- (LT} STA. 20+95 -L- (RT) STA. 28 + 30 -L- (RT) FROM STA. 11 + 84 TO 13 + 26 -Gl- (RT) DETAIL 5 TYPICAL SECTION - INLET CHANNEL IMPROVEMENTS ( Not to Scole) EX/ST EXIST 2� 92"W X 72"H GROUND CMP ARCN EXCAVATION �, _ _____ �\ �. 1.5:1 SLOPE W/ = � � � � CLASS / R/PRAP AND 6% `5 GEOTEXTILE FABR/C - -' — - - �= -- ON BANKS fTYP1 r � M/X OF CLASS B AND �-�-�5�-q�� CLASS l R/P RAP COUNTER-SUNK INTO UPSTREAM CNANNEL TO TOP OF PROPOSED SILL O`� FILL NATURAL � ��,'C��� SIOPfi GROUND d GEOTEXTILE d - 2.0 Ft. Type of Liner= Class 'B' Rip-Rap FROM STA. 30+35 TO STA. 32+50 -L- (RT) STA. 27+13 -L- (RT) PROPOSED ALUM/NUM BOX CULVERT "30 �-' y 2 Tl.0' BUR/ED 1' P CONCRETE S/LL /NSET 2' FROM FACE OF HEADWALL BRIDGE 970132 PERMIT DRAWINGS DETAIL 3 SPECIAL LATERAL 'V' DITCH � Not to Scale) Natural � 3� � pj�� Ground 3•� $Io e D P Min. D= 1.0 Ft. FROM STA. 22 + 50 TO STA. 25 + 50 -L- (LT) PROJECT REFERENCE NO. $HEET NO. D85-910132 2-B ROAOWAY DESIGN HYDRAULIC$ ENGINEER ENGINEER DOGUMENT NOT GONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED � BLJTHE Kimley >> Horn BUFFER DRAWING SHEET b OF 7 DETAIL 6 TYPICAL SECTION - OUTLET CHANNEL IMPROVEMENTS � Not to Scale� EX/ST EXIST 2@ 92"W X 72"H PROPOSED ALUM/NUM GROUND CMP ARCN BOX CULVERT *30 _ ,c._ / ' \ , . / ' ..,�,�,crs�S _ _______ � � �� ___ 1.5:1 SLOPE W / '� CLASS / R/PRAP AND �EOTEXTILE FABR/C ON BANKS fTYP1 EXCAVAT/ON 2' � l5' -4" �;� MlX OF CLASS B AND CLASS / R/P RAP COUNrER-SUNK INTO DOWNSTREAM CHANNEL STA. 2 7 + 36 -L- (LT) DETAIL 9 CUT DITCH ( Not to Scale) � Front oC Ditch Natural � �,'.� e< Slope Ground 2•� p F\a�` Min. D = 1.0 Ft. FROM STA. 11 + 85 TO STA. 12 + 12 -Gl- (RT) BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ftz) (ft2) (ft2) (ftz) (ftz) (ft2) (ft2) (ftz) -L- 20+04.69 to 1 Bridge 20+43.15 (LT) X 373.0 1528.9 1902.0 -L- 20+31.66 to 1 Bridge 20+43.15 (RT) X 207.7 207.7 -L- 20+43.15 to 1 Brid e 20+76.91 (LT) X 1921.3 1921.3 -L- 20+43.15 to 1 Brid e 21+07.48 (RT) X 1963.4 848.5 2811.9 -L- 20+83.20 to 1 Brid e 21+33.10 (LT) X 2798.8 829.7 3628.6 -L- 21 +00.36 to 1 Brid e 21+33.10 (RT) X 1030.9 1030.9 -L- 21 +33.10 to 1 Bridge 21+47.54 (LT) X 751.9 751.9 -L- 21+33.10 to 1 Bridge 21+86.77 (RT) X 1021.1 687.1 1708.2 -L- 26+65.88 to 2 Aluminum Box Culvert 27+68.19 (LT) X 1481.4 392.6 1874.0 -L- 27+46.26 to 2 Aluminum Box Culvert 28+83.92 (LT) X 3489.8 79.3 3569.1 -L- 26+48.54 to 2 Aluminum Box Culvert 26+99.12 (RT X 821.0 335.0 1156.0 -L- 27+19.56 to 2 Aluminum Box Culvert 27+50.00 (RT X 771.5 771.5 -L- 29+11.64 to 2 Roadwa 30+80.38 RT X 854.4 2260.3 3114.7 TOTAL: 15672.2 5660.8 21333.1 854.4 2260.3 3114.7